ASSIGNMENT 2

MUHAMAD REDZUAN BIN JUSRI


08DPB20F1020

Answer ALL questions.

Identify FIVE (5) purpose of quantity measurement

- Estimate the cold water and hot water


system
- Estimate the waste pipe system
- Estimate the disposal pipe and vent pipe
- Estimate the electrical supply system (the
electrical point only)

1. i) List the main purpose of using S.M.M in preparing bill of quantities.

A comprehensive examination on the function of the SMM indicate that the rules of
measurement drafted in SMMs are used for the purpose of producing a good standard
procurement document (BQ) by obtaining a tender price for the project, and producing
cost estimates or cost plans

ii) Based on Figure 1: Dimension Paper, translate the usage of space (1,2,3 & 4)
provided in the dimension paper.

First column – Timesing column (for entering multiplication factors or constants)

Second column – Dimension column

Third column – Squaring column (also known as the summation column)

Fourth column – Description column (For item descriptions and waste calculations)

2. You are appointed as a Quantity Surveyor for Mr Azerbaijan electrical system


installation project. Prepare a taking off list for the electrical system based on
Figure 2: Electrical System (point only).

Item Unit Quantity


Celling mounted light No 8
Recessed down light No 4
Emergency light No 2
Duplex receptable outlet No 6
Nurse call No 4
Telephone outlet No 4
Tv outlet No 2
Smoke detector No 2
Switch No 8
3. Explain FIVE (5) purpose of preparing a quantity take off on contractor perspective.

- Pricing different work items.


- Identifying the needed resources (Labour, Equipment, etc.).
- Project schedule.
- Preparing invoices for work done.
- Subcontractors’ payments.

4. Prepare a taking off list for hot water supply system.

ITEM UNIT QUANTITY


Gate valve No 3
Wash basin No 5
sink No 1
pipe m 14
Tee fitting No 5
Elbow fitting No 3
reducer No 1

5. Produce a bill of quantity (without materials price) for the hot water system in Figure
3: Hot water system schematic plan.

item Description QTY Unit Rate Amount


TAP AND VALVE

A Gate valve 3 No

SANITARY APPLIANCE

A Wash basin 5 Nos


B Sink 1 Nos

PIPE

A 1m diameter pipe 9 m
B 1.8m diameter pipe 1 m
C 1.6 diameter pipe 1 m
D 2.0m diameter pipe 1 m
E 4.5m diameter pipe 1 m
F 7.9m diameter pipe 1 m

FITTTING

A Tee 5 Nos
B Elbow 3 Nos
C Reducer 1 Nos