BoQ-1 (RUIDP SoR 2017 )

Sl. No. Sor Ref Item Description Units RUIDP SoR


2017 Rate
1 2 3 5 6
Earth work for Sewer line and Manhole in excavation in
foundation, trenches, manholes, road side chambers
etc. including dressing of sides and ramming of bottoms,
including getting out the excavated material, refilling
after laying pipe/ foundation and disposal of surplus
excavated material at a lead upto 50m suitable site as
1 17.1 per direction of Engineer for following depths, below
natural ground / Road top level including allowances for
any additional excavation beyond the Standard
drawings (measurement for payment to be as per
standard drawings), re-handling of material / earth to
complete the task.
In all types soils such as\ moorum, sand, sandy silt, clay,
17.1.1 black cotton soil, kankar, etc.
17.1.1.1 Depth upto 1.5 m Cum 197.00
17.1.1.2 over all depth of excavation above 1.5 m and upto 3.0 m Cum 14.00
17.1.1.3 over all depth of excavation above 3.0 m and upto 4.5 m Cum 31.50
17.1.1.4 over all depth of excavation above 4.5 m and upto 6.0 m Cum 55.00
Add extra for over all depth of excavation above 6.0 m
17.1.1.5 and upto 7.5 m over item no 17.1.4.1 Cum 84.50
Add extra for over all depth of excavation above 7.5 m
17.1.1.6 and upto 9.0 m over item no 17.1.4.1 Cum 118.00
Add extra over item no 1.01, 1.06 and 1.11 for
excavation in saturated soil, silt, rock and sludge where
2 17.2 pumping or bailing out of water including well point if
required for sewer line and manhole.
17.2.1 Excavation depth from ground level 0.0 to 9.0 m
Excavation from Encountered depth of Water table 0.0
17.2.1.1 to 1.5 m Cum 35.55

Excavation from Encountered depth of Water table 1.5


17.2.1.2 to 3.0 m Cum 71.10

Excavation from Encountered depth of Water table 3.0


17.2.1.3 to 4.5 m Cum 142.20

Excavation from Encountered depth of Water table 4.5


17.2.1.4 to 6.0 m Cum 212.40

Excavation from Encountered depth of water table 6.0


17.2.1.5 to 7.5 m Cum 315.00
Excavation from Encountered depth of water table 7.5
17.2.1.6 to 9.0 m Cum 630.00
Providing and fixing CLOSE timbering in trenches of
sewer line and manholes including strutting, shoring and
3 17.3 packing cavities (wherever required) complete.
(Measurements to be taken of the face area timbered)
for following depth below NGL.
Depth upto 3.0 m
17.3.1 Sqm 125.00

17.3.2 Depth more than 3.0 m and upto 6.0 m Sqm 126.00
Extra for planking, strutting and packing material for
cavities IN CLOSE TIMBERING of sewer line and
4 17.4 manholes if required to be left permanently in position Sqm 1020.00
BoQ-1 (RUIDP SoR 2017 )
Sl. No. Sor Ref Item Description Units RUIDP SoR
2017 Rate
(face area of timber permanently left to be measured)

Providing and fixing OPEN timbering in trenches of


sewer line and manholes including strutting, shoring and
5 17.5 packing cavities (wherever required) complete for
following depth below NGL.
Depth upto 3.0 m
17.5.1 Sqm 64.00
Depth more than 3.0 m and upto 6.0 m
17.5.2 Sqm 64.50
Extra for planking, strutting and packing material for
cavities IN OPEN TIMBERING of sewer line and
6 17.6 manholes if required to be left permanently in position Sqm 430.00
(face area of timber permanently left to be measured)

Providing at site, lowering & laying in trenches, aligning


& jointing of RCC pipes NP3 class (with s/s ends) IS:
458 - 1988 (amended up to date) marked and pipes from
300 mm upto 2000 mm manufactured through vertical
casting process all levels with Rubber gaskets
7 17.19 (EPDM/SBR) for sewer lines as per IS: 5382 (including
cost of Rubber gaskets lubricants) as per drawing,
sectional hydro testing of the sewer pipe line (including
cost and conveyance of water to site for testing) etc.,
complete as directed by Engineer.
Note : E/w to be measured and paid separately
17.19.2 200 mm internal diameter metre 521.00
17.19.3 250 mm internal diameter metre 732.00
17.19.4 300 mm internal diameter metre 1010.00
17.19.5 350 mm internal diameter metre 1510.00
400 mm internal diameter
17.19.6 metre 1740.00
450 mm internal diameter
17.19.7 metre 2120.00
600 mm internal diameter
17.19.9 metre 3230.00

Add extra for manufacturing of RCC pipe with Sulphate


8 17.21 Resistant Cement instead of OPC/PPC cement : NP3
Pipes
17.21.2.2 200 mm internal diameter metre 12.00
17.21.2.3 250 mm internal diameter metre 14.50
17.21.2.4 300 mm internal diameter metre 23.50
17.21.2.5 350 mm internal diameter metre 54.50
17.21.2.6 400 mm internal diameter metre 61.00
17.21.2.7 450 mm internal diameter metre 67.50
17.21.2.9 600 mm internal diameter metre 99.50
BoQ-1 (RUIDP SoR 2017 )
Sl. No. Sor Ref Item Description Units RUIDP SoR
2017 Rate
Providing and laying plain cement concrete M15 grade
(using mechanical concrete mixer) using 20mm graded
hard crusher broken stone aggregate, laying in layers of
not more than 15cm thick, for bedding having width =
outer dia of pipe (Bc) + 200mm or 1.25Bc (whichever is
9 17.30 higher), thickness below pipe = 0.25Bc or 100mm
(whichever is higher) and haunching = 0.25Bc, for all
type of pipes of following sizes, including compaction,
curing, form work, etc complete as per standard drawing
and/ or as directed by Engineer.

17.30.2 200 mm internal diameter metre 270.00


17.30.3 250 mm internal diameter metre 313.00
17.30.4 300 mm internal diameter metre 377.00
17.30.5 350 mm internal diameter metre 567.00
17.30.6 400 mm internal diameter metre 663.00
17.30.7 450 mm internal diameter metre 767.00
17.30.9 600 mm internal diameter metre 1170.00
Providing at site, lowering, laying, aligning, fixing in
position and
jointing in trenches at all level/ depths, ISI marked
following class AC (Mazza process) pipes for sewer and
drainage application as per IS 6908-1991 (amended upto
date) with AC coupler joints sealed with Rubber gaskets
17.23
(EPDM/SBR) as per IS 5382 complete including cost of all
materials, labour, jointing, water, sectional hydro testing
(including cost and conveyance of water to site for testing)
etc. and commissioning as per Technical Specifications
and as per direction of Engineer.
Note : E/w to be measured and paid separately.
17.23.1 Class-1
17.23.1.1 150mm Nominal dia 435
17.23.1.2 200 mm Nominal dia 665
17.23.1.3 250 mm Nominal dia 855
17.23.1.4 300 mm Nominal Dia 1100
17.23.1.5 350 mm Nominal Dia 1380
17.23.1.6 400 mm Nominal Dia 1690
17.23.1.7 450 mm Nominal Dia 2000
17.23.1.8 500 mm Nominal Dia 2500
600 mm Nominal Dia
17.23.1.9 3520
17.23.1.10 700 mm Nominal Dia 5550
17.23.1.11 800 mm Nominal Dia 7170
17.23.1.12 900 mm Nominal Dia 9110
17.23.1.13 1000 mm Nominal Dia 11100
BoQ-1 (RUIDP SoR 2017 )
Sl. No. Sor Ref Item Description Units RUIDP SoR
2017 Rate
Providing, fixing and constructing of pre-cast RCC M-40
grade circular manholes with internal dia 1.0m and up to
specified depth having pre-cast RCC M-40 grade
circular manhole cover frame (ID 0.56m, OD 0.86m,
height 0.20m), conical piece (top ID 0.56m, bottom ID
1.0m, vertical height 0.605m, wall thickness 125mm),
and circular rings of required heights (ID 1.0m, height
150 / 300 mm, wall thickness 125mm) below conical
piece as per required depth of manhole and having steel
reinforcement in all pieces of manhole @ not less than
80 kg per cum of concrete, including cast-in-situ PCC M-
10 grade (1:3:6) foundation of 1.625m dia and 150mm
10 17.55 thickness, PCC M15 grade circular wall ID 0.925m, wall
thickness 200mm, height equal to OD of sewer pipe +
50 mm, PCC M15 grade benching and channel portion
and up to top level of sewer pipe etc complete with
curing compaction and form work, supplying and fixing
heavy duty SFRC manhole cover as per IS 12592 (Part
I and II), supplying and fixing plastic encapsulated
CI/MS foot steps, including cost of shuttering, steel
reinforcement, testing for water tightness etc complete
in all respect as per drawing, as per specification and
the direction of the Engineer.
Note:- Excavation of earth work and road cutting for
manhole will be measured and paid separately.
Pre-cast RCC M-40 grade circular manholes 1.055 m
deep to invert with pre-cast manhole cover frame (height
0.20), conical piece (height 0.605), cast-in-situ PCC M-
17.55.1 10 grade foundation, PCC M15 grade circular wall ID each 10980.00
0.925m, wall thickness 200mm height equal to OD of
sewer pipe + 50mm, PCC M15 grade benching and
channel portion.
Providing and fixing pre-cast RCC M-40 grade circular
ring of ID 1.0m, wall thickness 125mm, height 150 / 300
17.55.2 mm for constructing extra depth of manhole for depth Mtr. 5544.00
beyond 1.055m as per drawing
BoQ-1 (RUIDP SoR 2017 )
Sl. No. Sor Ref Item Description Units RUIDP SoR
2017 Rate
Providing, fixing and constructing of pre-cast RCC M-40
grade circular manholes with internal dia 1.2m and up to
specified depth having pre-cast RCC M-40 grade
circular manhole cover frame (ID 0.56m, OD 0.86m,
height 0.20m), conical piece (top ID 0.56m, bottom ID
1.2m, vertical height 0.805m, wall thickness 125mm),
and circular rings of required heights (ID 1.2m, height
150/ 300/ 600/ 900mm, wall thickness 125mm) below
conical piece as per required depth of manhole and
having steel reinforcement in all pieces of manhole @
not less than 80 kg per cum of concrete, including cast-
in-situ PCC M-10 grade (1:3:6) foundation of 1.825m dia
11 17.56 and 150mm thickness, PCC M15 grade circular wall ID
1.125m, wall thickness 200mm, height equal to OD of
sewer pipe +50mm, PCC M15 grade benching and
channel portion and up to top level of sewer pipe etc
complete with curing compaction and form work,
supplying and fixing heavy duty SFRC manhole cover
as per IS 12592 (Part I and II), supplying and fixing
plastic encapsulated CI/MS foot steps, including cost of
shuttering, steel reinforcement, testing for water
tightness etc complete in all respect as per drawing, as
per specification and the direction of the Engineer.
Note:- Excavation of earth work and road cutting for
manhole will be measured and paid separately.
Pre-cast RCC M-40 grade circular manholes 1.255 m
deep to invert with pre-cast manhole cover frame (height
0.20), conical piece (height 0.805), cast-in-situ PCC M-
10 grade foundation, PCC M15 grade circular wall ID
17.56.1 1.125m, wall thickness 200mm height equal to OD of
each 13770.00
sewer pipe +50 mm, PCC M15 grade benching and
channel portion.

Providing and fixing pre-cast RCC M-40 grade circular


ring of ID 1.2m, wall thickness 125mm, height 150
17.56.2 /300/600/900mm for constructing extra depth of Mtr. 6219.00
manhole for depth beyond 1.255m as per drawing.
BoQ-1 (RUIDP SoR 2017 )
Sl. No. Sor Ref Item Description Units RUIDP SoR
2017 Rate
Providing, fixing and constructing of pre-cast RCC M-40
grade circular manholes with internal dia 1.5m and up to
specified depth having pre-cast RCC M-40 grade
circular manhole cover frame (ID 0.56m, OD 0.86m,
height 0.20m), conical piece (top ID 0.56m, bottom ID
1.5m, vertical height 1.105m, wall thickness 125mm),
and circular rings of required heights (ID 1.5m, height
150/300/600/900/1200 mm, wall thickness 125mm)
below conical piece as per required depth of manhole
and having steel reinforcement in all pieces of manhole
@ not less than 80 kg per cum of concrete, including
cast-in-situ PCC M-10 grade (1:3:6) foundation of
2.125m dia and 150mm thickness, PCC M15 grade
12 17.57 circular wall ID 1.425 m, wall thickness 200mm, height
equal to OD of sewer pipe+50mm , PCC M15 grade
benching and channel portion and up to top level of
sewer pipe etc complete with curing compaction and
form work, supplying and fixing heavy duty SFRC
manhole cover as per IS 12592 (Part I and II), supplying
and fixing plastic encapsulated CI/MS foot steps,
including cost of shuttering, steel reinforcement, testing
for water tightness etc complete in all respect as per
drawing, as per specification and the direction of the
Engineer.
Note:- Excavation of earth work and road cutting for
manhole will be measured and paid separately.
Pre-cast RCC M-40 grade circular manholes 1.555 m
deep to invert with pre-cast manhole cover frame (height
0.20), conical piece (height 1.105), cast-in-situ PCC M-
17.57.1 10 grade foundation, PCC M15 grade circular wall ID each 18450.00
1.425m, wall thickness 200mm height equal to OD of
sewer pipe+50mm, PCC M15 grade benching and
channel portion.
Providing and fixing pre-cast RCC M-40 grade circular
ring of ID 1.5m, wall thickness 125mm, height
17.57.2 150/300/600/900/1200mm for constructing extra depth Mtr. 7362.00
of manhole for depth beyond 1.555m as per drawing.
Providing and fixing Barricading at site of work for
restricting the general public using 80-100 mm dia
Wooden Ballies as vertical post with average spacing of
1.80 metre between two vertical posts, having height at
least 1.5 m above road/ ground level and at least 30-45
cm below road/ ground level by making suitable size
hole in road/ ground, providing and fixing two rows of 80-
13 4.26 100 mm Wooden Ballies as horizontal members with Mtr. 84.00
jute russies. Both vertical and horizontal members shall
be painted in red and white colour strips as per approved
pattern as and when it becomes shabby but at least after
every alternate shifting at new location. After shifting/
removal of barricading holes shall be filled up properly
and site is to be cleared in all respect. (Note:
measurement is to be done in linear basis)
BoQ-1 (RUIDP SoR 2017 )
Sl. No. Sor Ref Item Description Units RUIDP SoR
2017 Rate
Providing Barricading for Trenches using 80 - 100 mm
dia Wooden Ballies as vertical post, atleast 1.5m above
ground level and atleast 30-45 cm below ground level at
a spacing of 3 m. Two rows of PVC Tape (preferabley
14 4.25 red in colour) strip barricading horizontal strip securely Mtr. 76.50
tied by the vertical members. Vertical members shall be
painted in red and white colour. Rate is inclusive
removal and cleaning of site complete in all respect.

Providing and Fixing Minimum 0.63mm thick GI


corrugated sheets (minimum width of each sheet shall
be 60 cm) for covering the barricading in one/ two rows
one above another and painting in red and white stripes
15 4.3 as per the specifications and directions of the Engineer
Sqm 101.00
Incharge with proper fixing arrangements with GI limpet
washers nuts and bolts complete in all respect.

Providing, fixing and erecting precast RCC (M20) Vent


shaft with cowl, 125mm and 225mm internal and
external dia respectively at top, 300mm and 450mm
internal and external dia at bottom and 9.0m over all
length, bottom 1.175m below ground level fixed in the pit
900mmx900mmx1500mm with PCC M15, 250mm in
bed and minimum 200mm all around with top 150mm in
PCC M15 with 20mm nominal size graded stone
16 17.68 aggregate , junction of vent shaft and concrete grouted Each 24030.00
with cement mortar 1: including making connection with
sewer manhole with 150mm dia NP4 RCC pipe (IS 458-
ammended upto date) as required including Type-A
bedding complete as per standard design and finished
with water proofing cement of approved brand as per
drawings and/or as directed by Engineer.
Note : Only Excavation work will be measured and paid
separately
Providing at site, lowering & laying in trenches, aligning
& jointing of PVC-U pipes (SN 8) as per IS 15328
(amended up to date) and as per specifications with
rubber rings with socket and spigot joint , (EPDM/SBR)
17 17.25 for all depths for pipe length as per standard drawing
and RUIDP Standard specification including hydraulic
field testing and commissioning etc complete as directed
by Engineer.
Note : E/w to be measured and paid separately.
110 mm Nominal Dia
17.25.1 Meter 244.00
160 mm Nominal Dia
17.25.2 Meter 510.00
Carriage of Materials by mechanical transport including
loading, unloading and stacking upto 1km lead: Stone,
18 1.1 boulders, gravelly material
Cum 106.00

Carriage of Materials by mechanical transport including


19 1.1.1 loading, unloading and stacking upto 1.0 Km Earth. Cum 106.00
BoQ-1 (RUIDP SoR 2017 )
Sl. No. Sor Ref Item Description Units RUIDP SoR
2017 Rate
Providing, lowering, laying in trenches, aligning, fixing in
position and jointing Ductile Iron (DI) ISI marked K-7
grade S&S pipes as per IS:8329-2000 (amended upto
date), with internal cement mortar lining for potable
20 19.8 water with rubber ring (EPDM/SBR) joints as per IS:
5382-1985 (excluding special accessories) complete
including all material, labour, hydraulic testing and
commissioning as per RUIDP Standard Specifications
and as per direction of Engineer.
19.8.14 1000mm RM 22500.00
Dismantling of flexible pavements for sewer line and
manholes and disposal of dismantled materials up to a
lead of 50 metres, stacking serviceable and
unserviceable materials separately as directed by
21 17.8 Engineer including allowances for any additional
dismantling beyond the standard drawings
(measurement for payment to be as per standard
drawings), re-handling of material / earth to complete the
task.
Bituminous courses
17.8.1 Cum 356.00
Granular courses
17.8.2 Cum 247.00
Dismantling of existing structures like culverts, bridges,
retaining walls and other structure comprising of
masonry, cement concrete, wood work, steel work,
including T&P and scaffolding wherever necessary,
22 2.4.2 sorting the dismantled material, disposal of Cum 427.00
unserviceable material and stacking the serviceable
material with all lifts and lead of 50 metres as directed
by Engineer.
Cement Concrete Grade M-15 & M-20 & PCC blocks
Dismantling of existing structures like culverts, bridges,
retaining walls and other structure comprising of
masonry, cement concrete, wood work, steel work,
including T&P and scaffolding wherever necessary,
23 2.4.4.2 sorting the dismantled material, disposal of Cum 261.00
unserviceable material and stacking the serviceable
material with all lifts and lead of 50 metres as directed
by Engineer.
Dismantling of Rubble stone masonry in cement mortar.
Dismantling of cement concrete pavement for sewer line
and manholes by mechanical means using pneumatic
tools, breaking to pieces not exceeding 0.02 cum in
volume and stock piling at designated locations and
disposal of dismantled materials up to a lead of 1000
metres, stacking serviceable and unserviceable
24 17.9 materials separately as per MoRT&H specification
Cum 802.00
clause 202 including allowances for any additional
dismantling beyond the standard drawings
(measurement for payment to be as per standard
drawings), rehandling of material / earth to complete the
task.
Providing and making connection to the manhole/ road
side chamber/ property chamber by cutting hole in wall,
making good the same with brick work/ stone masonry
25 17.65 work in cement mortar 1:4, plaster in cement mortar 1:3, each 707.00
encasement of pipe at manhole with 75mm thick M15
grade concrete etc complete as directed by Engineer.
BoQ-1 (RUIDP SoR 2017 )
Sl. No. Sor Ref Item Description Units RUIDP SoR
2017 Rate
Taking out C.I. cover with frame from R.C.C. top slab of
manholes of various sizes including demolishing of
R.C.C. work manually/ by mechanical means and
26 3.27 stacking of useful materials near the site and disposal of each 264.00
unserviceable materials into municipal dumps within 50
metres lead as per direction of Engineer-in-charge.
Sludge clearance of drains, channels and canals with lift
27 4.24 1.5 Mtr and lead up to 50 Mtr. Cum 254.00
Providing and fixing G.I. pipes complete with G.I. fittings
28 34.12 including trenching and refilling etc. External work :
34.12.1 15 mm dia. nominal bore RM 169.00
34.12.2 20 mm dia. nominal bore RM 206.00
Construction of stone masonry cylindrical road side
inspection chamber of 450mm dia (internal) with 300mm
thick wall of stone masonry in cement mortar 1:4 (1
cement : 4 coarse sand), filling of Jhiri, 20mm thick
inside and outside plastering with CM (1:3), inside
plaster finished with neat coat of cement, with 100 mm
thick PCC M10 in foundation, 75mm thick PCC M15
flooring, precast SFRC/Mazza circular 450mm dia MD
29 17.62.3 manhole frame and cover embedded in 200mm thick each 6790.00
PCC M20 grade concrete, including providing and fixing
2 Nos 110mm OD, 0.5m long PVC-U pipe pieces of
stiffness class SN 8 as per IS 15328 and plugging the
same etc complete as per approved drawing and/or
directed by Engineer.
Note: Excavation of earth work and road cutting will be
measured and paid separately
SM Road side inspection chamber of 900mm depth
Total Cost
Road Restoration
Providing, laying and spreading of granular sub-base by
providing coarse graded Material (Table 400-2),
spreading in uniform layers with motor grader on
prepared surface, mixing BY MIX IN PLACE METHOD
30 7.3.2 with rotavator at OMC, and compacting with vibratory Cum 965.00
roller to achieve the desired density, complete as per
MoRT&H specification clause - 401 including all
material, labour, machinery, lighting, guarding and
maintenance of diversion. Grading - II Material
Providing laying, spreading and compacting stone
aggregates of specific sizes as per Table 400-7 to Water
Bound Macadam specification including spreading in
uniform thickness; hand packing, rolling with power
roller 8-10 tonnes, in stages to proper grade and
camber, applying and brooming requisite type of
screening (Table 400-8) binding materials to fill up the
interstices of coarse aggregates, watering (with water
browser) and compacting to required density, making
31 17.12.4 necessary earthen bund to protect edges as per clause
Cum 1521.00
404 of MoRT&H specification including all material,
labour, machinery, lighting, guarding and maintenance
of diversion under sewer line and manhole work
complete including allowances for any additional road
restoration beyond the drawings (measurement for
payment to be as per standard drawings) to complete
the task.
Crusher broken - Grade-III (53-22.4mm)
BoQ-1 (RUIDP SoR 2017 )
Sl. No. Sor Ref Item Description Units RUIDP SoR
2017 Rate
Providing and applying primer coat over prepared
surface of granular base with bitumen emulsion as per
IS : 8887 and approved quality @ 0.75 kg/sqm with the
help of spray set fitted on bitumen Container (boiler)
after cleaning the surface including removing of binding
material and other foreign matter with wire brushes and
32 8.2 small picks, sweeping with brooms or soft brushes and Sqm 24.50
finally dusting with old gunny bags and compressed air
to receive bituminous treatment complete as per clause
502 of MoRT&H specification including all material,
labour, machinery, lighting, guarding and maintenance
of diversion.
Providing and applying tack coat on the prepared
surface with bitumen emulsion as per IS: 8887 and
approved quality @ 0.225 kg/sqm with the help of spray
set fitted on bitumen Container (boiler) after cleaning the
surface with brooms or soft brushes and finally dusting
with old gunny bags and compressed air to receive
bituminous treatment complete as per clause 502 of
33 8.4 Sqm 7.75
MoRT&H specification including all material, labour,
machinery, lighting, guarding under sewer line and
manhole work including allowances for any additional
road restoration beyond the drawings (measurement for
payment to be as per standard drawings) to complete
the task.

Providing and laying open graded premix carpet 20mm


thick (compacted), on prepared surface in a single
course as wearing course, composed of specified
graded crushed stone aggregate as per Table 500-23,
premixed with bituminous binder @ 14.60 kg/10sqm
(including cost of anti-stripping compound wherever
required), including loading of material with F.E. loader,
hot mixing of stone aggregate and bitumen in
computerised hot mix plant, transporting the mixed
34 8.12.1 material by tippers to paver and laying with paver Sqm 94.00
finisher fitted with electronic sensor control to the
required level and grade, compacting smooth wheeled
roller 8-10 tonne capacity and finishing to required level
to achieve the desired density as per clause 511 of
MoRT&H specification including all material, labour,
machinery, lighting, guarding and maintenance of
diversion but excluding cost of tack coat/ seal coat.With
Bitumen VG-grade 30
Providing and laying premixed seal coat using hot mix
plant and paver finisher with aggregate of 6.7mm size
defined as 100% passing through 11.20mm sieve and
retain on 2.36mm sieve with 0.09 cum per 10 sqm
premix with bitumen binder @ 4.5% and rolling with
35 8.16.1 power roller 8-10 tonne complete as per clause 513 of
Sqm 54.50
MoRT&H specification including all material, labour,
machinery, lighting, guarding and maintenance of
diversion.
With Bitumen VG-grade 30
BoQ-1 (RUIDP SoR 2017 )
Sl. No. Sor Ref Item Description Units RUIDP SoR
2017 Rate
Providing and laying in position cement concrete of
specified grade over prepared base course complete
including finishing, curing, all material, labour,
machinery, lighting, guarding for road restoration under
sewer line and manhole work including allowances for
36 17.11.1 any additional road restoration beyond the standard Cum 5148.00
drawings (measurement for payment to be as per
standard drawings) to complete the task. :
1:1:2 (1 Cement : 1 coarse sand : 2 graded stone
aggregate 20 mm nominal size) (As per design mix)

Providing and laying in position cement concrete 1:3:6


(1 Cement: 1 graded stone aggregate 20 mm nominal
size) in base course complete including all material,
labour, machinery, lighting, guarding for road restoration
37 17.10 under sewer line and manhole work including Cum 4050.00
allowances for any additional road restoration beyond
the standard drawings (measurement for payment to be
as per standard drawings) to complete the task.
Providing and laying in position cement concrete of
specified grade for encasing of pipe excluding the cost
of centring and shuttering - All work upto plinth level
38 21.1.3 :1:2:4 (1 cement : 2 coarse sand : 4 graded stone
Cum 4280.00
aggregate 20 mm nominal size)

Providing and laying in position cement concrete of


specified grade excluding the cost of centring and
shuttering - All work upto plinth level : 1:3:6 (1 Cement :
39 21.1.6 3 fine/ coarse sand : 6 graded stone aggregate 40 mm
Cum 3670.00
nominal size).

Providing and laying in position specified grade of


reinforced cement concrete excluding the cost of
centring, shuttering, finishing and reinforcement - All
40 23.1.2 work upto plinth level : 1:1½:3 (1 cement : 1½ coarse
Cum 4464.00
sand : 3 graded stone aggregate 20 mm nominal size)

Reinforced cement concrete work in walls (any


thickness), including attached pilasters, buttresses,
plinth and string courses, fillets, columns, pillars, piers,
abutments, posts and struts etc. upto two stories
41 23.2.2 excluding cost of centring, shuttering, finishing and
Cum 4824.00
reinforcement :1:1½:3 (1 cement : 1½ coarse sand : 3
graded stone aggregate 20 mm nominal size)

Centring and shuttering upto two stories or height upto


42 22.1 7.5 metre above plinth level including strutting, propping
etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass
22.1.1 concrete. Sqm 162.00

Columns, Pillars, Piers, Abutments, Posts and Struts.


22.1.6 Sqm 254.00
Reinforcement for R.C.C. work at all levels including
straightening, cutting, bending, placing in position and
43 23.19.6 binding all complete. Thermo-Mechanically Treated Kg 51.50
bars.
BoQ-1 (RUIDP SoR 2017 )
Sl. No. Sor Ref Item Description Units RUIDP SoR
2017 Rate
Random rubble masonry with hard stone in foundation
and plinth : Cement mortar 1:6 (1 cement : 6 coarse
44 25.1.1 sand)
Cum 3190.00

Brick work with bricks of class designation 75 in


superstructure above plinth level upto two stories in all
45 24.5.1 shapes and sizes in : Cement mortar 1:4 (1 cement : 4 Cum 4050.00
coarse sand)

Cement plastering including T&P, scaffolding, material


and complete labour, including cost of water, curing,
46 32.1.1 racking of joints etc. with 12 mm cement plaster of mix: Sqm 150.00
1:4 (1 cement : 4 fine/ coarse sand)

Total in Road Restoration