Professional Documents
Culture Documents
Capacity
Design Design Class
Item
Class 1 Class 2 Class 3
General Sizing Vessels shall be sized Vessels shall be sized Vessels shall be sized in
Criteria 10% smaller than what according to “typical” accordance with “typical”
“typical” design rules design rules. design rules and round
require. up. This ensures that the
process capacity will be
met.
Hold-Up Time Vessels shall be sized Vessels shall be sized for 5 Vessels shall be sized for
for 3 to 5 minutes of to 7 minutes of liquid “hold- 6 to 15 minutes of liquid
liquid “hold-up”. “Pots” up”. “hold-up”.
may have less hold-up in
all classes
Column Sizing Columns shall be Columns shall be designed Columns shall be
designed for greater for 80 to 90% tray flooding. designed for 70 to 80%
than 90% tray flooding. tray flooding.
Design Pressure Vessels shall be Generally a 10% margin shall be incorporated between
designed maximum operating pressure and design pressure of
(pressure/temperature) the vessels to prevent RV leakage.
to the maximum
operating conditions with
no additional margin to
account for relief valve
(RV) set pressure.
Product Recovery Columns shall be designed for required product Larger, more elaborate
recovery and purity. columns that improve
recovery of components
shall be provided.
Columns shall be able to
meet more stringent
specifications for
products and provide
improved selectivity.
Expandability
Design Design Class
Item
Class 1 Class 2 Class 3
Future Connections No connections for future use shall be provided. Connections shall be
provided for future use in
stress relieved and
internally lined systems.
Future Sizing No vessels shall be sized with excess capacity. Selected major vessels
shall be sized for future
capacity increase.
Vessel Load No considerations shall be provided for future process Vessels and vessel
Conditions or mechanical load conditions. structures shall be
designed for future
process and mechanical
load conditions. Design
shall be clearly
documented.
Studies No studies required. Equipment planning
studies shall be
performed to ensure
sufficient space and
clearances are
maintained for expansion.
Related constructability
issues shall be addressed
during design.
Capacity Utilization
Design Design Class
Item
Class 1 Class 2 Class 3
Condensate Condensate from Condensate from reboilers shall be removed using
Removal reboilers shall be condensate pots and level control systems as required
removed using steam by the DEPs.
traps.
Compressor Suction Separate compressor suction drum shall not be Compressor suction drum
Drum provided. shall be provided
downstream of the
accumulator.
Specifications Manufacturers standard DEP 31.22.20.31-Gen., Shall conform to DEPs.
vessels shall be Annex II shall be
accepted. considered for columns.