You are on page 1of 19

MAIN REPORT

TABLE OF CONTENTS

Page
SUMMARY

CHAPTER 1 INTRODUCTION...............................................................................................................1-1
1.1 Background...................................................................................................................................1-1
1.2 Objectives of the Study..................................................................................................................1-2
1.3 Study Area.....................................................................................................................................1-2
1.4 Scope of the Works of the Study on Flood Control Plan...............................................................1-3
CHAPTER 2. TOPOGRAPHY AND RIVER SYSTEMS.........................................................................2-1
2.1 Topographic Characteristics..........................................................................................................2-1
2.2 River Systems................................................................................................................................2-2
2.2.1 River Length and Catchment Area................................................................................................2-2
2.2.2 Penggaron River System...............................................................................................................2-2
2.2.3 Dolok River System......................................................................................................................2-7
CHAPTER 3. HYDROLOGY AND HYDRAULICS STUDY..................................................................3-1
3.1 Meteo-hydrological Observation Systems.....................................................................................3-1
3.2 Hydrological Data Collection........................................................................................................3-2
3.2.1 Maintenance Situation of Rainfall Data.........................................................................................3-2
3.2.2 Water level and Discharge.............................................................................................................3-4
3.2.3 Tide...............................................................................................................................................3-5
3.2.4 River Cross Sectional Survey........................................................................................................3-6
3.3 Probable Rainfall and Discharge...................................................................................................3-7
3.3.1 Actual Record of Rainfall Duration...............................................................................................3-7
3.3.2 Set Up of Design Rainfall Duration...............................................................................................3-8
3.3.3 Set Up of Basin Mean Rainfall......................................................................................................3-8
3.3.4 Maximum Basin Mean Rainfall and Probable Rainfall.................................................................3-8
3.3.5 Probable Peak Discharge.............................................................................................................3-14
3.4 Present Flow Capacities...............................................................................................................3-15
CHAPTER 4. SOCIO ECONOMY............................................................................................................4-1
4.1 Population......................................................................................................................................4-1
4.1.1 Amount and Population Growth....................................................................................................4-1
4.1.2 Distribution and Density of Population.........................................................................................4-4

i
4.1.3 Population by Livelihood..............................................................................................................4-4
4.2 Land Use.......................................................................................................................................4-6
4.2.1 Spatial Plan....................................................................................................................................4-6
4.2.2 Comparison of Land Use in 2010 and 2014...................................................................................4-6
4.3 Economic Activities......................................................................................................................4-8
4.3.1 Production.....................................................................................................................................4-8
4.3.2 Trading..........................................................................................................................................4-9
4.4 Economic Indicators....................................................................................................................4-10
4.4.1 Gross Regional Domestic Product (GRDP).................................................................................4-10
4.4.2 Inflation.......................................................................................................................................4-17
CHAPTER 5. FLOOD SURVEY...............................................................................................................5-1
5.1 Questionnaire Survey on Floods....................................................................................................5-1
5.2 Flood Survey points.......................................................................................................................5-2
5.3 Historical Floods...........................................................................................................................5-2
5.3.1 Occurrence Month-Year of the Historical Flood...........................................................................5-2
5.3.2 Combined Historical Floods..........................................................................................................5-4
5.3.3 January 2014 Flood.......................................................................................................................5-9
5.3.4 Annual Floods...............................................................................................................................5-9
CHAPTER 6. FLOOD SIMULATION MODEL.......................................................................................6-1
6.1 Model Structure.............................................................................................................................6-1
6.2 Runoff Analysis.............................................................................................................................6-2
6.2.1 Structure of Runoff Model.............................................................................................................6-2
6.2.2 Runoff Model................................................................................................................................6-3
6.2.3 Result of Runoff Analysis.............................................................................................................6-5
6.3 Hydrodynamic Model (MIKE 11 HD Module).............................................................................6-8
6.4 Inundation Analysis.....................................................................................................................6-11
6.4.1 Structure of Inundation Analysis Model......................................................................................6-11
6.4.2 Model Parameters........................................................................................................................6-11
6.5 Flood Simulation for the Present Conditions...............................................................................6-13
CHAPTER 7. REVIEW OF THE EXISTING FLOOD CONTROL PLANS............................................7-1
7.1 Previous Flood Control Studies and Plans.....................................................................................7-1
7.2 Dolok Penggaron Drainage Design, Feasibility Study, DHV, October 1992.................................7-1
7.3 JICA Master Plan and Feasibility Study in 1993...........................................................................7-2
7.4 Semarang Flood Control Project, Consolidated Preparation Study, under IBRD Loan,
November 1999 by SMEC and Associated Indonesian Consultants..............................................7-4
7.5 Detail Desain Sistem Sungai Dolok Penggaron (Kanal Banjir Timur – Dombo Sayung), PT.
Jasapatria Gunatama, November 2009...........................................................................................7-5

ii
CHAPTER 8. PROBLEMS AND ISSUES AND DIRECTION OF FLOOD CONTROL.........................8-1
8.1 Problems and Issues......................................................................................................................8-1
8.2 Direction of Flood Control............................................................................................................8-3
CHAPTER 9. FLOOD CONTROL PLANS..............................................................................................9-1
9.1 Basic Concepts for Formulating Flood Control Plans....................................................................9-1
9.2 Conditions of Setting Design Discharge........................................................................................9-1
9.3 Alternatives of Flood Control Plans..............................................................................................9-2
9.3.1 Alternatives of the Penggaron River System.................................................................................9-2
9.3.2 Alternatives of the Dolok River System (Dolok River).................................................................9-4
9.4 Design Discharge of the Alternatives............................................................................................9-7
9.4.1 Design Discharge of the Alternatives of Penggaron River System................................................9-8
9.4.2 Design Discharge of the Alternatives of the Dolok River............................................................9-11
9.5 Hydrological and Hydraulic Study on the Alternative Flood Control Plans................................9-13
9.5.1 Penggaron RS_Alternative-1.......................................................................................................9-13
9.5.2 Penggaron RS_Alternative-2.......................................................................................................9-15
9.5.3 Dolok RS_Alternative-1..............................................................................................................9-21
9.5.4 Dolok RS_Alternative-2..............................................................................................................9-22
9.5.5 Set of Dolok Dam Outflow..........................................................................................................9-23
9.5.6 Dolok RS_Alternative-3 (With Dolok Dam)...............................................................................9-25
9.5.7 Dolok RS_Alternative-4 (With Dolok Dam)...............................................................................9-26
9.6 Design Profile and Design Cross Sections of the Alternative Flood Control Plans.....................9-27
9.6.1 Concepts for Setting Design Bed Profile and Design Cross Sections..........................................9-27
9.6.2 KBT: Design Profile and Typical Design Cross Sections............................................................9-28
9.6.3 Babon River: Design Profile and Typical Design Cross Sections................................................9-31
9.6.4 Dombo-Sayung River: Design Profile and Typical Design Cross Sections.................................9-31
9.6.5 Dolok River: Design Profile and Typical Design Cross Sections................................................9-34
9.7 Reconstruction of Bridges (etc.)..................................................................................................9-40
9.7.1 Existing River Crossing Structures..............................................................................................9-40
9.7.2 River Crossing Structures for Reconstruction..............................................................................9-41
9.8 Relocation OF HOUSES.............................................................................................................9-50
9.8.1 KBT: Relocation of Houses.........................................................................................................9-50
9.8.2 Babon River and the Dombo-Sayung River: Relocation of Houses.............................................9-51
9.8.3 Dolok River: Relocation of Houses.............................................................................................9-53
9.9 Land Acquisition.........................................................................................................................9-55
9.9.1 KBT: Land Acquisition...............................................................................................................9-55
9.9.2 Babon River and the Dombo-Sayung River: Land Acquisition...................................................9-56
9.9.3 Dolok River: Land Acquisition....................................................................................................9-57

iii
9.10 Consideration of Climate Change and Land Subsidence.............................................................9-59
9.11 Conceptual Plan of Drainage Improvement.................................................................................9-60
9.11.1 Drainage Systems and Drainage Problems..................................................................................9-60
9.11.2 Condition and Mechanism of Inland Floods................................................................................9-62
9.11.3 Conceptual Plan of Drainage Improvement.................................................................................9-64
CHAPTER 10. PRELIMINARY DESIGN OF THE KBT (FEASIBILITY STUDY LEVEL) AND
TYPICAL DESIGN OF THE BABON, DOMBO-SAYUNG AND DOLOK
RIVERS (MASTER PLAN LEVEL)...........................................................................10-1
10.1 Preliminary Design of the KBT...................................................................................................10-1
10.1.1 Design of Longitudinal Profile and Cross Sections.....................................................................10-1
10.1.2 Reconstruction of Bridges...........................................................................................................10-7
10.1.3 River Amenity Plan for the KBT Downstream Reach...............................................................10-12
10.2 Typical Design of the Babon River............................................................................................10-14
10.2.1 Design Longitudinal Profile and Typical Design Cross Sections...............................................10-14
10.3 Typical Design of the Dombo-Sayung River.............................................................................10-20
10.3.1 Design of Longitudinal Profile and Typical Cross Section........................................................10-20
10.4 Typical Design of the Dolok River including Bypass Floodway...............................................10-27
10.4.1 Design Longitudinal Profile and Typical Cross Sections...........................................................10-27
CHAPTER 11. COST ESTIMATION..................................................................................................11-1
11.1 Source of Data
11.2 Terms and Definitions..................................................................................................................11-1
11.3 Composition of Cost Items...........................................................................................................11-2
11.4 Scope of Work..............................................................................................................................11-3
11.5 Kanal Banjir Timur (KBT)...........................................................................................................11-3
11.6 Babon River................................................................................................................................11-13
11.6.1 Cost Estimation of the Babon River Alternative 1 (Alt-1)..........................................................11-13
11.6.2 Cost Estimation of the Babon River Alternative 2 (Alt-2)..........................................................11-15
11.7 Dombo-Sayung...........................................................................................................................11-17
11.7.1 Cost Estimation of the Dombo Sayung River Alternative 1 (Alt-1)............................................11-17
11.7.2 Cost Estimation of the Dombo Sayung River Alternative 2 (Alt-2)............................................11-20
11.8 Dolok River................................................................................................................................11-24
11.8.1 Dolok River Alternative 1 (Alt-1)...............................................................................................11-24
11.8.2 Dolok River Alternative 2 (Alt-2)...............................................................................................11-27
11.8.3 Dolok River Alternative 3 (Alt-3)...............................................................................................11-30
11.8.4 Dolok River Alternative 4 (Alt-4)...............................................................................................11-33
CHAPTER 12. ECONOMIC EVALUATION......................................................................................12-1
12.1 Flood Control Plan........................................................................................................................12-1
12.2 Basic Condition............................................................................................................................12-1

iv
12.3 Classification of Flood Damage....................................................................................................12-1
12.4 Flood Area and Damage Rate by Inundation Depth....................................................................12-14
12.5 Calculated Flood Damage...........................................................................................................12-16
12.6 Estimation of Annual Average Benefit.......................................................................................12-17
12.7 Methods of Economic Analysis..................................................................................................12-19
12.7.1 Parameter....................................................................................................................................12-19
12.7.2 Interest Rate................................................................................................................................12-20
12.7.3 Conversion Factor.......................................................................................................................12-20
12.7.4 Economic Project Cost...............................................................................................................12-21
12.8 Economic Evaluation on Flood Control Master Plan..................................................................12-30
12.8.1 Annual Cost and Benefit Flow....................................................................................................12-30
12.8.2 Economic Evaluation on the Flood Control Master Plan............................................................12-42
12.8.3 Sensitivity Analysis....................................................................................................................12-47
12.8.4 Project Justification....................................................................................................................12-47
12.9 Feasibility Study on East Floodway/KBT...................................................................................12-52
12.9.1 Flood Control Plan......................................................................................................................12-52
12.9.2 Basic Condition..........................................................................................................................12-52
12.9.3 Annual Average Benefit.............................................................................................................12-52
12.9.4 Calculated Flood Damage...........................................................................................................12-52
12.9.5 Estimation of Annual Average Benefit.......................................................................................12-52
12.9.6 Economic Project Cost...............................................................................................................12-52
12.9.7 Evaluation of the Flood Control Project.....................................................................................12-52
12.9.8 Sensitivity Analysis....................................................................................................................12-53
12.9.9 Project Justification....................................................................................................................12-53
CHAPTER 13. PROPOSED MASTER PLAN AND PRIORITY PROJECTS.....................................13-1
13.1 Basic Concepts for Flood Control.................................................................................................13-1
13.2 Conditions of Setting Design Discharge.......................................................................................13-1
13.3 Alternatives of the Flood Control Plans........................................................................................13-2
13.4 Proposed Master Plan for Flood Control......................................................................................13-8
13.5 Priority Project............................................................................................................................13-11
13.6 Implementation Program of the River Improvements.................................................................13-12
CHAPTER 14. CONCLUSION AND RECOMMENDATION............................................................14-1
14.1 Conclusion and Recommendation................................................................................................14-1
14.2 Issues to be Discussed for Implementing the River Improvements...............................................14-3

v
LIST OF TABLES

TABLE 2.2.1 RIVER LENGTH AND CATCHMENT AREA OF THE PENGGARON AND
DOLOK RIVER SYSTEMS..........................................................................................2-2

TABLE 3.1.1 LIST OF THE ORGANIZATIONS AND OBSERVATION ITEMS............................3-1


TABLE 3.2.1 AVAILABILITY OF THE OBSERVED RAINFALL DATA.......................................3-3
TABLE 3.2.2 AVAILABILITY OF THE OBSERVED WATER LEVEL AND DISCHARGE..........3-5
TABLE 3.2.3 SEA LEVEL AT SEMARANG HARBOR....................................................................3-5
TABLE 3.2.4 LIST OF THE RIVER CROSS SECTIONAL SURVEY...............................................3-6
TABLE 3.3.1 HOURLY DISTRIBUTION PATTERN AT SEMARANG STATION (BMKG).........3-7
TABLE 3.3.2 ANNUAL MAXIMUM BASIN MEAN RAINFALL....................................................3-8
TABLE 3.3.3 PROBABILITY DISTRIBUTION MODEL................................................................3-10
TABLE 3.3.4 PROBABLE RAINFALL............................................................................................3-10
TABLE 3.3.5 BASIN MEAN DAILY RAINFALL...........................................................................3-11
TABLE 3.3.6 BASIN AND SUB-BASIN MEAN DAILY RAINFALL............................................3-11
TABLE 3.3.7 HOURLY DISTRIBUTION RATIO OF THE DESIGN STORM...............................3-12
TABLE 3.3.8 PROBABLE PEAK DISCHARGE..............................................................................3-14
TABLE 3.3.9 PENGGARON RIVER DISCHARGE.........................................................................3-14
TABLE 3.4.1 CALCULATION CONDITION FOR FLOW CAPACITY.........................................3-15

TABLE 4.1.1 POPULATION OF SEMARANG CITY (2010-2014)...................................................4-2


TABLE 4.1.2 POPULATION OF DEMAK DISTRICT (2010-2014)..................................................4-2
TABLE 4.1.3 ESTIMATED POPULATION IN THE STUDY AREA (2010-2014)...........................4-3
TABLE 4.1.4 POPULATION PROJECTION OF SEMARANG CITY & DEMAK DISTRICT
(2015-2064)....................................................................................................................4-3
TABLE 4.1.5 POPULATION DENSITY IN THE STUDY AREA (2014)..........................................4-4
TABLE 4.1.6 POPULATION BY LIVELIHOOD (PEOPLE) OF SEMARANG CITY IN 2014........4-5
TABLE 4.2.1 LAND USE OF SEMARANG CITY (2010 AND 2014) (ha)........................................4-7
TABLE 4.2.2 LAND USE OF DEMAK DISTRICT (2010 AND 2014) (ha).......................................4-7
TABLE 4.3.1 PRODUCTION OF FOODSTUFFS IN SEMARANG CITY PER TON (2009-2014)
.......................................................................................................................................4-8
TABLE 4.3.2 PRODUCTION OF FOODSTUFFS IN DEMAK DISTRICT PER TON (2009-2014)
.......................................................................................................................................4-8
TABLE 4.3.3 REALIZATION OF EXPORT VALUE OF NON-OIL AND GAS SECTOR IN
THE CITY OF SEMARANG (2012-2014) (1000US$).................................................4-9
TABLE 4.3.4 REALIZATION OF EXPORT VALUE OF NON-OIL AND GAS SECTOR IN
DEMAK (2014)............................................................................................................4-10

6
TABLE 4.4.1 GROSS REGIONAL DOMESTIC PRODUCT CURRENT PRICE (RP.) IN
SEMARANG (2010-2014)...........................................................................................4-12
TABLE 4.4.2 GROSS REGIONAL DOMESTIC PRODUCT CONSTANT PRICE (RP.) IN
SEMARANG (2010-2014)...........................................................................................4-13
TABLE 4.4.3 GROSS REGIONAL DOMESTIC PRODUCT PER CAPITA BASED ON
CURRENT PRICE (RP.) IN SEMARANG (2010-2014).............................................4-14
TABLE 4.4.4 GROSS REGIONAL DOMESTIC PRODUCT BASED ON CURRENT PRICE
(RP.) IN DEMAK (2010-2014)....................................................................................4-15
TABLE 4.4.5 GROSS REGIONAL DOMESTIC PRODUCT BASED ON CONSTANT PRICE
(RP.) IN DEMAK (2010-2014)....................................................................................4-16
TABLE 4.4.6 INFLATION OF CENTRAL JAVA AND SIX CITIES IN CENTRAL JAVA...........4-17
TABLE 4.4.7 INFLATION PER GROUP (2014) (Percent)...............................................................4-17

TABLE 5.1.1 QUESTIONNAIRE ITEMS OF THE FLOOD SURVEY..............................................5-1

TABLE 6.2.1 CATCHMENT AREA OF THE DOLOK-PENGGARON RIVER SYSTEM...............6-3


TABLE 6.2.2 SCS CURVE NUMBER IN DOLOK-PENGGARON RIVER SYSTEM......................6-4
TABLE 6.2.3 FLOOD PROPAGATION SPEED.................................................................................6-5
TABLE 6.3.1 OUTLINE OF HYDRODYNAMIC MODEL................................................................6-8
TABLE 6.3.2 RIVER FACILITIES IN RIVER ROUTINE MODEL...................................................6-9
TABLE 6.4.1 OUTLINE OF THE INUNDATION ANALYSIS MODEL.........................................6-11
TABLE 6.4.2 THE STANDARD VALUES OF ROUGHNESS COEFFICIENT..............................6-12

TABLE 9.5.1 SPECIFICATION OF SATELLITE ELEVATION DATA..........................................9-16


TABLE 9.5.2 OUTFLOW OF DOLOK DAM (50 YEAR)................................................................9-24
TABLE 9.6.1 COMPARISON OF THE COSTS OF THE OPTIONS OF THE CONTROL WEIR
FOR THE BYPASS FLOODWAY OF THE DOLOK RIVER....................................9-38
TABLE 9.7.1 NUMBER OF THE RIVER CROSSING STRUCTURES AND RELATED
STRUCTURES............................................................................................................9-40
TABLE 9.7.2 KBT: NUMBER OF RIVER CROSSING STRUCTURES FOR
RECONSTRUCTION..................................................................................................9-41
TABLE 9.7.3 BABON RIVER AND DOMBO-SAYUNG RIVER: NUMBER OF RIVER
CROSSING STRUCTURES FOR RECONSTRUCTION...........................................9-44
TABLE 9.7.4 DOLOK RIVER: NUMBER OF RIVER CROSSING STRUCTURES FOR
RECONSTRUCTION OR NEW CONSTRUCTION..................................................9-44
TABLE 9.7.5 KBT: BRIDGES FOR RECONSTRUCTION..............................................................9-45
TABLE 9.7.6 BABON RIVER: BRIDGES FOR RECONSTRUCTION...........................................9-46
TABLE 9.7.7 DOMBO-SAYUNG RIVER: BRIDGES FOR RECONSTRUCTION........................9-47
TABLE 9.7.8 DOLOK RIVER: BRIDGES FOR RECONSTRUCTION...........................................9-48
TABLE 9.7.9 DOLOK RIVER WITH BYPASS FLOODWAY: BRIDGES FOR
RECONSTRUCTION AND NEW CONSTRUCTION...............................................9-49

7
TABLE 9.8.1 KBT DOWNSTREAM REACH: NUMBER OF HOUSES TO BE RELOCATED........9-
50
TABLE 9.8.2 KBT MID-STREAM TO UPSTREAM REACH: ROUGH ESTIMATION OF THE
NUMBER OF HOUSES TO BE RELOCATED..........................................................9-51
TABLE 9.8.3 BABON RIVER: ROUGH ESTIMATION OF NUMBER OF HOUSES FOR
RELOCATION............................................................................................................9-51
TABLE 9.8.4 DOMBO-SAYUNG RIVER: ROUGH ESTIMATION OF NUMBER OF HOUSES
FOR RELOCATION....................................................................................................9-52
TABLE 9.8.5 BABON AND DOMBO-SAYUNG RIVER: ROUGH EATIMATION OF
NUMBER OF HOUSES FOR RELOCATION............................................................9-52
TABLE 9.8.6 DOLOK RIVER (ALT-1 AND ALT-3): ROUGH ESTIMATION OF NUMBER OF
HOUSES FOR RELOCATION...................................................................................9-53
TABLE 9.8.7 DOLOK RIVER WITH BYPASS FLOODWAY(ALT-2 AND ALT-4): ROUGH
ESTIMATION OF NUMBER OF HOUSES FOR RELOCATION.............................9-54
TABLE 9.9.1 ESTIMATED LAND ACQUISITION OF MID-STREAM TO UPSTREAM
REACHES OF THE KBT............................................................................................9-55
TABLE 9.9.2 BABON RIVER: ESTIMATED LAND ACQUISITION AREA.................................9-56
TABLE 9.9.3 DOMBO-SAYUNG RIVER: ESTIMATED LAND ACQUISITION AREA..............9-56
TABLE 9.9.4 BABON AND DOMBO-SAYUNG RIVERS: ESTIMATED LAND ACQUISITION
AREA...........................................................................................................................9-57
TABLE 9.9.5 RIVER IMPROVEMENT OF THE DOLOK RIVER_ALT-1 AND ALT-3:
ESTIMATED LAND ACQUISITION AREA.............................................................9-57
TABLE 9.9.6 RIVER IMPROVEMENT OF THE DOLOK RIVER WITH BYPASS
FLOODWAY: ESTIMATED LAND ACQUISITION AREA.....................................9-58

TABLE 10.1.1 RECONSTRUCTION OF ROAD BRIDGE PRELIMINARY DESIGN.....................10-7


TABLE 10.1.2 RECONSTRUCTION OF PEDESTRIAN BRIDGES OF THE KBT..........................10-7

TABLE 11.5.1 KBT(FROM INLET GATE TO THE RIVER MOUTH): ESTIMATED PROJECT
COST...........................................................................................................................11-3
TABLE 11.5.2 KBT DOWNSTREAM REACH (RIVER MOUTH TO MAJAPAHIT BRIDGE):
ESTIMATED PROJECT COST...................................................................................11-8
TABLE 11.5.3 KBT MID TO UPSTREAM REACH (MAJAPAHIT BRIDGE TO THE INLET
GATE): ESTIMATED PROJECT COST...................................................................11-10
TABLE 11.6.1 BABON RIVER (ALT-1): ESTIMATED PROJECT COST.....................................11-13
TABLE 11.6.2 BABON RIVER (ALT-2): ESTIMATED PROJECT COST.....................................11-15
TABLE 11.7.1 DOMBO-SAYUNG RIVER (ALT-1): ESTIMATED PROJECT COST...................11-17
TABLE 11.7.2 DRAINAGE IMPROVEMENT BETWEEN THE DOMBO-SAYUNG RIVER
AND THE DOLOK RIVER.......................................................................................11-19
TABLE 11.7.3 DOMBO-SAYUNG RIVER (ALT-2): ESTIMATED PROJECT COST...................11-20
TABLE 11.7.4 DRAINAGE IMPROVEMENT BETWEEN THE DOMBO-SAYUNG RIVER
AND THE DOLOK RIVER.......................................................................................11-22
TABLE 11.7.5 STRENGTHENING OF THE RETARDING BASIN: ESTIMATED PROJECT

8
COST.........................................................................................................................11-23
TABLE 11.8.1 DOLOK RIVER ALT-1: ESTIMATED PROJECT COST........................................11-24
TABLE 11.8.2 DOLOK RIVER ALT-2: ESTIMATED PROJECT COST........................................11-27
TABLE 11.8.3 DOLOK RIVER ALT-3: ESTIMATED PROJECT COST........................................11-30
TABLE 11.8.4 DOLOK RIVER ALT-4: ESTIMATED PROJECT COST........................................11-33

TABLE 12.3.1 DAMAGEABLE VALUE OF RESIDENTIAL AREA...............................................12-3


TABLE 12.3.2 DAMAGEABLE VALUE OF INDUSTRIAL BUILDING.........................................12-4
TABLE 12.3.3 POPULATION, DENSITY AND NUMBER OF HOUSEHOLD................................12-5
TABLE 12.3.4 DAMAGEABLE VALUE OF RESIDENTIAL INFRASTRUCTURE.......................12-6
TABLE 12.3.5 ECONOMIC PRODUCTION COST OF WETT PADDY...........................................12-7
TABLE 12.3.6 THE AVERAGE PRODUCTIVITY OF RICE (1993-2015).......................................12-8
TABLE 12.3.7 ECONOMIC PRICE OF WET PADDY (IMPORT PARITY)....................................12-9
TABLE 12.3.8 AVERAGE DAMAGEABLE VALUE OF WET PADDY........................................12-10
TABLE 12.3.9 MILKFISH AQUACULTURE PRODUCTION COSTS WITH INTENSIVE
TECHNOLOGY.........................................................................................................12-11
TABLE 12.3.10 ECONOMIC PRICE OF MILKFISH (EKSPORT PARITY).....................................12-12
TABLE 12.3.11 AVERAGE DAMAGEABLE VALUE OF MILKFISH............................................12-13
TABLE 12.4.1 DAMAGE RATE BY INUNDATION DEPTH.........................................................12-14
TABLE 12.4.2 FLOOD AREA...........................................................................................................12-15
TABLE 12.5.1 CALCULATED FLOOD DAMAGE IN KBT...........................................................12-16
TABLE 12.5.2 CALCULATED FLOOD DAMAGE IN BABON RIVER........................................12-16
TABLE 12.5.3 CALCULATED FLOOD DAMAGE IN DOMBO SAYUNG RIVER......................12-16
TABLE 12.5.4 CALCULATED FLOOD DAMAGE IN DOLOK RIVER........................................12-16
TABLE 12.6.1 CALCULATION OF ANNUAL AVERAGE BENEFIT OF KBT............................12-17
TABLE 12.6.2 CALCULATION OF ANNUAL AVERAGE BENEFIT OF BABON RIVER..........12-18
TABLE 12.6.3 CALCULATION OF ANNUAL AVERAGE BENEFIT OF DOMBO SAYUNG
RIVERS.....................................................................................................................12-18
TABLE 12.6.4 CALCULATION OF ANNUAL AVERAGE BENEFIT OF DOLOK RIVER..........12-18
TABLE 12.7.1 ESTIMATED COMPENSATION ECONOMIC COSTS..........................................12-21
TABLE 12.7.2 COMPENSATION COST OF KBT (ILLEGAL HOUSE RELOCATION)..............12-22
TABLE 12.7.3 COMPENSATION COST OF KBT (LAND ACQUASITION)................................12-23
TABLE 12.7.4 COMPENSATION COST OF BABON RIVER (ALT-1)..........................................12-23
TABLE 12.7.5 COMPENSATION COST OF BABON RIVER (ALT-2)..........................................12-24
TABLE 12.7.6 COMPENSATION COST OF DOMBO SAYUNG RIVER (ALT-1).......................12-24
TABLE 12.7.7 COMPENSATION COST OF DOMBO SAYUNG RIVER (ALT-2).......................12-25
TABLE 12.7.8 COMPENSATION COST OF THE DRAINAGE CHANNEL BETWEEN
DOMBO-SAYUNG AND DOLOK RIVERS FOR ALT-2 OF THE PENGARRON
RIVER SYSTEM.......................................................................................................12-25

9
TABLE 12.7.9 COMPENSATION COST OF THE STRENGTHENING OF THE RETARDING
BASIN FOR ALT-2 OF THE PENGARRON RIVER SYSTEM..............................12-26
TABLE 12.7.10 COMPENSATION COST OF THE DOLOK RIVER (ALT-1).................................12-26
TABLE 12.7.11 COMPENSATION COST OF THE DOLOK RIVER (ALT-2).................................12-27
TABLE 12.7.12 COMPENSATION COST OF THE DOLOK RIVER (ALT-3).................................12-27
TABLE 12.7.13 COMPENSATION COST OF THE DOLOK RIVER (ALT-4).................................12-28
TABLE 12.7.14 ESTIMATED ECONOMIC PROJECT COST...........................................................12-29
TABLE 12.8.1 RECAPITULATION OF ANNUAL COST AND BENEFIT FLOW........................12-31
TABLE 12.8.2 ANNUAL COST AND BENEFIT FLOW OF KBT..................................................12-32
TABLE 12.8.3 ANNUAL COST AND BENEFIT FLOW OF BABON RIVER (ALT-1).................12-33
TABLE 12.8.4 ANNUAL COST AND BENEFIT FLOW OF BABON RIVER (ALT-2).................12-34
TABLE 12.8.5 ANNUAL COST AND BENEFIT FLOW OF DOMBO SAYUNG RIVER (ALT-1)
...................................................................................................................................12-35
TABLE 12.8.6 ANNUAL COST AND BENEFIT FLOW OF DOMBO SAYUNG RIVER (ALT-2)
...................................................................................................................................12-36
TABLE 12.8.7 ANNUAL COST AND BENEFIT FLOW OF DRAINAGE IMPROVMENT..........12-37
TABLE 12.8.8 ANNUAL COST AND BENEFIT FLOW OF DOLOK RIVER (ALT-1).................12-38
TABLE 12.8.9 ANNUAL COST AND BENEFIT FLOW OF DOLOK RIVER (ALT-2).................12-39
TABLE 12.8.10 ANNUAL COST AND BENEFIT FLOW OF DOLOK RIVER (ALT-3).................12-40
TABLE 12.8.11 ANNUAL COST AND BENEFIT FLOW OF DOLOK RIVER (ALT-4).................12-41
TABLE 12.8.12 ANNUAL COST AND BENEFIT FLOW PENGGARON SYSTEM.......................12-42
TABLE 12.8.13 ANNUAL COST AND BENEFIT FLOW PENGGARON SYSTEM (ALT-1)
WITHOUT DRAINAGE IMPROVMENT................................................................12-43
TABLE 12.8.14 ANNUAL COST AND BENEFIT FLOW PENGGARON SYSTEM (ALT-2)
WITHOUT DRAINAGE IMPROVMENT................................................................12-44
TABLE 12.8.15 ANNUAL COST AND BENEFIT FLOW PENGGARON SYSTEM (ALT-1) WITH
DRAINAGE IMPROVMENT....................................................................................12-45
TABLE 12.8.16 ANNUAL COST AND BENEFIT FLOW PENGGARON SYSTEM (ALT-2) WITH
DRAINAGE IMPROVMENT....................................................................................12-46
TABLE 12.8.17 PENGGARON RIVER SYSTEM (ALT-2 WITH DRAINAGE IMPROVEMENT):
RESULTS OF THE SENSITIVITY ANALYSIS......................................................12-47
TABLE 12.8.18 SENSITIFITY ANALYSIS OF THE PENGGARON RIVER SYSTEM (ALT-2)
WITH DRAINAGE IMPROVMENT (BENEFIT DOWN 5%).................................12-48
TABLE 12.8.19 SENSITIFITY ANALYSIS OF THE PENGGARON RIVER SYSTEM (ALT-2)
WITH DRAINAGE IMPROVMENT (BENEFIT DOWN 10%)...............................12-49
TABLE 12.8.20 SENSITIFITY ANALYSIS OF THE PENGGARON RIVER SYSTEM (ALT-2)
WITH DRAINAGE IMPROVMENT (COST UP 5%)..............................................12-50
TABLE 12.8.21 SENSITIFITY ANALISYS OF THE PENGGARON RIVER SYSTEM (ALT-2)
WITH DRAINAGE IMPROVMENT (COST UP 10%)............................................12-51
TABLE 12.9.1 KBT: RESULTS OF THE SENSITIVITY ANALYSIS............................................12-53
TABLE 12.9.2 SENSITIFITY ANALYSIS OF THE KBT (BENEFIT DOWN 5%).........................12-54

10
TABLE 12.9.3 SENSITIFITY ANALYSIS OF THE KBT (BENEFIT DOWN 10%)......................12-55
TABLE 12.9.4 SENSITIFITY ANALYSIS OF THE KBT (COST UP 5%)......................................12-56
TABLE 12.9.5 SENSITIFITY ANALYSIS OF THE KBT (COST UP 10%)....................................12-57

TABLE 13.3.1 PENGGARON RIVER SYSTEM (ALT-1): PROJECT FEATURE, COST AND
COMPENSATION.......................................................................................................13-3
TABLE 13.3.2 PENGGARON RIVER SYSTEM (ALT-2): PROJECT FEATURE, COST AND
COMPENSATION.......................................................................................................13-4
TABLE 13.3.3 PENGGARON RIVER SYSTEM ALT-1: COMPONENTS OF PROJECT COST.......13-
5
TABLE 13.3.4 PENGGARON RIVER SYSTEM ALT-2: COMPONENTS OF PROJECT COST.......13-
5
TABLE 13.3.5 DOLOK RIVER SYSTEM ALTERNATIVES: PROJECT FEATURE, COST AND
COMPENSATION.......................................................................................................13-6
TABLE 13.3.6 DOLOK RIVER SYSTEM ALT-1 TO ALT-4: COMPONENTS OF PROJECT
COSTS.........................................................................................................................13-7
TABLE 13.4.1 PROPOSED MASTER PLAN FOR FLOOD CONTROL.........................................13-11
TABLE 13.6.1 IMPLEMENTATION PROGRAM OF THE RIVER IMPROVEMENTS
(GENERAL)..............................................................................................................13-12
TABLE 13.6.2 IMPLEMENTATION PROGRAM OF THE RIVER IMPROVEMENTS
(BREAKDOWN).......................................................................................................13-13

TABLE 14.2.1 ISSUES TO BE DISCUSSED ON THE RIVER IMPROVEMENT OF THE KBT


DOWNSTREAM REACH...........................................................................................14-3

11
LIST OF FIGURES

FIGURE 1.3.1 STUDY AREA (TARGET RIVERS OF THE STUDY)...........................................1-2

FIGURE 2.1.1 TOPOGRAPHY IN AND AROUND THE DOLOK-PENGGARON RIVER


SYSTEM...................................................................................................................2-1
FIGURE 2.2.1 INLET GATE OF THE KBT ALONG THE PENGGARON RIVER AT
PUCANGGADING...................................................................................................2-3
FIGURE 2.2.2 PUCANGGADING WEIR AT THE STARTING PLACE OF THE BABON
RIVER.......................................................................................................................2-3
FIGURE 2.2.3 GERGAJI WEIR AT THE STARTING PLACE OF THE DOMBO-SAYUNG
RIVER.......................................................................................................................2-3
FIGURE 2.2.4 NATURAL RETARDING BASIN IN THE PENGGARON RIVER
(UPSTREAM VIEW)................................................................................................2-4
FIGURE 2.2.5 KBT MID-STREAM REACH (UPSTREAM VIEW)...............................................2-5
FIGURE 2.2.6 KBT DOWNSTREAM REACH (UPSTREAM VIEW)...........................................2-5
FIGURE 2.2.7 BABON RIVER MID-STREAM REACH (UPSTREAM VIEW)............................2-6
FIGURE 2.2.8 BABON RIVER DOWNSTREAM REACH AT PANTURA ROAD
(UPSTREAM VIEW)................................................................................................2-6
FIGURE 2.2.9 DOMBO-SAYUNG RIVER MIDSTREAM REACH (UPSTREAM VIEW)...........2-7
FIGURE 2.2.10 DOMBO-SAYUNG RIVER DOWNSTREAM REACH AT PANTURA ROAD
(UPSTREAM VIEW)................................................................................................2-7
FIGURE 2.2.11 DOLOK RIVER UPSTREAM REACH AT THE BIFURCATION TO KEBON
BATUR CANAL.......................................................................................................2-8
FIGURE 2.2.12 DOLOK RIVER MID-STREAM REACH (UPSTREAM VIEW)............................2-8
FIGURE 2.2.13 DOLOK RIVER DOWNSTREAM REACH BESIDE PANTURA ROAD..............2-9
FIGURE 2.2.14 DOLOK RIVER DOWNSTREAM REACH (NORTH PART OF PANTRA
ROAD)......................................................................................................................2-9
FIGURE 2.2.15 INLET GATE OF THE KEBON BATUR CANAL................................................2-10

FIGURE 3.1.1 LOCATION OF METEO-HYDROLOGICAL STATIONS.....................................3-2


FIGURE 3.2.1 OBSERVATION NETWORK OF RAINFALL........................................................3-2
FIGURE 3.2.2 CALCULATION METHOD OF PENGGARON RIVER DISCHARGE.................3-4
FIGURE 3.2.3 RATING CURVE AT PUCANGGADING WEIR AND GERGAJI WEIR.............3-4
FIGURE 3.2.4 LOCATION OF THE RIVER CROSS SECTIONAL SURVEY..............................3-6
FIGURE 3.3.1 MASS CURVE OF RAINFALL...............................................................................3-7
FIGURE 3.3.2 SUB-CATCHMENT AREA OF PENGGARON-DOLOK RIVER SYSTEM..........3-9
FIGURE 3.3.3 DRAINAGE BASIN IN RESIDUAL BASIN...........................................................3-9
FIGURE 3.3.4 DESIGN STORM OF 50 YEAR RETURN PERIOD.............................................3-12

12
FIGURE 3.3.5 PROBABILITY DISTRIBUTION ON PENNGARON RIVER.............................3-14
FIGURE 3.4.1 ROUGHNESS COEFFICIENTS IN AND AROUND RIVER CHANNEL............3-15
FIGURE 3.4.2 PRESENT DISCHARGE CAPACITIES (KBT).....................................................3-16
FIGURE 3.4.3 PRESENT DISCHARGE CAPACITIES (BABON RIVER)..................................3-16
FIGURE 3.4.4 PRESENT DISCHARGE CAPACITIES (DOMBO-SAYUNG RIVER)................3-17
FIGURE 3.4.5 PRESENT DISCHARGE CAPACITIES (DOLOK RIVER)..................................3-17

FIGURE 5.2.1 FLOOD SURVEY POINTS......................................................................................5-2


FIGURE 5.3.1 NUMBER OF ANSWERS ABOUT OCCURRENCE YEAR OF THE
HISTORICAL FLOODS...........................................................................................5-3
FIGURE 5.3.2 NUMBER OF ANSWERS ABOUT OCCURRENCE MONTH-YEAR OF THE
HISTORICAL FLOODS...........................................................................................5-3
FIGURE 5.3.3 MAXIMUM INUNDATION DEPTH OF THE COMBINED HISTORICAL
FLOODS...................................................................................................................5-4
FIGURE 5.3.4 FLOW DIRECTION OF THE COMBINED HISTORICAL FLOODS....................5-5
FIGURE 5.3.5 DURATION OF THE COMBINED HISTORICAL FLOODS.................................5-6
FIGURE 5.3.6 SOURCES OF THE COMBINED HISTORICAL FLOODS....................................5-7
FIGURE 5.3.7 DAMAGE RATE OF HOUSES OF THE COMBINED HISTORICAL FLOODS
..................................................................................................................................5-8
FIGURE 5.3.8 DAMAGE RATE OF CROPS (PADDY ETC.) OF THE COMBINED
HISTORICAL FLOODS...........................................................................................5-8
FIGURE 5.3.9 DAMAGE RATE OF FISH CULTURE OF THE COMBINED HISTORICAL
FLOODS...................................................................................................................5-9
FIGURE 5.3.10 MAXIMUM INUNDATION DEPTH OF THE JANUARY 2014 FLOOD............5-10
FIGURE 5.3.11 MAXIMUM INUNDATION DEPTH OF ANNUAL FLOODS.............................5-10

FIGURE 6.1.1 PROCEDURE OF BUILDING THE HYDROLOGICAL AND HYDRAULIC


MODEL....................................................................................................................6-1
FIGURE 6.2.1 HYDROGRAPH OF PENGGARON RIVER BASIN..............................................6-5
FIGURE 6.2.2 HYDROGRAPH OF D-3 KBT AND TRIBUTARIES BASIN................................6-5
FIGURE 6.2.3 HYDROGRAPH OF RESIDUAL BASIN KBT – BABON.....................................6-6
FIGURE 6.2.4 HYDROGRAPH OF RESIDUAL BASIN BABON-DOMBO SAYUNG................6-6
FIGURE 6.2.5 HYDROGRAPH OF RESIDUAL BASIN DOMBO-SAYUNG-DOLOK................6-7
FIGURE 6.2.6 HYDROGRAPH OF DOLOK RIVER......................................................................6-7
FIGURE 6.3.1 IMAGE OF UNSTEADY RIVER FLOW................................................................6-8
FIGURE 6.3.2 HYDRODYNAMIC MODEL NETWORK IN THE PENGGARON – DOLOK
RIVER SYSTEM......................................................................................................6-9
FIGURE 6.3.3 BOUNDARY CONDITION IN THE UNSTEADY FLOW ANALYSIS...............6-10
FIGURE 6.4.1 SCHEMATIC DIAGRAM OF INUNDATION ANALYSIS MODEL...................6-11
FIGURE 6.4.2 ELEVATION MAP (SRTM 3 SECOND)...............................................................6-12

13
FIGURE 6.5.1 SIMULATED INUNDATION AREA (50 YEAR RETURN PERIOD OF
FLOOD)..................................................................................................................6-13
FIGURE 6.5.2 HYDROGRAPH AT PUCANGGADING WEIR (50 YEAR RETURN PERIOD
OF FLOOD)............................................................................................................6-14
FIGURE 6.5.3 HYDROGRAPH AT PUCANGGADING WEIR (50 YEAR RETURN PERIOD
OF FLOOD)............................................................................................................6-14

FIGURE 7.2.1 PROPOSED DESIGN DISCHARGE OF THE DHV STUDY, 1992.......................7-2


FIGURE 7.3.1 PROPOSED DESIGN DISCHARGE OF THE JICA MASTER PLAN AND
FEASIBILITY STUDY, 1993...................................................................................7-3
FIGURE 7.4.1 PROPOSED DESIGN DISCHARGE OF THE IBRB_SMEC STUDY, 1999..........7-5
FIGURE 7.5.1 PROPOSED DESIGN DISCHARGE OF THE DD STUDY, 2009..........................7-6

FIGURE 9.3.1 PENGGARON RIVER SYSTEM_ALT-1: RIVER IMPROVEMENTS AND


UTILIZATION OF THE NATURAL RETARDING BASIN...................................9-3
FIGURE 9.3.2 PENGGARON RIVER SYSTEM_ALT-2: RIVER IMPROVEMENTS AND
STRENGTHENING OF THE RETARDING BASIN...............................................9-3
FIGURE 9.3.3 DOLOK RIVER_ALT-1: RIVER IMPROVEMENT WITHOUT DOLOK DAM
..................................................................................................................................9-4
FIGURE 9.3.4 DOLOK RIVER_ALT-2: RIVER IMPROVEMENT AND BYPASS
FLOODWAY WITHOUT DOLOK DAM................................................................9-5
FIGURE 9.3.5 DOLOK RIVER_ALT-3: RIVER IMPROVEMENT WITH DOLOK DAM...........9-5
FIGURE 9.3.6 DOLOK RIVER_ALT-4: RIVER IMPROVEMENT AND BYPASS
FLOODWAY WITH DOLOK DAM........................................................................9-6
FIGURE 9.3.7 PHOTOS OF THE CANDIDATE SITE OF THE BIFURCATION PLACE OF
THE DOLOK RIVER AND THE PROPOSED BYPASS FLOODWAY.................9-6
FIGURE 9.4.1 PENGGARON RIVER SYSTEM_ALT-1: DESIGN DISCHARGE (50-YEAR
RETURN PERIOD)..................................................................................................9-8
FIGURE 9.4.2 PENGGARON RIVER SYSTEM_ALT-2: DESIGN DISCHARGE (50-YEAR
RETURN PERIOD)..................................................................................................9-8
FIGURE 9.4.3 ALT-1 AS REFERENCE: INFLOW DISCHARGE OF D-9-1 AND D-9-2 TO
THE DOMBO-SAYUNG RIVER DOWNSTREAM REACH.................................9-9
FIGURE 9.4.4 ALT-2 AS REFERENCE: INFLOW DISCHARGE OF D-9-1 AND D-9-2 TO
THE DOMBO-SAYUNG RIVER DOWNSTREAM REACH...............................9-10
FIGURE 9.4.5 DOLOK RIVER_ALT-1: DESIGN DISCHARGE (50-YEAR RETURN
PERIOD).................................................................................................................9-11
FIGURE 9.4.6 DOLOK RIVER_ALT-2: DESIGN DISCHARGE (50-YEAR RETURN
PERIOD).................................................................................................................9-11
FIGURE 9.4.7 DOLOK RIVER_ALT-3: DESIGN DISCHARGE (50-YEAR RETURN
PERIOD).................................................................................................................9-12
FIGURE 9.4.8 DOLOK RIVER_ALT-4: DESIGN DISCHARGE (50-YEAR RETURN
PERIOD).................................................................................................................9-12
FIGURE 9.5.1 NATURAL RETARDING AREA (50-YEAR RETURN PERIOD OF FLOOD).......9-
13
14
FIGURE 9.5.2 CALCULATED HYDROGRAPH AT UPSTREAM AND DOWNSTREAM OF
RETARDING AREA..............................................................................................9-13
FIGURE 9.5.3 STRUCTURE OF HYDRAULIC MODEL FOR ALTERNATIVE-1....................9-14
FIGURE 9.5.4 INFLOW DISCHARGE TO KBT...........................................................................9-14
FIGURE 9.5.5 CALCULATED LONGITUDINAL PROFILE OF WATER LEVEL AND
DISCHARGE..........................................................................................................9-15
FIGURE 9.5.6 STRENGTHENING AREA FOR RETARDING BASIN.......................................9-16
FIGURE 9.5.7 SATELLITE ELEVATION DATA (2M DSM DEM DATA)................................9-17
FIGURE 9.5.8 CALCULATED HYDROGRAPH AT UPSTREAM AND DOWNSTREAM OF
RETARDING AREA..............................................................................................9-18
FIGURE 9.5.9 STRUCTURE OF HYDRAULIC MODEL FOR ALTERNATIVE-2....................9-19
FIGURE 9.5.10 CALCULATED LONGITUDINAL PROFILE OF WATER LEVEL AND
DISCHARGE (ALT-2)...........................................................................................9-20
FIGURE 9.5.11 CALCULATED HYDROGRAPH (ALT-2)...........................................................9-20
FIGURE 9.5.12 LONGITUDINAL WATER LEVEL AND DISCHARGE_ALT-1.........................9-21
FIGURE 9.5.13 HYDROGRAPH_ALTERNATIVE-1.....................................................................9-21
FIGURE 9.5.14 LONGITUDINAL PROFILE OF WATER LEVEL AND DISCHARGE_ALT-2
................................................................................................................................9-22
FIGURE 9.5.15 HYDROGRAPH_ALTERNATIVE-2.....................................................................9-22
FIGURE 9.5.16 H-A-V CURVE OF ALTERNATIVE-1.................................................................9-23
FIGURE 9.5.17 REVISED H-V CURVE..........................................................................................9-23
FIGURE 9.5.18 HYDROGRAPH OF DOLOK DAM......................................................................9-24
FIGURE 9.5.19 LONGITUDINAL PROFILE OF WATER LEVEL AND DISCHARGE_ALT-3
................................................................................................................................9-25
FIGURE 9.5.20 HYDROGRAPH_ALTERNATIVE-3.....................................................................9-25
FIGURE 9.5.21 LONGITUDINAL PROFILE OF WATER LEVEL AND DISCHARGE_ALT-4
................................................................................................................................9-26
FIGURE 9.5.22 HYDROGRAPH_ALTERNATIVE-4.....................................................................9-26
FIGURE 9.6.1 CONCEPTS FOR SETTING DESIGN CROSS SECTIONS..................................9-27
FIGURE 9.6.2 KBT_ALT_1 AND ALT-2: DESIGN PROFILE, CROSS SECTIONS AND
HWL.......................................................................................................................9-30
FIGURE 9.6.3 BABON RIVER_ALT-1: DESIGN PROFILE, CROSS SECTIONS AND HWL
................................................................................................................................9-32
FIGURE 9.6.4 BABON RIVER_ALT-2: DESIGN PROFILE, CROSS SECTIONS AND HWL
................................................................................................................................9-32
FIGURE 9.6.5 DOMBO-SAYUNG RIVER_ALT-1: DESIGN PROFILE, CROSS SECTIONS
AND HWL..............................................................................................................9-33
FIGURE 9.6.6 DOMBO-SAYUNG RIVER_ALT-2: DESIGN PROFILE, CROSS SECTIONS
AND HWL..............................................................................................................9-33
FIGURE 9.6.7 DOLOK RIVER_ALT-1: DESIGN PROFILE, CROSS SECTIONS AND HWL
................................................................................................................................9-34
FIGURE 9.6.8 DOLOK RIVER_ALT-2: DESIGN PROFILE, CROSS SECTIONS AND HWL

15
................................................................................................................................9-35
FIGURE 9.6.9 DOLOK RIVER_ALT-3: DESIGN PROFILE, CROSS SECTIONS AND HWL
................................................................................................................................9-35
FIGURE 9.6.10 DOLOK RIVER_ALT-4: DESIGN PROFILE, CROSS SECTIONS AND HWL
................................................................................................................................9-36
FIGURE 9.6.11 DOLOK RIVER BYPASS FLOODWAY...............................................................9-36
FIGURE 9.6.12 DOLOK RIVER: BIFURCATION OF THE BYPASS FLOODWAY (OPTION-
1).............................................................................................................................9-39
FIGURE 9.6.13 DOLOK RIVER: BIFIRCATION OF THE BYPASS FLOODWAY (OPTION-2)
................................................................................................................................9-39
FIGURE 9.7.1 LOCATION OF THE RIVER CROSSING AND RELATED STRUCTURES..........9-
40
FIGURE 9.7.2 CLOGGING IN THE UPSTREAM SIDE OF KALIGAWE BRIDGE BY
DEBRIS (AFTER JANUARY 2016 FLOOD)........................................................9-42
FIGURE 9.7.3 RAILWAY BRIDGE (UPSTREAM SIDE) OF THE KBT....................................9-42
FIGURE 9.7.4 RAILWAY BRIDGE (DOWNSTREAM SIDE) OF THE KBT.............................9-43
FIGURE 9.11.1 MAJOR DRAINAGE SYSTEMS BETWEEN THE KBT AND DOLOK RIVER
................................................................................................................................9-60
FIGURE 9.11.2 TENGGANG RIVER (DRAINAGE BASIN: D-7-1) AT THE RAILWAY
CROSSING POINT................................................................................................9-61
FIGURE 9.11.3 JOINT DRAINAGE CHANNEL OF THE DRAINAGE BASINS OF D-9-1 AND
D-9-2 AT THE RIGHT BANK SIDE OF THE DOMBO-SAYUNG RIVER.........9-61
FIGURE 9.11.4 CONDITION OF INLAND FLOOD (ANNUAL INUNDATION)........................9-62
FIGURE 9.11.5 MECHANISM/ CATEGORIES OF INLAND FLOODING...................................9-63
FIGURE 9.11.6 CONCEPTUAL PLAN OF DRAINAGE IMPROVEMENT..................................9-65
FIGURE 9.11.7 DESIGN DISCHARGE OF DRAINAGE IMPROVEMENT (10-YEAR
RETURN PERIOD)................................................................................................9-66

FIGURE 10.1.1 KBT: DESIGN LONGITUDINAL PROFILE (1/3)................................................10-2


FIGURE 10.1.2 KBT: DESIGN LONGITUDINAL PROFILE (2/3)................................................10-3
FIGURE 10.1.3 KBT: DESIGN LONGITUDINAL PROFILE (3/3)................................................10-4
FIGURE 10.1.4 KBT DOWNSTREAM REACH: TYPICAL DESIGN CROSS SECTIONS..........10-5
FIGURE 10.1.5 KBT MID-STREAM TO UPSTREAM REACHES: TYPICAL DESIGN CROSS
SECTIONS..............................................................................................................10-6
FIGURE 10.1.6 KBT DOWNSTREAM REACH: PRELIMINARY DESIGN OF
RECONSTRUCTION OF BRIDGES (PEDESTRIAN BRIDGE AT STATION
EF 3+100)...............................................................................................................10-8
FIGURE 10.1.7 KBT DOWNSTREAM REACH: PRELIMINARY DESIGN OF
RECONSTRUCTION OF BRIDGES (PEDESTRIAN BRIDGE AT STATION
EF 3+850)...............................................................................................................10-9
FIGURE 10.1.8 KBT MID-STREAM TO UPSTREAM REACHES: PRELIMINARY DESIGN
OF THE RECONSTRUCTION OF BRIDGES (1/2)............................................10-10
FIGURE 10.1.9 KBT MID-STREAM TO UPSTREAM REACHES: PRELIMINARY DESIGN

16
OF THE RECONSTRUCTION OF BRIDGES (2/2)............................................10-11
FIGURE 10.1.10 KBT: RIVER AMENITY ZONING PLAN (1/3)..................................................10-12
FIGURE 10.1.11 KBT: RIVER AMENITY ZONING PLAN (2/3)..................................................10-13
FIGURE 10.1.12 KBT: RIVER AMENITY ZONING PLAN (3/3)..................................................10-13
FIGURE 10.2.1 BABON RIVER: DESIGN LONGITUDINAL PROFILE FOR ALT-1 AND
ALT-2 (1/3)...........................................................................................................10-15
FIGURE 10.2.2 BABON RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-1 AND ALT-
2 (2/3)....................................................................................................................10-16
FIGURE 10.2.3 BABON RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-1 AND ALT-
2 (3/3)....................................................................................................................10-17
FIGURE 10.2.4 BABON RIVER: TYPICAL DESIGN CROSS SECTIONS OF ALT-1...............10-18
FIGURE 10.2.5 BABON RIVER: TYPICAL CROSS SECTIONS OF ALT-2..............................10-19
FIGURE 10.3.1 DOMBO-SAYUNG RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-1
AND ALT-2 (1/3).................................................................................................10-22
FIGURE 10.3.2 DOMBO-SAYUNG RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-1
AND ALT-2 (2/3).................................................................................................10-23
FIGURE 10.3.3 DOMBO-SAYUNG RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-1
AND ALT-2 (3/3).................................................................................................10-24
FIGURE 10.3.4 DOMBO-SAYUNG RIVER: TYPICAL DESIGN CROSS SECTIONS (ALT-1)
..............................................................................................................................10-25
FIGURE 10.3.5 DOMBO-SAYUNG RIVER: TYPICAL DESIGN CROSS SECTIONS (ALT-2)
..............................................................................................................................10-26
FIGURE 10.4.1 DOLOK RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-1 AND ALT-
3 (1/5)....................................................................................................................10-29
FIGURE 10.4.2 DOLOK RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-1 AND ALT-
3 (2/5)....................................................................................................................10-30
FIGURE 10.4.3 DOLOK RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-1 AND ALT-
3 (3/5)....................................................................................................................10-31
FIGURE 10.4.4 DOLOK RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-1 AND ALT-
3 (4/5)....................................................................................................................10-32
FIGURE 10.4.5 DOLOK RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-1 AND ALT-
3 (5/5)....................................................................................................................10-33
FIGURE 10.4.6 DOLOK RIVER ALT-1: TYPICAL DESIGN CROSS SECTIONS.....................10-34
FIGURE 10.4.7 DOLOK RIVER ALT-3: TYPICAL DESIGN CROSS SECTIONS.....................10-35
FIGURE 10.4.8 DOLOK RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-2 AND ALT-
4 (1/5)....................................................................................................................10-36
FIGURE 10.4.9 DOLOK RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-2 AND ALT-
4 (2/5)....................................................................................................................10-37
FIGURE 10.4.10 DOLOK RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-2 AND ALT-
4 (3/5)....................................................................................................................10-38
FIGURE 10.4.11 DOLOK RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-2 AND ALT-
4 (4/5)....................................................................................................................10-39
FIGURE 10.4.12 DOLOK RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-2 AND ALT-

17
4 (5/5)....................................................................................................................10-40
FIGURE 10.4.13 DOLOK RIVER ALT-2: TYPICAL DESIGN CROSS SECTIONS.....................10-41
FIGURE 10.4.14 DOLOK RIVER ALT-4: TYPICAL DESIGN CROSS SECTIONS.....................10-42

FIGURE 13.4.1 PROPOSED MASTER PLAN FOR FLOOD CONTROL......................................13-9


FIGURE 13.4.2 DESIGN DISCHARGE (50-YEAR RETURN PERIOD OF FLOOD) OF THE
PROPOSED FLOOD CONTROL...........................................................................13-9
FIGURE 13.4.3 TYPICAL DESIGN CROSS SECTIONS OF THE TARGET RIVERS OF THE
MASTER PLAN...................................................................................................13-10

SEPARATE VOLUMES:

VOLUME II:
ANNEX I METEO-HYDROLOGICAL DATA
ANNEX II SUMMARY OF FLOOD SURVEY
ANNEX IIII NVENTORY OF RIVER RELATED FACILITIES
ANNEX IV INVENTORY OF DRAINAGE CHANNELS

VOLUME III:
ANNEX V PRELIMINARY DESIGN OF THE EAST FLOODWAY (BANJIR KANAL
TIMUL: KBT)
ANNEX VI TYPICAL DESIGN OF THE BABON RIVER AND THE DOMBO-SAYUNG
RIVER
ANNEX VII TYPICAL DESIGN OF THE DOLOK RIVER

18
ABBREVIATIONS
AMC Antecedent Soil Moisture Conditions
Badan Perencanaan Pembangunan Nasional (State Ministry of National
BAPPENAS
Development Planning)
BBWS Balail Besar Wilayah Sungai Pemali Juana
BCR Benefit Cost Ratio
BKT Banjir Kanal Timur (East Floodway)
BMKG Badan Meteorologi, Klimatologi dan Geofisika
CN Curve Number
D/D Detailed Design
DAS River Basin
DEM Digital Elevation Model
DLA Damages and Loss Assessment
DS Downstream
DSM Digital Surface Model
EIRR Economic Internal Rate of Return
GRDP Gross Regional Domestic Product
H-A-V Height - Area - Volume
HD Hydrodynamic
HHWS Highest High Water Spring
HWL High Water Level
IBRD The International Bank for Reconstruction and Development
IPCC Intergovernmental Panel on Climate Change
JICA Japan International Cooperation Agency
LARAP Land Acquisition and Resettlement Action Plan
LLWS Lowest Low Water Spring
MHWS Mean High Water Spring
MLWS Mean Low Water Spring
MSL Mean Sea Level
NPV Net Present Value
PAP People Affected by Project
PSDA Pengelolaan Sumber Daya Air
Rp. Rupiah
SCS The Soil Conservation Service
SRTM Shuttle Radar Topography Mission
STA Station
US Upstream
USDA The United States Department of Agriculture
UTM The Universal Transverse Mercator
WGS The World Geodetic System

19

You might also like