Example(1)
Area A:
𝑃𝑙𝑜𝑎𝑑 = 700 𝑀𝑊
-------------------------------------------------------
-------------------------------------------------------
𝑑𝐹1
= 15.84 + 2 ∗ 0.003124𝑃1 = 𝜆
𝑑𝑃1
𝑑𝐹2
= 15.7 + 2 ∗ 0.00388𝑃2 = 𝜆
𝑑𝑃2
𝑑𝐹3
= 15.94 + 2 ∗ 0.00964𝑃3 = 𝜆
𝑑𝑃3
𝑃1 + 𝑃2 + 𝑃3 = 700
𝝀 = 𝟏𝟕. 𝟖𝟓𝟔
𝑷𝟏 = 𝟑𝟐𝟐. 𝟕 𝑴𝑾
𝑷𝟐 = 𝟐𝟕𝟕. 𝟗 𝑴𝑾
𝑷𝟑 = 𝟗𝟗. 𝟒 𝑴𝑾
Area B:
𝑃𝑙𝑜𝑎𝑑 = 1100 𝑀𝑊
-------------------------------------------------------
-------------------------------------------------------
𝑑𝐹1
= 13.41 + 2 ∗ 0.002641𝑃1 = 𝜆
𝑑𝑃1
𝑑𝐹2
= 14.17 + 2 ∗ 0.003496𝑃2 = 𝜆
𝑑𝑃2
𝑑𝐹3
= 14.17 + 2 ∗ 0.003496𝑃3 = 𝜆
𝑑𝑃3
𝑃1 + 𝑃2 + 𝑃3 = 1100
𝜆 − 13.41 𝜆 − 14.17 𝜆 − 14.17
+ + = 1100
2 ∗ 0.002641 2 ∗ 0.003496 2 ∗ 0.003496
𝝀 = 𝟏𝟔. 𝟏𝟖𝟏
𝑷𝟏 = 𝟓𝟐𝟒. 𝟕 𝑴𝑾
𝑷𝟐 = 𝟐𝟖𝟕. 𝟕 𝑴𝑾
𝑷𝟑 = 𝟐𝟖𝟕. 𝟕 𝑴𝑾
𝑃1 + 𝑃2 + 𝑃3 + 𝑃4 + 𝑃5 + 𝑃6 = 1800
𝝀 = 𝟏𝟔. 𝟗𝟗
𝑷𝟏 = 𝟏𝟖𝟒 𝑴𝑾
𝑷𝟐 = 𝟏𝟔𝟔. 𝟐𝟑 𝑴𝑾
𝑷𝟑 = 𝟓𝟒. 𝟒𝟔 𝑴𝑾
𝑷𝟒 = 𝟓𝟗𝟎 𝑴𝑾
𝑷𝟓 = 𝟒𝟎𝟑 𝑴𝑾
𝑷𝟔 = 𝟒𝟎𝟑 𝑴𝑾
savings: 5,146.28
conclusions:
area A can argue that area B had a net operating cost increase of 4884.66 and therefore area
A ought to pay area B this cost area B can argue that area A had a net decrease in operating
cost of 5146.28 and therefore area A ought to pay area B this savings
EXAMPLE(2):
rework the first example by carrying out the steps for incremental cost comparison
between the two utilities
AREA A:
𝑃1 + 𝑃2 + 𝑃3 = 700
𝝀 = 𝟏𝟕. 𝟖𝟓𝟔
-------------------------------------------------------------
𝑃1 + 𝑃2 + 𝑃3 = 650
𝝀 = 𝟏𝟕. 𝟕𝟏𝟎
𝑷𝟏 = 𝟐𝟗𝟗. 𝟐𝟓 𝑴𝑾
𝑷𝟐 = 𝟐𝟓𝟗 𝑴𝑾
𝑷𝟑 = 𝟗𝟏. 𝟖 𝑴𝑾
STEP 3 WHEN 600 MW:
𝑃1 + 𝑃2 + 𝑃3 = 600
𝝀 = 𝟏𝟕. 𝟓𝟔𝟑
𝑷𝟏 = 𝟐𝟕𝟓. 𝟕𝟖 𝑴𝑾
𝑷𝟐 = 𝟐𝟒𝟎 𝑴𝑾
𝑷𝟑 = 𝟖𝟒. 𝟐𝟐 𝑴𝑾
-------------------------------------------------------------
𝑃1 + 𝑃2 + 𝑃3 = 550
𝝀 = 𝟏𝟕. 𝟒𝟏𝟔
𝑷𝟏 = 𝟐𝟓𝟐. 𝟐𝟓 𝑴𝑾
𝑷𝟐 = 𝟐𝟐𝟏. 𝟑 𝑴𝑾
𝑷𝟑 = 𝟕𝟔. 𝟓𝟓 𝑴𝑾
-------------------------------------------------------------
𝑃1 + 𝑃2 + 𝑃3 = 500
𝝀 = 𝟏𝟕. 𝟐𝟕
𝑷𝟏 = 𝟐𝟐𝟖. 𝟖𝟕 𝑴𝑾
𝑷𝟐 = 𝟐𝟎𝟐. 𝟑𝟏 𝑴𝑾
𝑷𝟑 = 𝟔𝟖 𝑴𝑾
STEP 6 WHEN 450 MW:
𝑃1 + 𝑃2 + 𝑃3 = 450
𝝀 = 𝟏𝟕. 𝟏𝟐𝟑
𝑷𝟏 = 𝟐𝟎𝟓. 𝟑𝟒 𝑴𝑾
𝑷𝟐 = 𝟏𝟖𝟑. 𝟑𝟕 𝑴𝑾
𝑷𝟑 = 𝟔𝟏. 𝟑𝟓 𝑴𝑾
-------------------------------------------------------------
𝑃1 + 𝑃2 + 𝑃3 = 400
𝝀 = 𝟏𝟕. 𝟗𝟕𝟔
𝑷𝟏 = 𝟏𝟖𝟏. 𝟖𝟏 𝑴𝑾
𝑷𝟐 = 𝟏𝟔𝟒. 𝟒𝟑 𝑴𝑾
𝑷𝟑 = 𝟓𝟑. 𝟕𝟑 𝑴𝑾
-------------------------------------------------------------
𝑃1 + 𝑃2 + 𝑃3 = 650
𝝀 = 𝟏𝟕. 𝟖𝟐𝟗
𝑷𝟏 = 𝟏𝟓𝟖. 𝟑𝟔 𝑴𝑾
𝑷𝟐 = 𝟏𝟒𝟓. 𝟒𝟖 𝑴𝑾
𝑷𝟑 = 𝟒𝟔. 𝟏𝑴𝑾
AREA B:
𝑃4 + 𝑃5 + 𝑃6 = 1100
𝝀 = 𝟏𝟔. 𝟏𝟖𝟏
𝑷𝟒 = 𝟓𝟐𝟒. 𝟕 𝑴𝑾
𝑷𝟓 = 𝟐𝟖𝟕. 𝟕 𝑴𝑾
𝑷𝟔 = 𝟐𝟖𝟕. 𝟕 𝑴𝑾
-----------------------------------------------------------------
𝑃4 + 𝑃5 + 𝑃6 = 1150
𝝀 = 𝟏𝟔. 𝟐𝟗𝟏
𝑷𝟒 = 𝟓𝟒𝟓. 𝟒𝟑 𝑴𝑾
𝑷𝟓 = 𝟑𝟎𝟑. 𝟑𝟒 𝑴𝑾
𝑷𝟔 = 𝟑𝟎𝟑. 𝟑𝟒 𝑴𝑾
-----------------------------------------------------------------
𝑃4 + 𝑃5 + 𝑃6 = 1200
𝝀 = 𝟏𝟔. 𝟑𝟗𝟓
𝑷𝟒 = 𝟓𝟔𝟓. 𝟏𝟐 𝑴𝑾
𝑷𝟓 = 𝟑𝟏𝟖. 𝟐𝟐 𝑴𝑾
𝑷𝟔 = 𝟑𝟏𝟖. 𝟐𝟐 𝑴𝑾
STEP 4 WHEN 1250 MW:
𝑃4 + 𝑃5 + 𝑃6 = 1250
𝝀 = 𝟏𝟔. 𝟒𝟗𝟕
𝑷𝟒 = 𝟓𝟖𝟒. 𝟒𝟏 𝑴𝑾
𝑷𝟓 = 𝟑𝟑𝟐. 𝟕𝟗 𝑴𝑾
𝑷𝟔 = 𝟑𝟑𝟐. 𝟕𝟗 𝑴𝑾
-----------------------------------------------------------------
𝑃4 + 𝑃5 + 𝑃6 = 1300
𝝀 = 𝟏𝟔. 𝟔𝟓𝟔
𝑷𝟒 = 𝟔𝟎𝟒. 𝟑𝟑 𝑴𝑾
𝑷𝟓 = 𝟑𝟒𝟕. 𝟖𝟐𝟔 𝑴𝑾
𝑷𝟔 = 𝟑𝟒𝟕. 𝟖𝟔𝟐 𝑴𝑾
-----------------------------------------------------------------
𝑃4 + 𝑃5 + 𝑃6 = 1350
𝝀 = 𝟏𝟔. 𝟖𝟑𝟏
𝑷𝟒 = 𝟔𝟐𝟒. 𝟏𝟗 𝑴𝑾
𝑷𝟓 = 𝟑𝟔𝟐. 𝟖𝟒 𝑴𝑾
𝑷𝟔 = 𝟑𝟔𝟐. 𝟖𝟒 𝑴𝑾
STEP 7 WHEN 1400 MW:
𝑃4 + 𝑃5 + 𝑃6 = 1400
𝝀 = 𝟏𝟕. 𝟎𝟎𝟔
𝑷𝟒 = 𝟔𝟒𝟒. 𝟎𝟕𝟗 𝑴𝑾
𝑷𝟓 = 𝟑𝟕𝟕. 𝟖𝟔 𝑴𝑾
𝑷𝟔 = 𝟑𝟕𝟕. 𝟖𝟔 𝑴𝑾
----------------------------------------------
𝑃4 + 𝑃5 + 𝑃6 = 1450
𝝀 = 𝟏𝟕. 𝟏𝟖𝟏
𝑷𝟒 = 𝟔𝟔𝟐. 𝟔 𝑴𝑾
𝑷𝟓 = 𝟑𝟗𝟏. 𝟖𝟕 𝑴𝑾
𝑷𝟔 = 𝟑𝟗𝟏. 𝟖𝟕 𝑴𝑾
note that at step 6, area A’s incremental cost is just slightly above area B’s
incremental cost, and that this relationship changes at step 7
for minimum operating cost, the two systems ought to be interchanging power
between 250 MW and 300 MW the procedure can then be repeated with smaller steps
between 250 and 300 MW as needed
EXAMPLE(3):
data for utility areas A & B are the same as in previous examples
𝑃1 + 𝑃2 + 𝑃3 = 400
𝝀 = 𝟏𝟕. 𝟗𝟕𝟔
𝑷𝟏 = 𝟏𝟖𝟏. 𝟖𝟏 𝑴𝑾
𝑷𝟐 = 𝟏𝟔𝟒. 𝟒𝟑 𝑴𝑾
𝑷𝟑 = 𝟓𝟑. 𝟕𝟑 𝑴𝑾
𝑃1 + 𝑃2 + 𝑃3 = 500
𝝀 = 𝟏𝟕. 𝟐𝟕
𝑷𝟏 = 𝟐𝟐𝟖. 𝟖𝟕 𝑴𝑾
𝑷𝟐 = 𝟐𝟎𝟐. 𝟑𝟏 𝑴𝑾
𝑷𝟑 = 𝟔𝟖 𝑴𝑾
Agreement A:
Saves area A =13677.2-845.27=5225 $/h
Agreement B:
Saves area C =1822 $/h
-------------------------------------------
Agreement B:
Saves area C =1822 $/h
-------------------------------------------