Item Size Unit Rate for

no. 2013-14
6.00 mt to 7.50 mt depth
a) Cu.M. 111.00
b) " 164.00
c) " 199.00
d) " 407.00
e) " 877.00

Item no.16
Excavation for P/L trenches beyond 7.5m
For every extra additional depth of 1.5 m or part thereof beyond 7.5 m depth
a) Cu.M. 28.00
b) " 40.00
c) " 49.00
d) " 51.00
e) " 117.00

Item no.17
Extra for dewatering upto 1.5 mt. depth from G. L. for all Strata

a) For all Strata (Per Cum of Excavated stuff) Cu.M. 17.00

Extra for dewatering in all sorts of strata’s, for each 1.5 mt. or part thereof beyond 1.5 mt. depth.
Cu.M. 10.00
Item no.18
Providing bedding incl. ramming, watering, consolidating etc. complete.

A From selected excavated earth. Cum 57.00


B Murrum brought from outside lead upto 2 km. Cum 172.00
C Murrum 2 to 15 km. Cum 233.00
D Murrum 15 to 50 km. Cum 342.00
E filling in trench with available sand within 2 Km Cum 328.00
F Sand 2 to 15 km. Cum 396.00
G Sand 15 to 50 km. Cum 505.00

Item no. 19
Refilling of pipeline trenches
Refilling the pipeline trenches incl. ramming, watering, consolidating desposal of surplus stuff as directed
within a radius of 3 km.
1 surplus stuff up to 3 Km Cum 22.00
2 selected soil brought from Outside Above 3 Km up 5 Km Cum 172.00