You are on page 1of 9

SHOP DRAWING

TRIGONAL TOWER 75 METER


INFRASTRUCTURE PROJECT
CIVIL ENGINEERING DEPARTMENT
PT MITRA TOWER UTAMA
PT. MITRA TOWER UTAMA
REMARK

ISOMETRI TRIGONAL TOWER


NON SCALE
REVISION
NO NOTE DATE SIGN
PROJECT: TRIGONAL TOWER 75 MTR
DRAWING TITLE : TAMPAK
NAME SIGN
User
Drawing By
Checked By
Approved By
Acknowlegded
LOCATION
Drawing No. Scale Sheet
PT. MITRA TOWER UTAMA
REMARK

TAMPAK TRIGONAL TOWER


5000

SCALE 1 : 250
15000
REVISION
NO NOTE DATE SIGN
PROJECT: TRIGONAL TOWER 75 MTR
DRAWING TITLE : TAMPAK

15000
NAME SIGN
User
Drawing By
Checked By

5000
Approved By
Acknowlegded
LOCATION
+75.00

+70.00

+65.00

+60.00

+55.00

+50.00

+45.00

+40.00

+35.00

+30.00

+25.00

+20.00

+15.00

+10.00

+5.00

- 0.00
+
SEGMENT10 SEGMENT11 SEGMENT12 SEGMENT13 SEGMENT14 SEGMENT15 SEGMENT 9 SEGMENT 8 SEGMENT 7 SEGMENT 6 SEGMENT 5 SEGMENT 4 SEGMENT 3 SEGMENT 2 SEGMENT 1
Drawing No. Scale Sheet
BESI SIKU L 30.30.3 BESI SIKU L 30.30.3 BESI SIKU L 30.30.3
BAUT + NUT M14 BAUT + NUT M14 BAUT + NUT M14
RING BOLT 14MM RING BOLT 14MM RING BOLT 14MM
500

500

500
500

500

500
5000

5000

5000
BESI REBAR BESI REBAR
22MM 19MM

BESI REBAR BESI REBAR


10MM 10MM BESI REBAR
16MM

BESI REBAR BESI REBAR BESI REBAR


16MM 12MM 10MM
500

500

500
500

500

500

BESI SIKU L 30.30.3 BESI SIKU L 30.30.3 BESI SIKU L 30.30.3

DETAIL SEGMEN ( 1-5 ) DETAIL SEGMEN ( 6-10 ) DETAIL SEGMEN ( 11-15 )


SCALE 1 : 25 SCALE 1 : 25 SCALE 1 : 25
Acknowlegded

Approved By

Checked By

Drawing By

User

DRAWING TITLE : TAMPAK

PROJECT: TRIGONAL TOWER 75 MTR

NO

PT. MITRA TOWER UTAMA


Drawing No.

NOTE

REVISION

REMARK
LOCATION
Scale

NAME

DATE
Sheet

SIGN

SIGN
PT. MITRA TOWER UTAMA
PS
REMARK
12000

PU : PONDASI UTAMA
PS : PONDASI SKOOR
PS
BK : BAK KONTROL
13000
REVISION
NO NOTE DATE SIGN
PROJECT: TRIGONAL TOWER 75 MTR

12

12


DRAWING TITLE : TAMPAK
PU
NAME SIGN

800
User
BK
0 13 Drawing By
00 120° 00
0
13
Checked By
Bapak Maryanto
Approved By
Acknowlegded
LOCATION
00 PS PS 12
0 00
12 0
PS PS
LAYOUT TRIGONAL TOWER
Drawing No. Scale Sheet
SCALE 1 : 150
PT. MITRA TOWER UTAMA
SLING 0 4MM ( GALVANISED )
CLAMP SLING ( 2 UNIT )
TURNBUCKEL 0 12MM
RING REBAR 0 8MM
KABEL NYAF 1X70MM
(GREEN YELLOW) REMARK
PIPA BESI GIP SCH 40 0 3" P=1 MTR
KABEL THIES JARAK 70CM
SCUN KABEL
TUTUP BAK KONTROL
BUSBAR 5X50X300
PAS.BATA
MUKA TANAH MUKA TANAH MUKA TANAH SCUN KABEL
EXOTHERMIC WELD
LANTAI KERJA 1:3:5 T=5 CM
PASIR URUG T=5 CM
KABEL BC 50MM
REVISION
KABEL BC 50MM GROUND ROOD 5/8 KEDALAMAN
KABEL NYAF 1X70MM
(TEGANGAN <50HM) 2 MTR NO NOTE DATE SIGN
GROUND ROD 5/8 KEDALAMAN GROUND ROD 5/8 KEDALAMAN (GREEN YELLOW)
(TEGANGAN <5ohm) (TEGANGAN <5ohm)
KABEL BC 50MM
DIBALUT PIPA PVC 0 3/4''
GROUND ROD GROUND ROD
BAK KONTROL
PROJECT: TRIGONAL TOWER 75 MTR
SLING 0 4MM ( GALVANISED )
PONDASI SKOOR CLAMP SLING ( 2 UNIT )
DRAWING TITLE : TAMPAK
TURNBUCKEL 0 12MM NAME SIGN
RING REBAR 0 8MM
User
Drawing By
GROUND ROD 5/8 KEDALAMAN Checked By
(TEGANGAN <5ohm)
PIPA BESI GIP SCH 40 0 3" P=1 MTR Approved By
KABEL BC 50MM
DIBALUT PIPA PVC 0 3/4''
Acknowlegded
LOCATION
GROUND ROD
MUKA TANAH
Drawing No. Scale Sheet
PONDASI SKOOR
PT. MITRA TOWER UTAMA
TANAH DASAR REMARK
COR BETON MENGGUNAKAN CAKAR AYAM MENGGUNAKAN
MUTU K: 225 BESI 0 10MM
TANAH DASAR CAKAR AYAM
MENGGUNAKAN
1500

BESI 0 10MM
COR BETON
MENGGUNAKAN
MUTU K:250
1500

TIANG PANCANG REVISION


ULIN 10/10 UK. 2 MTR
NO NOTE DATE SIGN
TIANG PANCANG ULIN 10/10
KEDALAMAN 2 MTR
600 PROJECT: TRIGONAL TOWER 75 MTR
100 100
800 DRAWING TITLE : TAMPAK
800
NAME SIGN
1000 800
PANCANG ULIN UK.10/10
400 400 KEDALAMAN 2 MTR
User
PANCANG ULIN UK.10/10
KEDALAMAN 9 MTR Drawing By

600
Checked By
200
100
Approved By

800
Acknowlegded

1000
DETAIL PONDASI ANGKUR
MENGGUNAKAN PANCANG ULIN 10/10 LOCATION

200
SCALE 1 : 25
DETAIL PONDASI TOWER
MENGGUNAKAN PANCANG ULIN
SCALE 1 : 25 NOTE : UNTUK PEKERJAAN PANCANG
BISA MENGGUNAKAN PANCANG ULIN 10/10 ATAU MENGGUNAKAN
PANCANG ULIN 10/10 KEDALAMAN 2 MTR
Drawing No. Scale Sheet
PT. MITRA TOWER UTAMA
COR BETON MENGGUNAKAN CAKAR AYAM MENGGUNAKAN
MUTU K: 225 BESI 0 10MM
TANAH DASAR
REMARK
TANAH DASAR
CAKAR AYAM
1500

MENGGUNAKAN
1500
BESI 0 10MM
COR BETON
MENGGUNAKAN
MUTU K:250
TIANG PANCANG MENGGUNAKAN
ULIN 10/10 KEDALAMAN 2 MTR
ISI COR BETON MUTU K: 225
REVISION
TIANG PANCANG MENGGUNAKAN
NO NOTE DATE SIGN
ULIN 10/10 KEDALAMAN 2 MTR
800
1000
PROJECT: TRIGONAL TOWER 75 MTR
TIANG PANCANG MENGGUNAKAN 600
ULIN 10/10 KEDALAMAN 2MTR
ISI COR BETON MUTU K: 225 DRAWING TITLE : TAMPAK
800
NAME SIGN
TIANG PANCANG MENGGUNAKAN
200
100 User
800
400 400
ULIN 10/10 KEDALAMAN 2 MTR
Drawing By

800
1000
Checked By

600
Approved By

200
Acknowlegded
LOCATION
DETAIL PONDASI TOWER
DETAIL PONDASI ANGKUR
SCALE 1 : 25
SCALE 1 : 25
NOTE : UNTUK PEKERJAAN PANCANG
BISA MENGGUNAKAN PANCANG ULIN 10/10 KEDALAMAN 2 MTR Sheet
Drawing No. Scale
PT. MITRA TOWER UTAMA
Spesifikasi Head Terminal Kurn Radius R85 Penangkal Petir Box Hitam ORIGINAL
KURN Air Terminal Lightning Conductor ( Bok Hitam-Original )
- Type R85 (Radius Proreksi 85 Meter)
- Berat 3kg
REMARK
- Diameter 3 inci
- Panjang 45cm
- Sertificate LMK-PlN Indonesia
- Produksi Indonesia
BESI REBAR 0 16MM - Garansi 1 Tahun
Kelengkapan Penangkal Petir KURN R85
SEGMEN 10

- 1 Air Terminal Kurn Radius 60-80 meter


- 1 buku panduan
- 1 Tube Conecting Slive
- 4 buah sirip
- 1 Kunci L
BAUT + NUT M14
BESI SIKU L 30.30.3
TIANG PIPA GIP SCH 40 DIA 2.5"
T:5.2MM DIBALUT PIPA PVC 0 2.5" REVISION
NO NOTE DATE SIGN
RING BOLT 0 14 MM
BESI REBAR 0 19MM
CLAMP SLING
PROJECT: TRIGONAL TOWER 70 MTR
SLING 0 6MM DRAWING TITLE : TAMPAK
( GALVANIZED )
NAME SIGN
KABEL NYA 1X70MM
SEGMEN 9

User
DI BALUT PIPA PVC 1"
Drawing By
Checked By
Approved By
Acknowlegded
PIPA PVC 0 1"
LOCATION
TRUNBUCKEL 0 10MM
DETAIL PENANGKAL PETIR
SCALE 1 : 20
DETAIL SAMBUNGAN SEGMEN ( 9 & 10 )
SCALE 1 : 20
Drawing No. Scale Sheet

You might also like