I. MASONRY WORKS
CONC. BLOCKS 6”- M^2 (PHP. 650/M^2)
CONC. BLOCKS 4”- M^2 (PHP. 650/M^2)
PLASTERING-M^2 (PHP. 3500/M^3)
BASE BOARD
G/F = 20.79 L m X PHP. 500 = PHP. 10.395
2ND FLR = 33.75 L m X PHP.500 = PHP. 16, 876
ACTIVITY #2
II. BACKFILLING
NO. OF WORKERS X PHP. 300/ DAY
9 LABORS X PHP. 300= PHP.2700 X 3 DAYS = PHP. 8,100
III. COLUMNS
BAR DIA. UNIT WT LENGTH TOTAL WT PRICE/ TOTAL
(mm) (Kg.m) (m) (Kg.) KILO AMOUNT
10 0.617 115.2 71.0784 75.39 5,358.60
12 0.888 383.62 340.65 118.69 40,431.87
16 1.578 681.696 1,075.71 193.15 207,774.60
IV. BEAMS
V= L X W X H
V= 7 X 7 X 0.30
V= 14.7 M^3
A= L X H
A= 7.00M X 7.00M = 49 M^2
TIE WIRE
LABOR
ENGR. @550
FOREMAN @500
LABORER @1200
=PHP. 14,914
CLASS A MIXTURE
UNIT COST
QUANTITY PRICE AMOUNT
27 pcs. @320 8, 640
13 pcs. @320 4,160
4 kg @70 280
PHP. 13,080
ACTIVITY #
MATERIAL COST:
12.5 pcs = 6”
LABOR COST:
5 DAYS = DURATION
-WALL (FRONT)
12.5 = 6”
12.5 = 6”
12.5 pcs = 6”
CUT BARS
0.20 + 1.40 = 1.60 x 10 x 4 = 64 = 10.66 = 11 pcs
6
TEMP. BARS
7.00 X .10 = 0.70
3.00 X .10 = 0.30
4.00 X .10 = 0.40
4.10 X .10 = 0.41
3.10 X .10 = 0.31
0.90 X .10 = 0.09
2.21/6 = 36.83 = 37 pcs x 2 = 74 pcs
+ 11 pcs
85 pcs
QUIZ #1
II. GYPSUM PLASTER BOARD
MATERIAL COST:
QUIZ #1
I. DOORS
LABOR COST
3 DAYS X 3 PERSONS
PHP. 300-450/DAY
ACTIVITY NO. 6
I. ELECTRICAL
ACCESSORIES
-Single Gang Wall Switch – PHP. 64.00 (4 pcs) = 256.00
-Two Gang Wall Switch – PHP. 99.00 (2pcs) = 198.00
-Three Gang Wall Switch – PHP. 144.00 (3pcs)= 432.00
-Duplex Convenience Outlet – PHP. 94.75 (12pcs) = 1,137.00
PHP. 2,023.00
LIGHTING FIXTURES
-Chandelier PHP. 4,000.00 (1pc) = 4,000.00
-Surface Mounted Downlight PHP. 395.00 (12PCS)= 4,740.00
-Wall Mounted Downlight PHP. 500.00 (6PCS) = 3,000.00
PHP. 11,740.00
MATERIAL COST
(PHP. 19,763) (35%) = PHP. 6,917.05 + PHP. 6,400.00
= PHP. 13,317.05
BUILDING TECH 4
_____________________________________________________________________________________