LANTAI DAN 2 BILIK AIR SEDIA ADA UNIT B9-3-03 ANJUNG VISTA APARTMENT
Kada
Bi r Jumlah
Butiran Kerja Unit
l Harga (RM)
(RM)
Syiling 1200
1. Demolish
2. Install
3. Repair aircond pipe
Painting
1. Kerja kerja mengecat dinding 7ft x 3ft :
I. Undercoat 2Liter 1box 350
II. Nippon 5Liter 1box 280
Wall ( Repair )
1. Skim coat base 1bag 30
2. Skim coat finishing 1bag 30
3. Plaster : base 21sqft 6.50 136.50
Finishing 21sqft 6.50 136.50
Total 5720