You are on page 1of 4

SPP POWER PLANT PROJECT

TGTK Job No. D-001 Page 20

20-Mar-15 GIS AND CONTROL PANEL IN GIS ROOM Rev.0

LIFTING PLAN FOR CRANE 25 TON


Crane 25 tons
Working Boom Length
Radius 9.5 16.5 23.5
11 m. 5.85 6.40
12m. 4.95 5.50
13 m. 4.20 4.75
Unit : Ton

Weight
Equipment Weight 1 Ton
Hookblock Weight 0.12 Ton
Sling, Wire, etc. Weight 0.32 Ton
Total Weight (A) 1.44 Ton

Lifting Condition
Maximum Load on Crane 4.95 Ton
Working Radius (B) 12 Meter
Boom Length © 16.5 Meter
Maximum Load From Chart 4.95 Ton

Lifting Capacity Rate = (Total(A)x100)/Maximum Load From Chart


= 29.09 %
Safety factor = 3.44

Description for Crane 25 tons


1. Crane chart 25 tons
SPP POWER PLANT PROJECT
TGTK Job No. D-001 Page 21

20-Mar-15 GIS AND CONTROL PANEL IN GIS ROOM Rev.0

2. Crane lifting height graph 25 tons

9.3 Crane Dimension 25 tons


SPP POWER PLANT PROJECT
TGTK Job No. D-001 Page 27

MV/LV SWITCHGEAR, MCC


13-Feb-15 Rev.1
AND OTHER ELECTRICAL PANEL IN CEB
LIFTING PLAN FOR HIAB
HIAB
Working Boom Length
Radius 8.53 10.93 13.33
7 m. 1.30 1.10 0.70
8m. 1.05 0.95 0.60
9 m. 0.85 0.55
Unit : Ton

Weight
Equipment Weight 0.4 Ton
Hookblock Weight 0.1 Ton
Sling, Wire, etc. Weight 0.05 Ton
Total Weight (A) 0.55 Ton

Lifting Condition
Maximum Load on Crane 0.95 Ton
Working Radius (B) 8 Meter
Boom Length © 10.93 Meter
Maximum Load From Chart 0.95 Ton

Lifting Capacity Rate = (Total(A)x100)/Maximum Load From Chart


= 57.89 %
Safety factor = 1.73

Description for Hiab


1. Hiab chart 5 tons
SPP POWER PLANT PROJECT
TGTK Job No. D-001 Page 28

MV/LV SWITCHGEAR, MCC


13-Feb-15 Rev.1
AND OTHER ELECTRICAL PANEL IN CEB

2. Crane lifting height graph 5 tons

9.3 Hiab Dimension 5 tons