REGENERATING DEWAN SERI BUDIMAN, UiTM

MUHAMMAD AZAMMUDDIN BIN HASANUDIN, DR ROHASLINDA RAMELE @ RAMLI, SR HIKMAH BT KAMARUDDIN

ABSTRACT REFURBISHMENT PROJECT


Dewan Sri Budiman is located at Universiti Teknologi MARA, Shah Alam, Selangor, which was
formerly used as a convocation hall. This research was done to identify issues regarding the Existing
current condition of the hall, and to reveal its architectural and historical value. Dilapidation
survey using defect analysis method was done to clarify the overall condition of the hall,
measured drawing was carried out and a SWOT analysis was done. Findings showed that the
hall is in ‘fair’ condition, where the most types of defects found was damage and peeling of
paint in both internal and external parts of the building. Meanwhile, the element with the highest
numbers of defects was the internal ceiling and the highest category of defects found was the
maintenance. Despite the minor damage found during the dilapidation survey, this hall has
shown several strength and opportunity to be refurbished and reused as the most important
building in UiTM. Built as a convocation hall, it is spacious which is suitable for any events, and
can easily accessed from the main entrance. It is also important to reveal its architectural

Indication Plan Proposal


value, which has been built during the establishment of the university itself with a modern
architectural style.

INTRODUCTION
Dewan Sri Budiman located at the UiTM Shah Alam and was built on 1976. This building one of
the oldest building for education purpose. Previous functions of the building for convocation day,
examination hall, performance UiTM’s student and also talks. But nowadays, this building no
longer used due to cannot cater the big capacity of student for big event such as convocation
day. Approximate area of the Dewan Sri Budiman is 3369.41 and proved this building no
suitable for big event with high capacity students.

METHODOLOGY `
• Interview – Interview with person in charge Unit Fasilitis UiTM regarding history,
maintenance plan and SWOT.
• Measuring (Drawing) - The measuring method used on measured drawing purposely to
CONCLUSION AND RECOMMENDATION
convert the house into a 2D model and 3D model for references in future. As a conclusion, the overall condition of Dewan Seri
• Photo - This method will be used to capture the existing defects on site to determine the Budiman,UiTM is in a FAIR condition. However, with this total
possible causes, defects, prognosis, and suitable prevention. score there are 25 major defect out of total 32 that have been
recorded during assessment of building. Most of the significance

FINDINGS defect came from the missing defect, eventually can be said the
sources is the damage of the water proofing at the flat roof. The
major and significance defect mostly attack the fabric and
component elemental. Recommendation that can be made from
the finding is, the immediate repairing work should be done first
on the significance defect especially defect that happened on the
main structure of the building because this will affect the health
and safety issue of the occupant.

Defects Analysis REFERENCES


• Overall building rating is fair with total score 8.4375 and there are 25 major defects. • Structural Defects in Buildings. (2016). Structural Design of Buildings, 295-306.
• Most of the significance defects came from the missing defects and sources of defects are • Chadwick, J., & Mcjunkin, J. (n.d.). Facade Maintenance: Owners Techniques for Data Management. Building Facade
damage of water proofing at the flat roof. Maintenance, Repair, and Inspection.