Professional Documents
Culture Documents
CLIENT:
C:\Users\engs\Documents\2117-B01-A_Omar_Bahaa.rvt
S T U V
PROJECT MANAGER
1:19 EL 128.600
UPPER ROOF CONSULTANT:
ECG
1:5
ROOFING F5 METAL F5
ENGINEERING CONSULTANTS GROUP S.A.
LAYERS AE589 COPING AE589 www.ecgsa.com
H H
3100
3600
REMARKS:
o FGL = 100000 (FIXED LEVEL)= 71.2m.
o FFL = FINISHED FLOOR LEVEL.
o TOC = TOP OF CONCRETE.
o FPL = FINISHED PAVEMENT LEVEL.
0
o FRL = FINISHED ROAD LEVEL.
o TOPR = TOP OF PARAPET.
EL 125.000
o FCL = FINISHED CEILING LEVEL ( FROM FFL)
ROOF FLOOR PLAN TOC
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETER AND ALL LEVELS ARE IN
METER UNLESS OTHERWISE NOTEDTHIS.
3900
3900
3900
3. ALL TOILETS WALLS SHALL BE CONSIDERED SOLID BLOCKS.
2700
PANTRY FI 3070 5. FOR STRUCTURE ELEMENTS REF. TO STR. DRAWINGS.
G MEETING ROOM FI 3071 G
FI 3072 6. FOR MISSING DIMENSIONS REF. TO ID DRAWINGS.
GLASS TYPES
EL 121.100 SYMBOL DESCRIPTION
4000
4000
4000
12 mm THICK CLEAR FULLY TEMPERED GLASS
3750
WAITING AREA COMPUTER ZONE BOOK SHELVES BOOK SHELVES
GLASS TYPE A
FU 3079 FU 3071 FU 3070 FU 3070 D1
GENERAL NOTES
AE563
• ALL GLAZING CONFIGURATIONS ARE THE MINIMUM AND SHOULD BE
VERIFIED STRUCTURALLY
• HARDWARE FOR ALL ALUMINIUM OPENING SHALL BE ACCORDING TO
MANUFACTURER STANDARD
16650
F GLASS TYPE B EL 117.100 F
FOURTH FFL
4000
4000
4000
28150
2750
ENTRANCE WORK SPACE LOGISTIC HEAD OF DEP.
TH 3076 TH 3072 TRUSS FIXATION TO FLOOR TH 3070
A8
AE592
EL 113.100
THIRD FFL
ALUMINIUM A8
LOUVERS AE589
E E
4000
4000
RECEPTION WORK SPACE SECR.
S 3072 S 3071 S 3067
EL 109.100
SECOND FFL
GLASS TYPE C
EL 105.100
FIRST FFL
8650
8650
8650
8400
8400
PAINT ON CEMENT A1
PLASTER WITH REVEALS AE305
8/2/2016 4:09:44 PM
C C
EL 100.450
GROUND FFL
3950
GYMNASIUM
2400
PROJECT TITLE:
EL 96.500
1ST BASEMENT TOC AAST SMART VILLAGE
CAMPUS
400
DISCIPLINE
3450
ARCHITECTURAL
50 mm
SHEET TITLE
WALL SECTION 3
EL 93.000