You are on page 1of 1

Work Schedule

Name of the Work : Road Upgradation Works of Mechi RajmargaMukti Turning-Sasastra Base camp -New Buspark, Phunglinh Na Pa , Taplejung
Location : Phungling Municipality, Taplejung
Contract No ::PUDBC/Jhapa/NCB/WORKS/32/.078/79

Baisakh
Chaitra
Falgun
Magh
S No. Description Remarks

1 Provisional sum 5th -15th 15th-25th 25th-30th 1-10th 10th-20th 20th-30th 1-10th 10th-20th 20th-30th 1-10th 10th-20th 20th-30th
1 (A)Insurance premium for the work, plant and
materials damage for contract work for all risk
including Riot,Strike, Damage,Malicious damage and
Terrorism for contract work of for 1.year + 1 year
Maintenance period.(B)Insurance Premium for
construction equipments and machines with value of
Rs. 5,00,000.00 for 1 year(C)Insurance Premium for
property except the works , plants, Materials and
equipment in connection with contract with Value of
Rs. 10,00,000 for 1 year.(D)Insurance premium for the
insurance of employes Staff ( 4 Nos ) and Contractor's
staff (3 Nos ) and others Rs. 10,00,000.00 per person
for Unnamed 10 persons with unlimited number of
occurances for 3 Months
2
Lab tests
3
Display board
2 Civil work
1 Earthwork excavation in all types of soil including
shoring, struting, bracing, sheeting and disposal all
complete as per specification.
2 Back filling behind the structures as per Drawing and
Technical Specifications., Locally available Material,
with out watering But compaction by tamping rod
3 Specification : Granular Material
4 Providing and Laying of Dry Stone Soling for foundation
works of drain and road all complete works as
mentioned in specification and directed by the
Engineer
5 Providing and placing cement concrete M10 (1:3:6) for
the foundation and footing etc. including compaction,
curing, testing and lead 30m. etc. all complete as per
specification and drawing.
6 Providing and placing cement concrete M15 (1:2:4) for
the foundation and footing etc. including compaction,
curing, testing and lead 30m. etc. all complete as per
specification and drawing.
7 Providing, preparing and installing formwork (F1
Finish)for foundation and footings including necessary
supports and removing after completion all complete.
8 Providing and laying random rubble stone masonry of
hard stone in 1 : 6 cement sand mortar including stone
dressing,mortar transportation all complete (Manual
mixing)
9 Providing mechanically woven double twisted crates /
mattress , Hexagonal mesh type 100 mm x 120 mm,
mesh wire 3 mm, selvage wire 3.9 mm, lacing wire 2.4
mmincluding rolling, cutting and with lacing wire and
binding wire,supply and filling of boulders,etc all
complete as per specification[Spec. Cl. No.:2402]
10 Laying Geotextile
11 Engineers Instruction

Submitted By:- Kanchanjungha Nirman Sewa

You might also like