1

SIG on
Regional Architecture

Ar.M.Arunkumar | Ar.N.Dhinesh | Ar.M.Prasath


AVINASHI FLYOVER / UPPILIPALAYAM FLYOVER 2
It is a roundabout in Coimbatore that connects Northern and eastern parts of the city.
This flyover is one of the most interchanges in coimbatore and it is crucial caring traffic
from each side.
It is the second flyover built in TamilNadu.
It was the first grade separator in India to have a roundabout.
3

Objectives
• To find out more about the
traffic around this roundabout
• To understand the movement
of different types of vehicle
• To find and explore the pros
and cons of the flyover.
5
Segments of the study

04
03 STEP

02 STEP

01 STEP
STEP
Finalising the Approval Collection of Feedback
project from the data
concerned
Collection of data

● In this, we will be collecting an approximate number of vehicle using the flyover, and the
traffic analysis will be done by our team using the collected data.
● Then this data will be shared with an eminent architect in Coimbatore for his/her
feedback.
● After this stage, we will have a bigger picture about the roundabout.
● Then we will proceed with asking the public about this roundabout. A basic questionnaire
will be generated after discussing with the architect.
● The work / survey includes, finding number of vehicles in a specific time, routes
most of the vehicles uses at that time, etc.
● The major objective is to find the pros and cons of this roundabout.
● The intention is to find beneficials or flaws in the design in the roundabout.
● After discussing with the Architect(s), we will be preparing a questionnaire with
basic questions and get the feedback from public.
We have collected a list of Coimbatore district officials with whom we have planned
to ask for permission to proceed for the project.

City Engineer : A.Lakshmanan 9443799211


Exec.Engineer [north] : V.Parvathi 0422-2393524
Exec.Engineer [planning] : R.Sasipriya 9489206018
Mun.Commissioner : Rajagopal 0422-2302323
6
Stages

Approval from the


Sharing of knowledge
stakeholders

01
Finding the study
02 03
Understanding the
04
element for the building / space
segment 

This process will deal This is to acquire This stage will be done This stage will develop the
with the selection of the acceptance with the help of data study by discussing with the
building / space to of the owner / from the selected architecture experts /
conduct the study / authority to space through public.Initial discussion will
research. A list of proceed the drawings, photographs, happen only between the
buildings will be taken study. audio recordings from group members, Initially
for a pilot study and a the people enquired, pogrom various sectors of
relevant one will be etc… This will help the people.
chosen to conduct SIG members to explore
the detailed study. the space.
7
Timeline

July Aug Sep Oct Nov Dec


Finding the project Approval from the Data collection and Reviews from the Reviews from Final presentation
concerned authorities Documantations people around the the Architects of the study.
building