You are on page 1of 3

Page 1 of 3

Technology Transfer Checklist for Sending Plant

Project Identification No.

Name of Product:

Technology Sending Coordinator:

Technology Receiving Coordinator


(Proposed site)

Sr Activity / Documents * Responsible # Probable Target Sent Sent


. person date on by

1 Product Developmental report Coordinator      

2 Master Manufacturing Coordinator


Record / Batch manufacturing
record (Executed)      

3 Master Packing Record / Batch Coordinator


packing record (Executed).      

4 Tooling Specification Coordinator      

5 Process Validation Protocol & Coordinator


Report      

6 Product Cleaning Method – Coordinator


Protocol & report      

7 Specification, STP & MSDS of Coordinator


Active Material(s)      

8 Specification, STP & MSDS of Coordinator


Inactive Material(s)      

9 Specification, STP & MSDS of Coordinator


Packaging Material(s)      

10 Specification, STP of In- Coordinator


process product(s)

11 Specification, STP & MSDS of Coordinator


Finished product (s)      

12 Analytical method validation Coordinator


Protocol & Reports (Finished
product) (as applicable)      
Page 2 of 3
Technology Transfer Checklist for Sending Plant

Sr Activity / Documents * Responsible # Probable Target Sent Sent


. person date on by

Assay,

Related substance,

Content Uniformity,

Dissolution profile,

OVI, Residual Solvents

Stability indicating Method.

13 Analytical method validation


Protocol & Reports/ Method
transfer protocol of Critical
API for (as applicable) Coordinator

Assay,

Related substance,

OVI, Residual Solvents

14 Trend data for last 10 batches


of Coordinator

API bulk density

API Particle size.

API Solubility profile.

Excipient’s bulk density

Excipient’s Particle size.

Finished product trend


analysis data

15 Finished Product Samples (3 Coordinator


batches)      

16 Product Stability Data Coordinator      

17 Annual Product Review Coordinator      

18 Approved Vendor List Coordinator      


Page 3 of 3
Technology Transfer Checklist for Sending Plant

Sr Activity / Documents * Responsible # Probable Target Sent Sent


. person date on by

19 Audit Report of vendors Coordinator


(Manufacturer)      

20 Product History (Critical Coordinator


product problems)      

21 Complaint History and Coordinator


Investigation report      

22 Change control / History of Coordinator


product.      

23 Technical Agreement Coordinator

24 Access letters / Marketing Coordinator


authorization

25 Dossiers transfer letters. Coordinator

26 Country’s FDA approval letter Coordinator

You might also like