CLMB Project

PLAN AND CHECKLIST FOR LIFTING WORK

EQUIPMENT NAME : Scaffolding


AREA : Site office
PROJECT : CLMB Project
DATE OF ERECTION : ______________________

NO DESCRIPTION MAIN CRANE TAILING REMARKS

I. CRANE TYPE AND MODEL Truck Mounted Crane 12T


(Liugong LC120A5)
II. ERECTION LOAD
1 Erection Weight 2.00 TON TON
2 Weight of Shackle/Sling 0.03 TON TON
3 Weight of Hook Block 0.74 TON TON
4 Weight of Lifting Accessories 0.00 TON TON
TOTAL LOAD 2.77 TON 0 TON
III. CRANE DATA'S
1 Crane Capacity 12 TON TON
2 Existing Boom Length 8.26 M M
3 Jib Boom M M
4 Load Line Reeving 3 Lines Lines
5 Hook Block Capacity / SWL 12 TON TON
6 Working Radius 4.46 M M
7 Lifting Capacity 4.5 TON TON
( Lifting Cap. )
SAFETY FACTOR = 1.62 > 1,20 (Ok)
Total Load
IV.
Total Load
CRANE EFFICIENCY = x 100% 62%
Lifting Cap.
V. LIFTING DEVICE
1 Wire/ Webbing Sling Size Webb 6T x 6 m x 2 ea
2 Sling Quantity to be Used 2.00
3 Sling belt Arrangement ( See Attached )
4 Wire/Webbing Sling ( Safe Working Load )
5 Shackle / SWL 8,5 T X 2 ea (1 inch)
6 Spreader Beam / Lifting Beam ( SWL )
7 Chain Block / SWL
VI. GROUND CONDITION LEVEL / MATE PLATE If Needed
VII. METHODE OF COMUNICATION TO BE USED Hand Signal

Prepared Checked Approved