2021 - 10 - 21 Mitigation Plan - Rev005
2021 - 10 - 21 Mitigation Plan - Rev005
SWR_03/04
(20/12-25/12)
SWR-04
(11/11-02/12)
SWR_03
(13/11-30/11)
Main Concern SIMOP Constructbility (SWR-04)
Stell Str.
Option 1
Option 2
Option 2
SWR-04
Section A
Pump Fnd Piperack
Eq Fnd Pump Fnd
Note SWR-04
Schedule
1. Shelter Dimension L x W x H = 65 x 24 x 17 m
- Nop 2021
2. Main Stell structure erection access should be decided : OC-04 Piling Work
- From Outside Main Building (Option 1) - Des 2021
( - ) Piperack, Pump Fnd by Rekind can’t be continued and should be hold until OC-04 Piling Work + Excavation
main stell structure + Clading erection finish - Jan 2022
( + ) Main equipment can be instal soon OC-04 ….
- Feb 2022
- From Inside Main Building (Option 2) OC-04 ….
( + ) Piperack, Pump Fnd by Rekind can be continued - March 2022
( - ) UF Main equipment installation should waiting until main stell structure + - Apr 2022
- Mey 2022
Clading erection finish
- June 2022
Main Concern SIMOP Constructbility (SWR-05)
Stell Str.
Main Road
Pump Fnd.
piperack Piperack
Eq Fnd Eq Fnd SWR-04
Note SWR-04
1. Shelter Dimension L x W x H = 65 x 45 x 17 m Schedule
2. Main Stell structure erection access using Outside Building : - Nop 2021
- From Outside Main Building (Option 2) OC-04 Piling Work
( + ) Piperack, Pump Fnd by Rekind can be continued - Des 2021
( + ) Main equipment can be instal soon OC-04 ….
( - ) Equipment for main stell structure will be heaviest - Jan 2022
( - ) Pump Foundation should be hold OC-04 ….
- Feb 2022
OC-04 ….
- March 2022
- Apr 2022
- Mey 2022
- June 2022