EAST FLOODWAY AND DOLOK-PENGGARON RIVER SYSTEM UNDER INTEGRATED WATER RESOURCES AND FLOOD MANAGEMENT PROJECT FOR SEMARANG (JICA LOAN IP-534)
MASTER PLAN AND FEASIBILITY STUDY REPORT
ON FLOOD CONTROL
FINAL REPORT
VOLUME I MAIN REPORT
JUNE 2016
CTI Engineering International Co., Ltd
In Association With NIPPON KOEI Co., Ltd, PT. INDRA KARYA (Persero), PT. METTANA Engineering Consultant, PT. MULTIMERA HARAPAN, PT. TRI TUNGGAL PRATYAKSA, PT. TATA GUNA PATRIA