You are on page 1of 2

LIGHT VEHICLE WORKSHOP FACILITY

BENGALON COAL PROJECT


JOB DESCRIBTION : LV WASHPAD & OIL TRAP

Note : Unit price is indication only, for actual price depends on negotiation with contractor
Unit Price Total Price
No Description Volume UNIT
IDR IDR

1 Preliminary Works
1.1 Mobilization & Demobilization 1.00 ls -
1.2 Rent of house for workers 1.00 ls -
1.3 MCU for workers 1.00 ls -
1.4 Antigen & PCR Test 1.00 ls -
1.5 Temporary electricity & water for works (Cable, Pipe, & Tank only ± 50 m') 1.00 ls -
1.6 Setting out, site clearing, leveling, cut & fill 1.00 ls by other
1.7 Site engineering and detail design 1.00 ls by other
Sub Total 1 -

2 LV WASH PAD
2.1.1 Light Vehicle Concreate Slab T = 200 mm
- Concreate 30 Mpa 29.264 M3 -
- Reinforcement D13-200 (2 layer) 3,048.972 kg -
- Dowel Bar D16 - 300 L = 600 mm & Accessoris 20.833 kg -
- Fromwork 18.720 m2 -
2.1.2 Bundwall & curb Light Vehicle concrete
- Concreate 30 Mpa 4.798 M3 -
- Reinforcement D13-200 (2 layer) 302.563 kg -
- Fromwork 47.190 m2 -
2.1.3 Pad Footing For LV Ramp ( 800 x 3700 x 200 deep )
- Concreate 30 Mpa 4.144 M3 -
- Reinforcement 575.676 kg -
2.1.4 Pedestal For LV Ramp ( 200 x 1300)
- Concreate 30 Mpa 1.300 M3 -
- Reinforcement 265.681 kg -
- Fromwork 15.000 m2 -
2.1.5 Beam For LV Ramp ( 200 x 300)
- Concreate 30 Mpa 0.984 M3 -
- Reinforcement 825.564 kg -
- Fromwork 20.978 m2 -
2.1.6 Slab For LV Ramp
- Concreate 30 Mpa 4.720 M3 -
- Reinforcement 710.301 kg -
- Fromwork 44.577 m2 -
2.1.7 Plastic Sheet 2 Layers 310.000 m2 -
2.1.8 Sand Under Slab T = 100 mm and Compacted 40.320 M3 -
2.1.9 Excavation Soil 60.192 M3 -
2.2.1 Backfill and Compacted Soil for Footing 7.050 M3 -
2.2.2 Construction Join
- Mortar Gout 94.800 m -
2.2.3 WF 150 x100 x 6 x 9 407.008 kg -
2.2.4 UNP 150 x 75 x 6.5 580.011 kg -
2.2.5 Handrailing, T = 0.9 m bahan pipa Galvanize Dia 2" 18.272 m' -
2.2.6 Webforce Grating 7.309 m2 -
Sub Total 2 -
LIGHT VEHICLE WORKSHOP FACILITY

BENGALON COAL PROJECT


JOB DESCRIBTION : LV WASHPAD & OIL TRAP

Note : Unit price is indication only, for actual price depends on negotiation with contractor
Unit Price Total Price
No Description Volume UNIT
IDR IDR

3 Oil Trap
3.1.1 Concreate Slab T = 180
- Concreate 30 Mpa 45.694 M3 -
- Reinforcement D10-200 (2 layer) 2,717.250 kg -
- Fromwork 140.360 m2 -
3.1.2 Plastic Sheet 2 Layers 253.968 m2 -
3.1.3 Lean concrete t=100mm 13.104 m3 -
3.1.4 Sand Under Slab T = 100 mm and Compacted 13.104 M3 -
3.1.5 Excavation Soil ( Equipment by DH) 192.036 M3 -
3.1.6 PVC Pipe Diameter 150 mm AW Ex. Wavin 50.000 m -
3.1.7 Gate Valve 6 " + Flange 3.000 ea -
3.1.8 Backfill and Compacted Soil ( Equipment by DH) 15.000 M3 -
3.1.9 Colorbond Fence h=2m c/w Post, Girt & Anchor 60.000 m -
3.2.1 Handrailing, T = 0.9 m bahan pipa Galvanize Dia 2" 18.000 m' -
Sub Total 3 -

4 Water Storage Cap. 20 KL


3.1.1 Concreate Slab T = 180
- Concreate 30 Mpa 6.188 M3 -
- Reinforcement D10-200 (2 layer) 406.643 kg -
- Fromwork 64.600 m2 -
3.1.2 PVC Pipe Diameter 3 Inch AW Ex. Wavin 4.000 m' -
3.1.3 Gate Valve Galvanized 3 inch + Flange 1.000 ea -
Sub Total 4 -

5 Accessories
5.1.1 Pompa air Ebara Head 80m, 300 l/menit (+acc ) 1.000 ea -
5.1.2 Piping Galvanized GIP 3" Sch 40 + Painting 40.000 m' -
5.1.3 Piping Galvanized GIP 1" Sch 40 + Painting 35.000 m' -
5.1.4 Gate Valve 3 " 2.000 ea -
5.1.5 Accessories 1.000 ls -
5.1.6 Hose reel + hose + Valve + nozzle 1,5" 30m 1.000 ea -
5.1.7 Sprinkler 6.000 ea -
5.1.8 PVC Pipe Diameter 150 mm AW Ex. Wavin (from Oil Trap) 50.000 m -
5.1.9 Support pipe 1.000 ls -
5.2.1 Rumah Pompa 1.000 ls -
Sub Total 5 -

6 Painting Work
6.1.1 Painting & Finshing work, Jotun/Equivalen 987.02 kg -
(Primer & Top Coating)
Sub Total 6 -
Grand Total -