You are on page 1of 5

ER437 – PROPOSED LIFT SHAFTS TO

EXISTING PEDESTRIAN OVERHEAD


BRIDGE

METHOD OF STATEMENT
FOR PAINTING WORKS

Remarks/
Checked and
Revision Description of
Date Prepared By Approved By Main Review By WSHO
Number Revision/ Status
Contractor
R0 07-07-2016 1st - Submission Ragu
Contract ER437:
Proposed Lift Shafts to Existing Pedestrian Overhead Bridge

MAIN CONTRACTOR :TAI YONG CONSTRUCTION PTE LTD

WORK WOULD BE CARRY BY :


LBE ENGINEERING PTE LTD

Date : 1st July 2016 Revision No : 0


TITLE: METHOD STATEMENT FOR PAINTING WORKS

1.0 OBJECTIVE
The objective of this method of statement is to describe the sequence of works and
other imminent measures involved in painting. Works shall be carried out in compliance
with the drawings, project specifications and materials.

2.0 SCOPE OF WORK


The work shall include all labour, materials, and equipment that is necessary for the
application of painting work for steel works.

3.0 PERSONAL INVOLVED


a. Site supervisor
b. Site engineer
c. painter
d. General workers

4.0 EQUIPMENT/TOOLS

1. Primer/Paints
2. Pail
3. Abrasive paper
4. Painting Roller.

References
1. Scope of works or specification
2. Manufacturer Data sheet
3. Approved drawing

2
Contract ER437:
Proposed Lift Shafts to Existing Pedestrian Overhead Bridge

MAIN CONTRACTOR :TAI YONG CONSTRUCTION PTE LTD

WORK WOULD BE CARRY BY :


LBE ENGINEERING PTE LTD

Date : 1st July 2016 Revision No : 0


TITLE: METHOD STATEMENT FOR PAINTING WORKS

5.0 WORK PROCEDURES.

 Preparation

 Hardware materials which are already fixed and not to be painted shall be
removed. Removal if not possible, it shall be covered/protected appropriately
before surface preparation and painting will commence.

 Clean and prepare steel surface to be painted. Efflorescence, chalk, dust, dirt,
grease and oils shall be removed.

 The surface of the area to be painted would be prepared by removing loose


particles, blemishes and deleterious materials by way of sanding.

a. Paint Application:

 One coat of shop applied coating would be applied. Each coat shall have an
interval time of 4 hours for curing. Before the application of further coatings,
sanding would be done for cleaning and removing of splattered, blemishes
and stains on the painted surface.

 Then two coats of shop applied coating would be applied as per the approved
specification and color.

 A final coating of shop-applied paint would be applied as per the approved


specification and color.

3
Contract ER437:
Proposed Lift Shafts to Existing Pedestrian Overhead Bridge

MAIN CONTRACTOR :TAI YONG CONSTRUCTION PTE LTD

WORK WOULD BE CARRY BY :


LBE ENGINEERING PTE LTD

Date : 1st July 2016 Revision No : 0


TITLE: METHOD STATEMENT FOR PAINTING WORKS

6.0 SAFETY PRECAUTIONS


a. The persons involved shall inspect and examines the site and its surroundings, and
fields check all details in the drawings prior to commencement of work defined in
the scope of work.
b. To brief all workers regarding safety requirement at site and working at height area.
All workers must strictly follow the safety rules and regulations as outlined in the
safety and health manual.
c. Plan and maintain a tidy site and work area
d. Prevent workers from unnecessary risk.
e. Always maintain all equipment in good working order.
f. Basic PPE to be worn by all staff or laborers.
g. All operatives involve in this work shall be inducted before entering the site.
h. Tool box talk shall be conducted regularly.

7.0 PLANNING

As per work schedule

8.0 QUALITY PLAN


As standard set by LBE Engineering Pte Ltd.

9.0 SAFETY PLAN


As standard set by LBE Engineering Pte Ltd.

4
Contract ER437:
Proposed Lift Shafts to Existing Pedestrian Overhead Bridge

MAIN CONTRACTOR :TAI YONG CONSTRUCTION PTE LTD

WORK WOULD BE CARRY BY :


LBE ENGINEERING PTE LTD

Date : 1st July 2016 Revision No : 0


TITLE: METHOD STATEMENT FOR PAINTING WORKS

You might also like