You are on page 1of 1

3000

Papan Ulin 2/20

3000 Kayu Ulin 10/10


Lokasi Pengapuran
Melati Pond
1200

Papan Ulin 2/20

4000

6000

Kayu Ulin 10/10

Kayu Ulin 5/10


2929 Papan Ulin 2/20

850

4000 1200 3000

APPROVALS LEGEND : NAME DATE CLIENT PT KALTIM PRIMA COAL


Name Department Signature Date This material is copy and may not be ENG. DESIGN BY
PROJECT BENGALON COAL PROJECT
reproduced without permission".Information DRAWN BY
and know-how hereon are confidential and TITLE
CHECKED BY
N may not be used, or revealed to others except
in accord with the written permission of" PT APPROVED BY PONDOK PENGAPURAN MELATI
DARMA HENWA any reproduction in whole or
in part including shop drawings derived from
this material shall bear or refer to this stamp
SCALE DRAWING No.
REVISION
1:50
0
FILE :

You might also like