LIST OF MINIMUM MAJOR TOOL AND TACKLES REQUIRED PER BOILER

For Boiler, Bunker & ESP.

1. Power Winches 10 ton Cap(with wire rope) - 2 Nos.


2. Welding Generators - 5 Nos.
3. Welding Rectifiers - 7 Nos.
4. Welding Transformers - 20 Nos.
5. Chain Pulley Block 10 ton cap - 3 Nos.
6. Chain Pulley Block 5 ton cap - 3 Nos.
7. Chain Pulley Block 2/3 ton cap - 8 Nos.
8. Wire rope pulleys (4/5 way) - 5 Nos.
9. Wire rope pulleys (3 way) - 10 Nos.
10. Wire rope pulleys (2/single) - 8 Nos each.
11. Manila rope pulleys (3/2/single) - 10 Nos each.
12. TIG welding set - 8 Nos.
13. Welding cables (100 meters long) - 20 bundles.
14. Cutting set.(torch/hose/oxy/LPG) - 20 sets.
15. Manila rope bundles - 15 Nos.
16. Dial gauge with magnetic base - 2 Nos.
17. Master level (12”/6”) - 1 No each.
18. Spanner set (6-7 to 41-47) - 5 sets.
19. Pipe wrench (4”/6”/12”/24”) - 2 Nos each.
20. Vernier Caliper (6”/12”) - 2 Nos each.
21. Hammer (of various Lbs) - 2 Nos each.
22. Manual winch 10 ton cap - 2 Nos.
23. Other hand tools - Sufficient nos.
24. Baking oven (0-300 deg C) - 2 Nos.
25 Baking oven (0-200 deg C) - 2 Nos.
26. Heating coils with panel - 2 sets.
27. Motorised hydraulic test pump with gauge - 1 No. (cap upto 250 Kg/cm2)
28. Packing brass shims of all sizes upto 1 mm - Sufficient qty.
29. Angle grinder GQ4, AG7, AG5 - 4 Nos each.
30. Buffing wheel - Sufficient Nos.
31. Surface grinder - 2 Nos.
32. Mech/Hyd. Jack (50 T cap0 - 2 Nos.
33. Thermal chalk - Sufficient Nos.
34. DP test Kit (fresh) - 2 Kits.
35. Hydra crane - 1 No.
36. Carry oven - 2 Nos.
37. Dee shackles of various cap - 10 each.
38. Wire rope slings of various sizes - sufficient nos.
39. Wire rope bundles 7/8”, 5/8” - Sufficient nos.
40. Wire rope clamps all sizes - Sufficient nos.

The above mentioned tools are specific requirement apart from Heavy duty
Lifting crane & Hydra during mobilization. If found short during peak period
of erection additional tool should be arranged by the contractor.