BANK
Reflected ceiling
design and
coordination is a
core project element
that starts from the
beginning of the
design phase and
develops till the end
of the tender
documents
submissions.
INTRODUCTION
WOODGROVE 3
BANK
DESIGN GUIDELINES
a. Material selection:
While choosing ceiling material, understanding its properties is of primary importance to determine
whether it will meet your requirements.
So it depends on:
1. The space function regarding: fire rating, sound attenuation, durability, etc….
2. The Geometry of space.
3. Location in plan (external or internal).
4. Maintenance at ceiling void regarding other disciplines.
5. Environment.
6. Availability in local country.
The most used materials in the making of false ceiling are:
- Gypsum false ceiling.
- Metal false ceiling.
- Wooden false ceiling.
- Mineral Fiber false ceiling. WOODGROVE 4
BANK
DESIGN GUIDELINES
a. Material selection:
WOODGROVE 5
BANK
DESIGN GUIDELINES
a. Material selection:
WOODGROVE 6
BANK
DESIGN GUIDELINES
a. Material selection:
WOODGROVE 7
BANK
DESIGN GUIDELINES
b. Design criteria:
Some design criteria should be taken in consideration during the design stage of reflected ceiling in
plan:
1. Tiles distribution (600x600mm, 600x1200mm, etc…):
For example:
“ODD” No. OF TILES: Lighting fixtures are distributed on the 2 sides of the center line in the space.
WOODGROVE 8
BANK
DESIGN GUIDELINES
b. Design criteria:
WOODGROVE 9
BANK
DESIGN GUIDELINES
b. Design criteria:
WOODGROVE 10
BANK
DESIGN GUIDELINES
b. Design criteria:
WOODGROVE 11
BANK
DESIGN GUIDELINES
b. Design criteria:
4. Relation between Reflected ceilings with External Glazing system(Ex: wet areas, toilets, etc…)
• Reflected ceiling can be connected to the • Curtain cove can be provided between curtain
transom of the curtain wall. (Same level) wall & reflected ceiling
WOODGROVE 12
BANK
DESIGN GUIDELINES
b. Design criteria:
4. Relation between Reflected ceilings with External Glazing system(Ex: wet areas, toilets, etc…)
WOODGROVE 13
BANK
DESIGN GUIDELINES
b. Design criteria:
5.Exposed Ceiling
In exposed zones such as storage the STR element will appear such as (beams , drop panels, difference
in slab thickness, purlins and girders).
WOODGROVE 14
BANK
FILE
PREPARATION
WOODGROVE 15
BANK
FILE PREPARATION
AutoCAD File
1. lay-off: Doors , Plan levels , furniture , ramps & stair at entrances , sanitary , plan
dimension & elevation symbol)
2. Show Axis and Dimension between.
3. Show Section Tags.
4. Show Room name and Finish Levels
WOODGROVE 16
BANK
FILE PREPARATION
Fixture Blocks and Legend
WOODGROVE 17
BANK
FILE PREPARATION
Fixture Blocks and Legend
WOODGROVE 18
BANK
COORIDNATION
WOODGROVE 19
BANK
COORDINATION
IN CONVENTIONAL BUILDINGS
1. ELEC.
2. HVAC
4. COMMUNICATION
WOODGROVE 20
BANK
COORDINATION
A. ELEC. (LIGHTING)
Add a footer
WOODGROVE 21
BANK
COORDINATION
A. ELEC. (LIGHTING)
Add a footer
WOODGROVE 22
BANK
COORDINATION
B. HVAC
If the distribution of There are two ways to distribute HVAC diffusers in the
HVAC diffusers is corridor tiles.
staggered keep it as it is
Staggered:
Centered:
Add a footer
WOODGROVE 23
BANK
COORDINATION
B. HVAC
May be the type of HVAC diffusers differ according to space furniture & HVAC process
Add a footer
WOODGROVE 24
BANK
COORDINATION
B. HVAC
Add a footer
WOODGROVE 25
BANK
COORDINATION
B. HVAC
After coordination ask the HVAC engineer to send the Minimum distance between the
location of the access panels in the boards as it is HVAC diffuser and the detector
going to appear in the RC plans. (center to center) is 1 meter
Gypsum tiles can be used as access panels, but the used tile
Add a footer
WOODGROVE 26
must be without any fixtures BANK
COORDINATION
C. MECHANICAL (FIRE FIGHTING)
Add a footer
WOODGROVE 27
BANK
COORDINATION
C. MECHANICAL (FIRE FIGHTING)
Add a footer
WOODGROVE 28
BANK
COORDINATION
C. MECHANICAL (FIRE FIGHTING)
Add a footer
WOODGROVE 29
BANK
START COORDINATION
D. COMMUNICATION
Final step to be coordinated with elec., HVAC, firefighting disciplines
Add a footer
WOODGROVE 30
BANK
START COORDINATION
D. COMMUNICATION
Final step to be coordinated with elec., HVAC, firefighting disciplines
Add a footer
WOODGROVE 31
BANK
4.CEILING SHEET ANNOTATION
• Do not show any levels for areas without suspended ceiling
• Add Dimensions for spacing between fixtures (mainly electrical lighting fixtures) on Gypsum board (or ceiling
type without tiles) & exposed Spaces at Scale 1/50
Add a footer
WOODGROVE 32
BANK
WOODGROVE 33
BANK
WOODGROVE 34
BANK
WOODGROVE 35
BANK
QUESTIONS?
WOODGROVE 36
BANK
Although the guidelines are describing all steps &
procedures of producing suspended ceilings, still
special projects might have their own criteria.
THANK YOU