no. 2013-14
6.00 mt to 7.50 mt depth
a) Cu.M. 111.00
b) " 164.00
c) " 199.00
d) " 407.00
e) " 877.00
Item no.16
Excavation for P/L trenches beyond 7.5m
For every extra additional depth of 1.5 m or part thereof beyond 7.5 m depth
a) Cu.M. 28.00
b) " 40.00
c) " 49.00
d) " 51.00
e) " 117.00
Item no.17
Extra for dewatering upto 1.5 mt. depth from G. L. for all Strata
Extra for dewatering in all sorts of strata’s, for each 1.5 mt. or part thereof beyond 1.5 mt. depth.
Cu.M. 10.00
Item no.18
Providing bedding incl. ramming, watering, consolidating etc. complete.
Item no. 19
Refilling of pipeline trenches
Refilling the pipeline trenches incl. ramming, watering, consolidating desposal of surplus stuff as directed
within a radius of 3 km.
1 surplus stuff up to 3 Km Cum 22.00
2 selected soil brought from Outside Above 3 Km up 5 Km Cum 172.00