Exercise 2

21.1 Criteria, sub-criteria, and point system for the evaluation of the Full
Technical Proposals:
(for FTP)
Points
(i) Specific experience of the Contractor (as a firm) relevant to the Assignment
in the last five years: [10Point]
ii) Adequacy and quality of the proposed methodology, and work plan in
responding to the Terms of Reference (TORs): [30 Point]

1. Approach and Methodology 10 Point


2. Work Plan 5 Point
3. Organization and Staffing 5 Point
4. Machinery 10Point

(iii) Key Experts’ qualifications and competence for the Assignment:60


a)Position: Project Manager–25Point.
b)Position: Site Engineer- 20Point.
c)Position: Accountant – 15 Point.
Total points for criterion (iii):[60 Point]

The number of points to be assigned to each of the above positions shall be


determined considering the following three sub-criteria and relevant
percentage weights:
1) General Qualifications (General Education, Training, and Experience): [30
%]
2) Adequacy for the Assignment (Relevant Education, Training, Experience in
the sector/similar assignments): [60%]
3) Relevant experience in the region (working level fluency in local
language(s)/knowledge of local culture or administrative system,
government organization, etc.): [ 10 %]
Total weight: 100%

Total Points for the Three Criteria: 100

The minimum technical score (St) required to pass is:75%

No. Position Min Yrs. of Minimum Education and Minimum experience


Information Certifications
Systems
experience

1. Project Manager 10 Master’s degree in Civil He/she must have worked in that
Engineering or related field position or similar position in at
least in five (5) projects of similar
nature and complexity

2. Site supervisor 10 Civil Engineering degree or He/she must have worked in that
related field position or similar position in at
least in four (4) projects of similar
nature and complexity

3. Accountant 6 Accounting degree or He/she must have worked in that


related field position or similar position in at
least in four (4) projects of similar
nature and complexity

The firm required to fulfill three manpower: Project Manager, Site Engineer and Accountant and the
weight for the each position is 25, 20 and 15 respectively.

The number of points to be assigned to each of the above positions or disciplines shall be
determined considering the following three sub-criteria and relevant percentage weights:

(a) General qualifications 20-30%

(b) Adequacy for the assignment 50-60%

(c) Experience in region and language 10-20%

Total weight: 100%

By setting a criteria evaluate the technical proposal of different firms.