This document lists 14 positions for an oil and gas development project. For each position, it provides the location, area of focus (e.g. FPSO, SUBSEA), and criteria that candidates must meet. Specifically, it requires that candidates have 7 years of offshore oil and gas experience, including 3 years working on deepwater projects over 400 meters deep, as of May 2019. The positions are located across India and Singapore and cover a range of roles from management to engineering to procurement.
This document lists 14 positions for an oil and gas development project. For each position, it provides the location, area of focus (e.g. FPSO, SUBSEA), and criteria that candidates must meet. Specifically, it requires that candidates have 7 years of offshore oil and gas experience, including 3 years working on deepwater projects over 400 meters deep, as of May 2019. The positions are located across India and Singapore and cover a range of roles from management to engineering to procurement.
This document lists 14 positions for an oil and gas development project. For each position, it provides the location, area of focus (e.g. FPSO, SUBSEA), and criteria that candidates must meet. Specifically, it requires that candidates have 7 years of offshore oil and gas experience, including 3 years working on deepwater projects over 400 meters deep, as of May 2019. The positions are located across India and Singapore and cover a range of roles from management to engineering to procurement.
No. n 22 Years of offshore oil and gas field Risk & Control development project of which 15 Years in 1 Kakinada FPSO & SUBSEA Manager the Deepwater project above 400+ Meters in the proposed position as of May 2019.
Technical Risk & 7 Years of offshore oil and gas field
Reliability Kakinada\ development project of which 3 Years in 2 FPSO & SUBSEA Engineer /Process Bangalore the Deepwater project above 400+ Meters Safety Engineer in the proposed position as of May 2019.
7 Years of offshore oil and gas field
Lead - Marine development project of which 3 Years in 3 Singapore FPSO Survey the Deepwater project above 400+ Meters in the proposed position as of May 2019.
Lead Start-up &
7 Years of offshore oil and gas field Operation / Lead development project of which 3 Years in 4 Commisioning / Kakinada FPSO the Deepwater project above 400+ Meters Production in the proposed position as of May 2019. Supervisor
7 Years of offshore oil and gas field
development project of which 3 Years in 5 Lead Procurement Kakinada SUBSEA the Deepwater project above 400+ Meters in the proposed position as of May 2019.
7 Years of offshore oil and gas field
Kattupalli Site Manager development project of which 3 Years in 6 - L&T SUBSEA SPS/SURF the Deepwater project above 400+ Meters Yard in the proposed position as of May 2019.
Review & approval of A/V., 3D immersive
collaboration system specifications. – AV IT AV\ Expert 7 Teleconference Consultant IT Network Review & approval of Teleconferencing system specifications. - – IT Architect – HW/ SW 7 Years of onshore oil and gas field Onshore Terminal development project of which 3 Years in 8 Kakinada Onshore Site Manager the Gas Processing Terminal in the proposed position as of May 2019.
6 Years of offshore oil and gas field
Lead Mechanical - development project of which 2 Years in 9 Bangalore FPSO Static Engineer the Deepwater project above 400+ Meters in the proposed position as of May 2019.
6 Years of offshore oil and gas field
Engineer 3-D development project of which 2 Years in 10 Bangalore FPSO Modeling the Deepwater project above 400+ Meters in the proposed position as of May 2019.
7 Years of offshore oil and gas field
Lead Planning - development project of which 3 Years in 11 Kakinada SUBSEA & FPSO SURF & SPS the Deepwater project above 400+ Meters in the proposed position as of May 2019.
6 Years of offshore oil and gas field
Interface Engineer development project of which 2 Years in 12 Kakinada SUBSEA Sub-sea the Deepwater project above 400+ Meters in the proposed position as of May 2019.
6 Years of offshore oil and gas field
Piping Engineer - development project of which 2 Years in 13 Bangalore FPSO FPSO the Deepwater project above 400+ Meters in the proposed position as of May 2019.
6 Years of offshore oil and gas field
Flow Assurance & Bangalore development project of which 2 Years in 14 Operations SUBSEA \ Kakinada the Deepwater project above 400+ Meters Specialist in the proposed position as of May 2019.