MOBILE CRANE LIFT PLANNING SHEET
7.1 Underground Hazards 7.2 Ground level Hazards 7.3 Above ground Hazards
Utilities – Gas, Water etc Members of the public Electrical cables
Storm Drain Workers Telephone cables
Sewer Vehicles/machinery Lampposts
Recent excavations Buildings Other cranes
Other - describe Ground conditions Trees
Other - describe Conflicting tasks in area
Other - describe
Access road: Concrete/Bitumen/Gravel/soft/Other Asphalt road
Crane Set-Up Area: Concrete/Bitumen/Gravel/Soft/Slope /Other
The lifting activity requires the following to be considered, note this list is not exhaustive
Cultural, communication and language difficulties Environmental conditions including weather and
permissible limits
Weight, size, shape and centre of gravity of load Illumination in the pick-up and lay-down areas
Availability of approved lifting points on load Proximity of hazards, obstructions in the path of load
Method of slinging/attaching/detaching the load Contingency plan in case the task changes
Overturning/load integrity/need for tag lines Access and emergency escape routes
Initial and final load positions and how it will get there Experience, competence and training of personnel
Lifting over live plant/equipment Number of personnel required for task
Number and duration of lift(s) Pre-Use Inspection of equipment by Operator
PTW, Tool Box Talk, including Safety and Stopping
the job
8. APPROVALS
Required lift Approvals Name Signature Date
Lift plan prepared by Abdul samad 17.9.21
Lift plan reviewed by Khalid SPL CSL / 17.9.21
abdul jabbar PIC
Lift Plan approved by