Professional Documents
Culture Documents
TABLE OF CONTENTS
Page
SUMMARY
CHAPTER 1 INTRODUCTION...............................................................................................................1-1
1.1 Background...................................................................................................................................1-1
1.2 Objectives of the Study..................................................................................................................1-2
1.3 Study Area.....................................................................................................................................1-2
1.4 Scope of the Works of the Study on Flood Control Plan...............................................................1-3
CHAPTER 2. TOPOGRAPHY AND RIVER SYSTEMS.........................................................................2-1
2.1 Topographic Characteristics..........................................................................................................2-1
2.2 River Systems................................................................................................................................2-2
2.2.1 River Length and Catchment Area................................................................................................2-2
2.2.2 Penggaron River System...............................................................................................................2-2
2.2.3 Dolok River System......................................................................................................................2-7
CHAPTER 3. HYDROLOGY AND HYDRAULICS STUDY..................................................................3-1
3.1 Meteo-hydrological Observation Systems.....................................................................................3-1
3.2 Hydrological Data Collection........................................................................................................3-2
3.2.1 Maintenance Situation of Rainfall Data.........................................................................................3-2
3.2.2 Water level and Discharge.............................................................................................................3-4
3.2.3 Tide...............................................................................................................................................3-5
3.2.4 River Cross Sectional Survey........................................................................................................3-6
3.3 Probable Rainfall and Discharge...................................................................................................3-7
3.3.1 Actual Record of Rainfall Duration...............................................................................................3-7
3.3.2 Set Up of Design Rainfall Duration...............................................................................................3-8
3.3.3 Set Up of Basin Mean Rainfall......................................................................................................3-8
3.3.4 Maximum Basin Mean Rainfall and Probable Rainfall.................................................................3-8
3.3.5 Probable Peak Discharge.............................................................................................................3-14
3.4 Present Flow Capacities...............................................................................................................3-15
CHAPTER 4. SOCIO ECONOMY............................................................................................................4-1
4.1 Population......................................................................................................................................4-1
4.1.1 Amount and Population Growth....................................................................................................4-1
4.1.2 Distribution and Density of Population.........................................................................................4-4
i
4.1.3 Population by Livelihood..............................................................................................................4-4
4.2 Land Use.......................................................................................................................................4-6
4.2.1 Spatial Plan....................................................................................................................................4-6
4.2.2 Comparison of Land Use in 2010 and 2014...................................................................................4-6
4.3 Economic Activities......................................................................................................................4-8
4.3.1 Production.....................................................................................................................................4-8
4.3.2 Trading..........................................................................................................................................4-9
4.4 Economic Indicators....................................................................................................................4-10
4.4.1 Gross Regional Domestic Product (GRDP).................................................................................4-10
4.4.2 Inflation.......................................................................................................................................4-17
CHAPTER 5. FLOOD SURVEY...............................................................................................................5-1
5.1 Questionnaire Survey on Floods....................................................................................................5-1
5.2 Flood Survey points.......................................................................................................................5-2
5.3 Historical Floods...........................................................................................................................5-2
5.3.1 Occurrence Month-Year of the Historical Flood...........................................................................5-2
5.3.2 Combined Historical Floods..........................................................................................................5-4
5.3.3 January 2014 Flood.......................................................................................................................5-9
5.3.4 Annual Floods...............................................................................................................................5-9
CHAPTER 6. FLOOD SIMULATION MODEL.......................................................................................6-1
6.1 Model Structure.............................................................................................................................6-1
6.2 Runoff Analysis.............................................................................................................................6-2
6.2.1 Structure of Runoff Model.............................................................................................................6-2
6.2.2 Runoff Model................................................................................................................................6-3
6.2.3 Result of Runoff Analysis.............................................................................................................6-5
6.3 Hydrodynamic Model (MIKE 11 HD Module).............................................................................6-8
6.4 Inundation Analysis.....................................................................................................................6-11
6.4.1 Structure of Inundation Analysis Model......................................................................................6-11
6.4.2 Model Parameters........................................................................................................................6-11
6.5 Flood Simulation for the Present Conditions...............................................................................6-13
CHAPTER 7. REVIEW OF THE EXISTING FLOOD CONTROL PLANS............................................7-1
7.1 Previous Flood Control Studies and Plans.....................................................................................7-1
7.2 Dolok Penggaron Drainage Design, Feasibility Study, DHV, October 1992.................................7-1
7.3 JICA Master Plan and Feasibility Study in 1993...........................................................................7-2
7.4 Semarang Flood Control Project, Consolidated Preparation Study, under IBRD Loan,
November 1999 by SMEC and Associated Indonesian Consultants..............................................7-4
7.5 Detail Desain Sistem Sungai Dolok Penggaron (Kanal Banjir Timur – Dombo Sayung), PT.
Jasapatria Gunatama, November 2009...........................................................................................7-5
ii
CHAPTER 8. PROBLEMS AND ISSUES AND DIRECTION OF FLOOD CONTROL.........................8-1
8.1 Problems and Issues......................................................................................................................8-1
8.2 Direction of Flood Control............................................................................................................8-3
CHAPTER 9. FLOOD CONTROL PLANS..............................................................................................9-1
9.1 Basic Concepts for Formulating Flood Control Plans....................................................................9-1
9.2 Conditions of Setting Design Discharge........................................................................................9-1
9.3 Alternatives of Flood Control Plans..............................................................................................9-2
9.3.1 Alternatives of the Penggaron River System.................................................................................9-2
9.3.2 Alternatives of the Dolok River System (Dolok River).................................................................9-4
9.4 Design Discharge of the Alternatives............................................................................................9-7
9.4.1 Design Discharge of the Alternatives of Penggaron River System................................................9-8
9.4.2 Design Discharge of the Alternatives of the Dolok River............................................................9-11
9.5 Hydrological and Hydraulic Study on the Alternative Flood Control Plans................................9-13
9.5.1 Penggaron RS_Alternative-1.......................................................................................................9-13
9.5.2 Penggaron RS_Alternative-2.......................................................................................................9-15
9.5.3 Dolok RS_Alternative-1..............................................................................................................9-21
9.5.4 Dolok RS_Alternative-2..............................................................................................................9-22
9.5.5 Set of Dolok Dam Outflow..........................................................................................................9-23
9.5.6 Dolok RS_Alternative-3 (With Dolok Dam)...............................................................................9-25
9.5.7 Dolok RS_Alternative-4 (With Dolok Dam)...............................................................................9-26
9.6 Design Profile and Design Cross Sections of the Alternative Flood Control Plans.....................9-27
9.6.1 Concepts for Setting Design Bed Profile and Design Cross Sections..........................................9-27
9.6.2 KBT: Design Profile and Typical Design Cross Sections............................................................9-28
9.6.3 Babon River: Design Profile and Typical Design Cross Sections................................................9-31
9.6.4 Dombo-Sayung River: Design Profile and Typical Design Cross Sections.................................9-31
9.6.5 Dolok River: Design Profile and Typical Design Cross Sections................................................9-34
9.7 Reconstruction of Bridges (etc.)..................................................................................................9-40
9.7.1 Existing River Crossing Structures..............................................................................................9-40
9.7.2 River Crossing Structures for Reconstruction..............................................................................9-41
9.8 Relocation OF HOUSES.............................................................................................................9-50
9.8.1 KBT: Relocation of Houses.........................................................................................................9-50
9.8.2 Babon River and the Dombo-Sayung River: Relocation of Houses.............................................9-51
9.8.3 Dolok River: Relocation of Houses.............................................................................................9-53
9.9 Land Acquisition.........................................................................................................................9-55
9.9.1 KBT: Land Acquisition...............................................................................................................9-55
9.9.2 Babon River and the Dombo-Sayung River: Land Acquisition...................................................9-56
9.9.3 Dolok River: Land Acquisition....................................................................................................9-57
iii
9.10 Consideration of Climate Change and Land Subsidence.............................................................9-59
9.11 Conceptual Plan of Drainage Improvement.................................................................................9-60
9.11.1 Drainage Systems and Drainage Problems..................................................................................9-60
9.11.2 Condition and Mechanism of Inland Floods................................................................................9-62
9.11.3 Conceptual Plan of Drainage Improvement.................................................................................9-64
CHAPTER 10. PRELIMINARY DESIGN OF THE KBT (FEASIBILITY STUDY LEVEL) AND
TYPICAL DESIGN OF THE BABON, DOMBO-SAYUNG AND DOLOK
RIVERS (MASTER PLAN LEVEL)...........................................................................10-1
10.1 Preliminary Design of the KBT...................................................................................................10-1
10.1.1 Design of Longitudinal Profile and Cross Sections.....................................................................10-1
10.1.2 Reconstruction of Bridges...........................................................................................................10-7
10.1.3 River Amenity Plan for the KBT Downstream Reach...............................................................10-12
10.2 Typical Design of the Babon River............................................................................................10-14
10.2.1 Design Longitudinal Profile and Typical Design Cross Sections...............................................10-14
10.3 Typical Design of the Dombo-Sayung River.............................................................................10-20
10.3.1 Design of Longitudinal Profile and Typical Cross Section........................................................10-20
10.4 Typical Design of the Dolok River including Bypass Floodway...............................................10-27
10.4.1 Design Longitudinal Profile and Typical Cross Sections...........................................................10-27
CHAPTER 11. COST ESTIMATION..................................................................................................11-1
11.1 Source of Data
11.2 Terms and Definitions..................................................................................................................11-1
11.3 Composition of Cost Items...........................................................................................................11-2
11.4 Scope of Work..............................................................................................................................11-3
11.5 Kanal Banjir Timur (KBT)...........................................................................................................11-3
11.6 Babon River................................................................................................................................11-13
11.6.1 Cost Estimation of the Babon River Alternative 1 (Alt-1)..........................................................11-13
11.6.2 Cost Estimation of the Babon River Alternative 2 (Alt-2)..........................................................11-15
11.7 Dombo-Sayung...........................................................................................................................11-17
11.7.1 Cost Estimation of the Dombo Sayung River Alternative 1 (Alt-1)............................................11-17
11.7.2 Cost Estimation of the Dombo Sayung River Alternative 2 (Alt-2)............................................11-20
11.8 Dolok River................................................................................................................................11-24
11.8.1 Dolok River Alternative 1 (Alt-1)...............................................................................................11-24
11.8.2 Dolok River Alternative 2 (Alt-2)...............................................................................................11-27
11.8.3 Dolok River Alternative 3 (Alt-3)...............................................................................................11-30
11.8.4 Dolok River Alternative 4 (Alt-4)...............................................................................................11-33
CHAPTER 12. ECONOMIC EVALUATION......................................................................................12-1
12.1 Flood Control Plan........................................................................................................................12-1
12.2 Basic Condition............................................................................................................................12-1
iv
12.3 Classification of Flood Damage....................................................................................................12-1
12.4 Flood Area and Damage Rate by Inundation Depth....................................................................12-14
12.5 Calculated Flood Damage...........................................................................................................12-16
12.6 Estimation of Annual Average Benefit.......................................................................................12-17
12.7 Methods of Economic Analysis..................................................................................................12-19
12.7.1 Parameter....................................................................................................................................12-19
12.7.2 Interest Rate................................................................................................................................12-20
12.7.3 Conversion Factor.......................................................................................................................12-20
12.7.4 Economic Project Cost...............................................................................................................12-21
12.8 Economic Evaluation on Flood Control Master Plan..................................................................12-30
12.8.1 Annual Cost and Benefit Flow....................................................................................................12-30
12.8.2 Economic Evaluation on the Flood Control Master Plan............................................................12-42
12.8.3 Sensitivity Analysis....................................................................................................................12-47
12.8.4 Project Justification....................................................................................................................12-47
12.9 Feasibility Study on East Floodway/KBT...................................................................................12-52
12.9.1 Flood Control Plan......................................................................................................................12-52
12.9.2 Basic Condition..........................................................................................................................12-52
12.9.3 Annual Average Benefit.............................................................................................................12-52
12.9.4 Calculated Flood Damage...........................................................................................................12-52
12.9.5 Estimation of Annual Average Benefit.......................................................................................12-52
12.9.6 Economic Project Cost...............................................................................................................12-52
12.9.7 Evaluation of the Flood Control Project.....................................................................................12-52
12.9.8 Sensitivity Analysis....................................................................................................................12-53
12.9.9 Project Justification....................................................................................................................12-53
CHAPTER 13. PROPOSED MASTER PLAN AND PRIORITY PROJECTS.....................................13-1
13.1 Basic Concepts for Flood Control.................................................................................................13-1
13.2 Conditions of Setting Design Discharge.......................................................................................13-1
13.3 Alternatives of the Flood Control Plans........................................................................................13-2
13.4 Proposed Master Plan for Flood Control......................................................................................13-8
13.5 Priority Project............................................................................................................................13-11
13.6 Implementation Program of the River Improvements.................................................................13-12
CHAPTER 14. CONCLUSION AND RECOMMENDATION............................................................14-1
14.1 Conclusion and Recommendation................................................................................................14-1
14.2 Issues to be Discussed for Implementing the River Improvements...............................................14-3
v
LIST OF TABLES
TABLE 2.2.1 RIVER LENGTH AND CATCHMENT AREA OF THE PENGGARON AND
DOLOK RIVER SYSTEMS..........................................................................................2-2
6
TABLE 4.4.1 GROSS REGIONAL DOMESTIC PRODUCT CURRENT PRICE (RP.) IN
SEMARANG (2010-2014)...........................................................................................4-12
TABLE 4.4.2 GROSS REGIONAL DOMESTIC PRODUCT CONSTANT PRICE (RP.) IN
SEMARANG (2010-2014)...........................................................................................4-13
TABLE 4.4.3 GROSS REGIONAL DOMESTIC PRODUCT PER CAPITA BASED ON
CURRENT PRICE (RP.) IN SEMARANG (2010-2014).............................................4-14
TABLE 4.4.4 GROSS REGIONAL DOMESTIC PRODUCT BASED ON CURRENT PRICE
(RP.) IN DEMAK (2010-2014)....................................................................................4-15
TABLE 4.4.5 GROSS REGIONAL DOMESTIC PRODUCT BASED ON CONSTANT PRICE
(RP.) IN DEMAK (2010-2014)....................................................................................4-16
TABLE 4.4.6 INFLATION OF CENTRAL JAVA AND SIX CITIES IN CENTRAL JAVA...........4-17
TABLE 4.4.7 INFLATION PER GROUP (2014) (Percent)...............................................................4-17
7
TABLE 9.8.1 KBT DOWNSTREAM REACH: NUMBER OF HOUSES TO BE RELOCATED........9-
50
TABLE 9.8.2 KBT MID-STREAM TO UPSTREAM REACH: ROUGH ESTIMATION OF THE
NUMBER OF HOUSES TO BE RELOCATED..........................................................9-51
TABLE 9.8.3 BABON RIVER: ROUGH ESTIMATION OF NUMBER OF HOUSES FOR
RELOCATION............................................................................................................9-51
TABLE 9.8.4 DOMBO-SAYUNG RIVER: ROUGH ESTIMATION OF NUMBER OF HOUSES
FOR RELOCATION....................................................................................................9-52
TABLE 9.8.5 BABON AND DOMBO-SAYUNG RIVER: ROUGH EATIMATION OF
NUMBER OF HOUSES FOR RELOCATION............................................................9-52
TABLE 9.8.6 DOLOK RIVER (ALT-1 AND ALT-3): ROUGH ESTIMATION OF NUMBER OF
HOUSES FOR RELOCATION...................................................................................9-53
TABLE 9.8.7 DOLOK RIVER WITH BYPASS FLOODWAY(ALT-2 AND ALT-4): ROUGH
ESTIMATION OF NUMBER OF HOUSES FOR RELOCATION.............................9-54
TABLE 9.9.1 ESTIMATED LAND ACQUISITION OF MID-STREAM TO UPSTREAM
REACHES OF THE KBT............................................................................................9-55
TABLE 9.9.2 BABON RIVER: ESTIMATED LAND ACQUISITION AREA.................................9-56
TABLE 9.9.3 DOMBO-SAYUNG RIVER: ESTIMATED LAND ACQUISITION AREA..............9-56
TABLE 9.9.4 BABON AND DOMBO-SAYUNG RIVERS: ESTIMATED LAND ACQUISITION
AREA...........................................................................................................................9-57
TABLE 9.9.5 RIVER IMPROVEMENT OF THE DOLOK RIVER_ALT-1 AND ALT-3:
ESTIMATED LAND ACQUISITION AREA.............................................................9-57
TABLE 9.9.6 RIVER IMPROVEMENT OF THE DOLOK RIVER WITH BYPASS
FLOODWAY: ESTIMATED LAND ACQUISITION AREA.....................................9-58
TABLE 11.5.1 KBT(FROM INLET GATE TO THE RIVER MOUTH): ESTIMATED PROJECT
COST...........................................................................................................................11-3
TABLE 11.5.2 KBT DOWNSTREAM REACH (RIVER MOUTH TO MAJAPAHIT BRIDGE):
ESTIMATED PROJECT COST...................................................................................11-8
TABLE 11.5.3 KBT MID TO UPSTREAM REACH (MAJAPAHIT BRIDGE TO THE INLET
GATE): ESTIMATED PROJECT COST...................................................................11-10
TABLE 11.6.1 BABON RIVER (ALT-1): ESTIMATED PROJECT COST.....................................11-13
TABLE 11.6.2 BABON RIVER (ALT-2): ESTIMATED PROJECT COST.....................................11-15
TABLE 11.7.1 DOMBO-SAYUNG RIVER (ALT-1): ESTIMATED PROJECT COST...................11-17
TABLE 11.7.2 DRAINAGE IMPROVEMENT BETWEEN THE DOMBO-SAYUNG RIVER
AND THE DOLOK RIVER.......................................................................................11-19
TABLE 11.7.3 DOMBO-SAYUNG RIVER (ALT-2): ESTIMATED PROJECT COST...................11-20
TABLE 11.7.4 DRAINAGE IMPROVEMENT BETWEEN THE DOMBO-SAYUNG RIVER
AND THE DOLOK RIVER.......................................................................................11-22
TABLE 11.7.5 STRENGTHENING OF THE RETARDING BASIN: ESTIMATED PROJECT
8
COST.........................................................................................................................11-23
TABLE 11.8.1 DOLOK RIVER ALT-1: ESTIMATED PROJECT COST........................................11-24
TABLE 11.8.2 DOLOK RIVER ALT-2: ESTIMATED PROJECT COST........................................11-27
TABLE 11.8.3 DOLOK RIVER ALT-3: ESTIMATED PROJECT COST........................................11-30
TABLE 11.8.4 DOLOK RIVER ALT-4: ESTIMATED PROJECT COST........................................11-33
9
TABLE 12.7.9 COMPENSATION COST OF THE STRENGTHENING OF THE RETARDING
BASIN FOR ALT-2 OF THE PENGARRON RIVER SYSTEM..............................12-26
TABLE 12.7.10 COMPENSATION COST OF THE DOLOK RIVER (ALT-1).................................12-26
TABLE 12.7.11 COMPENSATION COST OF THE DOLOK RIVER (ALT-2).................................12-27
TABLE 12.7.12 COMPENSATION COST OF THE DOLOK RIVER (ALT-3).................................12-27
TABLE 12.7.13 COMPENSATION COST OF THE DOLOK RIVER (ALT-4).................................12-28
TABLE 12.7.14 ESTIMATED ECONOMIC PROJECT COST...........................................................12-29
TABLE 12.8.1 RECAPITULATION OF ANNUAL COST AND BENEFIT FLOW........................12-31
TABLE 12.8.2 ANNUAL COST AND BENEFIT FLOW OF KBT..................................................12-32
TABLE 12.8.3 ANNUAL COST AND BENEFIT FLOW OF BABON RIVER (ALT-1).................12-33
TABLE 12.8.4 ANNUAL COST AND BENEFIT FLOW OF BABON RIVER (ALT-2).................12-34
TABLE 12.8.5 ANNUAL COST AND BENEFIT FLOW OF DOMBO SAYUNG RIVER (ALT-1)
...................................................................................................................................12-35
TABLE 12.8.6 ANNUAL COST AND BENEFIT FLOW OF DOMBO SAYUNG RIVER (ALT-2)
...................................................................................................................................12-36
TABLE 12.8.7 ANNUAL COST AND BENEFIT FLOW OF DRAINAGE IMPROVMENT..........12-37
TABLE 12.8.8 ANNUAL COST AND BENEFIT FLOW OF DOLOK RIVER (ALT-1).................12-38
TABLE 12.8.9 ANNUAL COST AND BENEFIT FLOW OF DOLOK RIVER (ALT-2).................12-39
TABLE 12.8.10 ANNUAL COST AND BENEFIT FLOW OF DOLOK RIVER (ALT-3).................12-40
TABLE 12.8.11 ANNUAL COST AND BENEFIT FLOW OF DOLOK RIVER (ALT-4).................12-41
TABLE 12.8.12 ANNUAL COST AND BENEFIT FLOW PENGGARON SYSTEM.......................12-42
TABLE 12.8.13 ANNUAL COST AND BENEFIT FLOW PENGGARON SYSTEM (ALT-1)
WITHOUT DRAINAGE IMPROVMENT................................................................12-43
TABLE 12.8.14 ANNUAL COST AND BENEFIT FLOW PENGGARON SYSTEM (ALT-2)
WITHOUT DRAINAGE IMPROVMENT................................................................12-44
TABLE 12.8.15 ANNUAL COST AND BENEFIT FLOW PENGGARON SYSTEM (ALT-1) WITH
DRAINAGE IMPROVMENT....................................................................................12-45
TABLE 12.8.16 ANNUAL COST AND BENEFIT FLOW PENGGARON SYSTEM (ALT-2) WITH
DRAINAGE IMPROVMENT....................................................................................12-46
TABLE 12.8.17 PENGGARON RIVER SYSTEM (ALT-2 WITH DRAINAGE IMPROVEMENT):
RESULTS OF THE SENSITIVITY ANALYSIS......................................................12-47
TABLE 12.8.18 SENSITIFITY ANALYSIS OF THE PENGGARON RIVER SYSTEM (ALT-2)
WITH DRAINAGE IMPROVMENT (BENEFIT DOWN 5%).................................12-48
TABLE 12.8.19 SENSITIFITY ANALYSIS OF THE PENGGARON RIVER SYSTEM (ALT-2)
WITH DRAINAGE IMPROVMENT (BENEFIT DOWN 10%)...............................12-49
TABLE 12.8.20 SENSITIFITY ANALYSIS OF THE PENGGARON RIVER SYSTEM (ALT-2)
WITH DRAINAGE IMPROVMENT (COST UP 5%)..............................................12-50
TABLE 12.8.21 SENSITIFITY ANALISYS OF THE PENGGARON RIVER SYSTEM (ALT-2)
WITH DRAINAGE IMPROVMENT (COST UP 10%)............................................12-51
TABLE 12.9.1 KBT: RESULTS OF THE SENSITIVITY ANALYSIS............................................12-53
TABLE 12.9.2 SENSITIFITY ANALYSIS OF THE KBT (BENEFIT DOWN 5%).........................12-54
10
TABLE 12.9.3 SENSITIFITY ANALYSIS OF THE KBT (BENEFIT DOWN 10%)......................12-55
TABLE 12.9.4 SENSITIFITY ANALYSIS OF THE KBT (COST UP 5%)......................................12-56
TABLE 12.9.5 SENSITIFITY ANALYSIS OF THE KBT (COST UP 10%)....................................12-57
TABLE 13.3.1 PENGGARON RIVER SYSTEM (ALT-1): PROJECT FEATURE, COST AND
COMPENSATION.......................................................................................................13-3
TABLE 13.3.2 PENGGARON RIVER SYSTEM (ALT-2): PROJECT FEATURE, COST AND
COMPENSATION.......................................................................................................13-4
TABLE 13.3.3 PENGGARON RIVER SYSTEM ALT-1: COMPONENTS OF PROJECT COST.......13-
5
TABLE 13.3.4 PENGGARON RIVER SYSTEM ALT-2: COMPONENTS OF PROJECT COST.......13-
5
TABLE 13.3.5 DOLOK RIVER SYSTEM ALTERNATIVES: PROJECT FEATURE, COST AND
COMPENSATION.......................................................................................................13-6
TABLE 13.3.6 DOLOK RIVER SYSTEM ALT-1 TO ALT-4: COMPONENTS OF PROJECT
COSTS.........................................................................................................................13-7
TABLE 13.4.1 PROPOSED MASTER PLAN FOR FLOOD CONTROL.........................................13-11
TABLE 13.6.1 IMPLEMENTATION PROGRAM OF THE RIVER IMPROVEMENTS
(GENERAL)..............................................................................................................13-12
TABLE 13.6.2 IMPLEMENTATION PROGRAM OF THE RIVER IMPROVEMENTS
(BREAKDOWN).......................................................................................................13-13
11
LIST OF FIGURES
12
FIGURE 3.3.5 PROBABILITY DISTRIBUTION ON PENNGARON RIVER.............................3-14
FIGURE 3.4.1 ROUGHNESS COEFFICIENTS IN AND AROUND RIVER CHANNEL............3-15
FIGURE 3.4.2 PRESENT DISCHARGE CAPACITIES (KBT).....................................................3-16
FIGURE 3.4.3 PRESENT DISCHARGE CAPACITIES (BABON RIVER)..................................3-16
FIGURE 3.4.4 PRESENT DISCHARGE CAPACITIES (DOMBO-SAYUNG RIVER)................3-17
FIGURE 3.4.5 PRESENT DISCHARGE CAPACITIES (DOLOK RIVER)..................................3-17
13
FIGURE 6.5.1 SIMULATED INUNDATION AREA (50 YEAR RETURN PERIOD OF
FLOOD)..................................................................................................................6-13
FIGURE 6.5.2 HYDROGRAPH AT PUCANGGADING WEIR (50 YEAR RETURN PERIOD
OF FLOOD)............................................................................................................6-14
FIGURE 6.5.3 HYDROGRAPH AT PUCANGGADING WEIR (50 YEAR RETURN PERIOD
OF FLOOD)............................................................................................................6-14
15
................................................................................................................................9-35
FIGURE 9.6.9 DOLOK RIVER_ALT-3: DESIGN PROFILE, CROSS SECTIONS AND HWL
................................................................................................................................9-35
FIGURE 9.6.10 DOLOK RIVER_ALT-4: DESIGN PROFILE, CROSS SECTIONS AND HWL
................................................................................................................................9-36
FIGURE 9.6.11 DOLOK RIVER BYPASS FLOODWAY...............................................................9-36
FIGURE 9.6.12 DOLOK RIVER: BIFURCATION OF THE BYPASS FLOODWAY (OPTION-
1).............................................................................................................................9-39
FIGURE 9.6.13 DOLOK RIVER: BIFIRCATION OF THE BYPASS FLOODWAY (OPTION-2)
................................................................................................................................9-39
FIGURE 9.7.1 LOCATION OF THE RIVER CROSSING AND RELATED STRUCTURES..........9-
40
FIGURE 9.7.2 CLOGGING IN THE UPSTREAM SIDE OF KALIGAWE BRIDGE BY
DEBRIS (AFTER JANUARY 2016 FLOOD)........................................................9-42
FIGURE 9.7.3 RAILWAY BRIDGE (UPSTREAM SIDE) OF THE KBT....................................9-42
FIGURE 9.7.4 RAILWAY BRIDGE (DOWNSTREAM SIDE) OF THE KBT.............................9-43
FIGURE 9.11.1 MAJOR DRAINAGE SYSTEMS BETWEEN THE KBT AND DOLOK RIVER
................................................................................................................................9-60
FIGURE 9.11.2 TENGGANG RIVER (DRAINAGE BASIN: D-7-1) AT THE RAILWAY
CROSSING POINT................................................................................................9-61
FIGURE 9.11.3 JOINT DRAINAGE CHANNEL OF THE DRAINAGE BASINS OF D-9-1 AND
D-9-2 AT THE RIGHT BANK SIDE OF THE DOMBO-SAYUNG RIVER.........9-61
FIGURE 9.11.4 CONDITION OF INLAND FLOOD (ANNUAL INUNDATION)........................9-62
FIGURE 9.11.5 MECHANISM/ CATEGORIES OF INLAND FLOODING...................................9-63
FIGURE 9.11.6 CONCEPTUAL PLAN OF DRAINAGE IMPROVEMENT..................................9-65
FIGURE 9.11.7 DESIGN DISCHARGE OF DRAINAGE IMPROVEMENT (10-YEAR
RETURN PERIOD)................................................................................................9-66
16
OF THE RECONSTRUCTION OF BRIDGES (2/2)............................................10-11
FIGURE 10.1.10 KBT: RIVER AMENITY ZONING PLAN (1/3)..................................................10-12
FIGURE 10.1.11 KBT: RIVER AMENITY ZONING PLAN (2/3)..................................................10-13
FIGURE 10.1.12 KBT: RIVER AMENITY ZONING PLAN (3/3)..................................................10-13
FIGURE 10.2.1 BABON RIVER: DESIGN LONGITUDINAL PROFILE FOR ALT-1 AND
ALT-2 (1/3)...........................................................................................................10-15
FIGURE 10.2.2 BABON RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-1 AND ALT-
2 (2/3)....................................................................................................................10-16
FIGURE 10.2.3 BABON RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-1 AND ALT-
2 (3/3)....................................................................................................................10-17
FIGURE 10.2.4 BABON RIVER: TYPICAL DESIGN CROSS SECTIONS OF ALT-1...............10-18
FIGURE 10.2.5 BABON RIVER: TYPICAL CROSS SECTIONS OF ALT-2..............................10-19
FIGURE 10.3.1 DOMBO-SAYUNG RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-1
AND ALT-2 (1/3).................................................................................................10-22
FIGURE 10.3.2 DOMBO-SAYUNG RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-1
AND ALT-2 (2/3).................................................................................................10-23
FIGURE 10.3.3 DOMBO-SAYUNG RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-1
AND ALT-2 (3/3).................................................................................................10-24
FIGURE 10.3.4 DOMBO-SAYUNG RIVER: TYPICAL DESIGN CROSS SECTIONS (ALT-1)
..............................................................................................................................10-25
FIGURE 10.3.5 DOMBO-SAYUNG RIVER: TYPICAL DESIGN CROSS SECTIONS (ALT-2)
..............................................................................................................................10-26
FIGURE 10.4.1 DOLOK RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-1 AND ALT-
3 (1/5)....................................................................................................................10-29
FIGURE 10.4.2 DOLOK RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-1 AND ALT-
3 (2/5)....................................................................................................................10-30
FIGURE 10.4.3 DOLOK RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-1 AND ALT-
3 (3/5)....................................................................................................................10-31
FIGURE 10.4.4 DOLOK RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-1 AND ALT-
3 (4/5)....................................................................................................................10-32
FIGURE 10.4.5 DOLOK RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-1 AND ALT-
3 (5/5)....................................................................................................................10-33
FIGURE 10.4.6 DOLOK RIVER ALT-1: TYPICAL DESIGN CROSS SECTIONS.....................10-34
FIGURE 10.4.7 DOLOK RIVER ALT-3: TYPICAL DESIGN CROSS SECTIONS.....................10-35
FIGURE 10.4.8 DOLOK RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-2 AND ALT-
4 (1/5)....................................................................................................................10-36
FIGURE 10.4.9 DOLOK RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-2 AND ALT-
4 (2/5)....................................................................................................................10-37
FIGURE 10.4.10 DOLOK RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-2 AND ALT-
4 (3/5)....................................................................................................................10-38
FIGURE 10.4.11 DOLOK RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-2 AND ALT-
4 (4/5)....................................................................................................................10-39
FIGURE 10.4.12 DOLOK RIVER: DESIGN LONGITUDINAL PROFILE OF ALT-2 AND ALT-
17
4 (5/5)....................................................................................................................10-40
FIGURE 10.4.13 DOLOK RIVER ALT-2: TYPICAL DESIGN CROSS SECTIONS.....................10-41
FIGURE 10.4.14 DOLOK RIVER ALT-4: TYPICAL DESIGN CROSS SECTIONS.....................10-42
SEPARATE VOLUMES:
VOLUME II:
ANNEX I METEO-HYDROLOGICAL DATA
ANNEX II SUMMARY OF FLOOD SURVEY
ANNEX IIII NVENTORY OF RIVER RELATED FACILITIES
ANNEX IV INVENTORY OF DRAINAGE CHANNELS
VOLUME III:
ANNEX V PRELIMINARY DESIGN OF THE EAST FLOODWAY (BANJIR KANAL
TIMUL: KBT)
ANNEX VI TYPICAL DESIGN OF THE BABON RIVER AND THE DOMBO-SAYUNG
RIVER
ANNEX VII TYPICAL DESIGN OF THE DOLOK RIVER
18
ABBREVIATIONS
AMC Antecedent Soil Moisture Conditions
Badan Perencanaan Pembangunan Nasional (State Ministry of National
BAPPENAS
Development Planning)
BBWS Balail Besar Wilayah Sungai Pemali Juana
BCR Benefit Cost Ratio
BKT Banjir Kanal Timur (East Floodway)
BMKG Badan Meteorologi, Klimatologi dan Geofisika
CN Curve Number
D/D Detailed Design
DAS River Basin
DEM Digital Elevation Model
DLA Damages and Loss Assessment
DS Downstream
DSM Digital Surface Model
EIRR Economic Internal Rate of Return
GRDP Gross Regional Domestic Product
H-A-V Height - Area - Volume
HD Hydrodynamic
HHWS Highest High Water Spring
HWL High Water Level
IBRD The International Bank for Reconstruction and Development
IPCC Intergovernmental Panel on Climate Change
JICA Japan International Cooperation Agency
LARAP Land Acquisition and Resettlement Action Plan
LLWS Lowest Low Water Spring
MHWS Mean High Water Spring
MLWS Mean Low Water Spring
MSL Mean Sea Level
NPV Net Present Value
PAP People Affected by Project
PSDA Pengelolaan Sumber Daya Air
Rp. Rupiah
SCS The Soil Conservation Service
SRTM Shuttle Radar Topography Mission
STA Station
US Upstream
USDA The United States Department of Agriculture
UTM The Universal Transverse Mercator
WGS The World Geodetic System
19