Ref. No. Rs.) Quantity CARRIAGE OF MATERIALS (By Mechanical Means) 1 1.1.1 Earth cu.m 185.54 1 lead of 2 km 2 1.1.2 Sand, bazri, ballast, kankar cu.m 148.43 1 lead of 2 km 3 1.1.3 Stone, boulders, gravelly material cu.m 174.63 1 lead of 2 km 4 1.1.4 Bricks 1000 nos 395.83 1 lead of 2 km 5 1.1.5 Brick Tiles 1000 nos 237.5 1 lead of 2 km SITE CLEARANCE 1 2.1.1 Girth from 300 mm to 600 mm each 461.5 1 lead of 1000 mtrs Clearing Grass and Removal of Rubbish (Maximum 150mm) by manual means and disposal at a lead of 50 2 2.2 metres hectare 35,900.00 1 lead of 50 metres 3 2.3.1 In area of light jungle hectare 61,600.00 1 lead of 50 metres Dismantling of existing structures; Cement Concrete 4 2.4.2 Grade M-15 and above and PCC blocks cum 678 1 lead of 50 metres 5 2.4.4.2 Dismantling Brick / Tile work ; In cement mortar cum 394.5 1 Dismantling of barbed wire fencing/ wire mesh fencing including posts, foundation concrete, back filling of pit by manual means including disposal of dismantled 6 2.15 material with all lifts metre 98.5 1 lead of 1000 metres DISMANTLING Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking Of area 1 3.3.2 beyond 3 sq. metres each 333.5 1 50 metres lead 2 3.2.1 Dismantling precast concrete or stone slabs in walls, sqm 183 50 metres lead Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal 4 3.6 of unserviceable material sqm 166.5 1 50 metres lead EARTH WORK Dressing of earth work in surface excavation including cutting and filling upto 30cm depth including disposal 1 4.1 of excavated earth sqm 41 1 upto 50m Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift 2 4.2.1 In all type of soil cum 235.5 1 lead upto 1000 metre Compacting original ground Loosening upto a level of 500 mm below the subgrade level watered, graded and compacted in layers by vibratory roller 8-10 3 2.3.1 tonne to meet requirement cum 48.5 1 lead of 50 metres Dismantling of existing structures; Cement Concrete 4 2.4.2 Grade M-15 and above and PCC blocks cum 678 1 lead of 50 metres
5 2.4.4.2 Dismantling Brick / Tile work ; In cement mortar cum 394.5 1
6 2.15 including posts, foundation concrete, back filling of pit metre 98.5 1 lead of 1000 metres SURVEY, TESTING, INVESTIGATION AND SITE OFFICE Topographic Survey For preparation of plans of built-up 1 5.1.1.1 areas Upto 10 hectare hectare 3,884.00
Fly levelling for transfer level from GTS benchmark to
project area by close traverse method for fixing of 2 5.1.3 temporary bench Mark as reference. km 746 Test pit to obtain the existing pavement crust details and DCP test for physical characteristics of the sub- 3 5.2.2 grade soil each 2,099.00 MORTARS 1 6.2 Cement mortar 1:2 (1 cement : 2 fine sand). cum 7,976.00 White cement mortar 1:2 (1 white cement : 2 marble 2 6.15 dust). cum 14,397.00 CONCRETE WORK 1:1:2 (1 Cement : 1 coarse sand : 2 graded stone 1 21.1.1 aggregate 20 mm nominal size) (As per design mix) cum 5,980.00 1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal size) (As per design mix) including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms 2 21.2.1 per cum of Concrete/ mortar. cum 6,890.00 Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm bed by dry brick ballast 40mm nominal size well rammed and consolidated and grouted with fine sand including 3 21.13 finishing the top smooth. sqm 503.00 FORM WORK Foundations, footings, bases of columns, etc. for mass 1 22.1.1 concrete sqm 236.50 2 22.1.10 Extra for arches, domes, vaults exceeding 6 m span sqm 526.00 STONE WORK (Masonry) Random rubble masonry with hard stone in foundation and plinth Cement mortar 1:6 (1 cement : 6 coarse 1 25.1.1 sand) cum 4,860.00 2 25.12.1.1 One face dressed. Red sand stone cum 40,300.00 Kota stone slabs exposed face dressed and rubbed.25 3 26.15.1.1 mm thick. sqm 2,655.00 MARBLE WORK Providing and fixing Marble stone flooring table rubbed 1 27.1.1.1 Upto to 1500 Cm2 Tiles sqm 2,002.00 P & F 1st quality Vitrified Porcelain Polished tiles on floor, skirting and steps etc.in different sizes (thickness to be specified by manufacture) with water absorption less than 0.08% and conforming to IS 15622 of approved make in all colour and shade, laid with 20 mm thick CM 1 : 4 including grouting the joints with white cement and matching pigment etc complete. Size 2 27.17.1 450 mm X 450 mm sqm 1,509.00 STEEL WORK Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat 1 29.2 of approved steel primer all complete: kg 114.5 Steel work in built up tubular trusses including cutting, hoisting fixing in position and applying a priming coat of approved steel primer, welded and bolted including special shaped washers etc. complete. Hot finished 2 29.17.2 seamless type tubes kg 142.5 FLOORING Brick on edge flooring with bricks of class designation 1 30.1.1 1:4 (1 cement : 4 coarse sand) sqm 758 40 mm thick marble chips flooring rubbed and polished to granolithic finish, under layer 34 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5mm nominal size) and top layer 6mm thick with white, black, chocolate, grey, yellow or green marble chips of sizes from 1mm to 4mm nominal size laid in cement marble powder mix 3:1 (3 cement : 1 marble powder) by weight in proportion of 4:7 (4 cement marble powder mix : 7 marble chips) by volume including cement slurry etc. complete Light shade 2 30.10.2 pigment with white cement . sqm 841 40 mm thick rubbed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement :5 coarse sand) with joints 3mm thick, side buttered with cement mortar 1:2 (1 cement : 2 stone dust) admixed with pigment to match the shade of stone and pointing 3 30.29.1 with same mortar Red sand stone sqm 1,229.00 ROOFING
Providing corrugated G.S. sheet roofing including
vertical/ curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete upto any pitch in horizontal/ vertical or curved surfaces) excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 1.00mm thick 1 31.1.1 with zinc coating not less than 275gm/m² sqm 1,241.00 Providing sand stone slab for roofing and laying them in cement mortar 1 : 4 (1 cement : 4 coarse sand) over wooden karries or R.C.C. battens (Karries and battens to be paid separately) including pointing the ceiling joints with cement mortar 1:3 (1 cement : 3 fine sand ) 2 31.23.1 complete Red sand stone slab sqm 880 FINISHING Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:4 (1 cement : 4 fine/ 1 32.1 coarse sand) sqm 227 CARRIAGE OF MATERIALS SITE CLEARANCE DISMANTLING EARTH WORK SURVEY, TESTING, INVESTIGATION AND SITE OFFICE MORTARS BUILDING WORKS CONCRETE WORK FORM WORK REINFORCED CEMENT CONCRETE BRICK WORK STONE WORK (Masonry) STONE WORK (Slabs) MARBLE WORK WOOD AND PVC WORK STEEL WORK FLOORING ROOFING FINISHING