Other Item Description Rate (In Total

Sr. No. Unit No. Length Width Height Quantity


Ref. No. Rs.) Quantity
CARRIAGE OF MATERIALS (By Mechanical Means)
1 1.1.1 Earth cu.m 185.54 1 lead of 2 km
2 1.1.2 Sand, bazri, ballast, kankar cu.m 148.43 1 lead of 2 km
3 1.1.3 Stone, boulders, gravelly material cu.m 174.63 1 lead of 2 km
4 1.1.4 Bricks 1000 nos 395.83 1 lead of 2 km
5 1.1.5 Brick Tiles 1000 nos 237.5 1 lead of 2 km
SITE CLEARANCE
1 2.1.1 Girth from 300 mm to 600 mm each 461.5 1 lead of 1000 mtrs
Clearing Grass and Removal of Rubbish (Maximum
150mm) by manual means and disposal at a lead of 50
2 2.2 metres hectare 35,900.00 1 lead of 50 metres
3 2.3.1 In area of light jungle hectare 61,600.00 1 lead of 50 metres
Dismantling of existing structures; Cement Concrete
4 2.4.2 Grade M-15 and above and PCC blocks cum 678 1 lead of 50 metres
5 2.4.4.2 Dismantling Brick / Tile work ; In cement mortar cum 394.5 1
Dismantling of barbed wire fencing/ wire mesh fencing
including posts, foundation concrete, back filling of pit
by manual means including disposal of dismantled
6 2.15 material with all lifts metre 98.5 1 lead of 1000 metres
DISMANTLING
Dismantling doors, windows and clerestory windows
(steel or wood) shutter including chowkhats,
architrave, holdfasts etc. complete and stacking Of area
1 3.3.2 beyond 3 sq. metres each 333.5 1 50 metres lead
2 3.2.1 Dismantling precast concrete or stone slabs in walls, sqm 183 50 metres lead
Dismantling stone slab flooring laid in cement mortar
including stacking of serviceable material and disposal
4 3.6 of unserviceable material sqm 166.5 1 50 metres lead
EARTH WORK
Dressing of earth work in surface excavation including
cutting and filling upto 30cm depth including disposal
1 4.1 of excavated earth sqm 41 1 upto 50m
Earth work in excavation for roadway, including
trimming bottom and side slopes in accordance with
requirement of line, grades and cross sections,
including disposal of surplus material with all lift
2 4.2.1 In all type of soil cum 235.5 1 lead upto 1000 metre
Compacting original ground
Loosening upto a level of 500 mm below the subgrade
level watered, graded and compacted in layers by
vibratory roller 8-10
3 2.3.1 tonne to meet requirement cum 48.5 1 lead of 50 metres
Dismantling of existing structures; Cement Concrete
4 2.4.2 Grade M-15 and above and PCC blocks cum 678 1 lead of 50 metres

5 2.4.4.2 Dismantling Brick / Tile work ; In cement mortar cum 394.5 1


6 2.15 including posts, foundation concrete, back filling of pit metre 98.5 1 lead of 1000 metres
SURVEY, TESTING, INVESTIGATION AND SITE OFFICE
Topographic Survey For preparation of plans of built-up
1 5.1.1.1 areas Upto 10 hectare hectare 3,884.00

Fly levelling for transfer level from GTS benchmark to


project area by close traverse method for fixing of
2 5.1.3 temporary bench Mark as reference. km 746
Test pit to obtain the existing pavement crust details
and DCP test for physical characteristics of the sub-
3 5.2.2 grade soil each 2,099.00
MORTARS
1 6.2 Cement mortar 1:2 (1 cement : 2 fine sand). cum 7,976.00
White cement mortar 1:2 (1 white cement : 2 marble
2 6.15 dust). cum 14,397.00
CONCRETE WORK
1:1:2 (1 Cement : 1 coarse sand : 2 graded stone
1 21.1.1 aggregate 20 mm nominal size) (As per design mix) cum 5,980.00
1:1:2 (1 cement : 1 coarse sand : 2 graded stone
aggregate 20 mm nominal size) (As per design mix)
including Providing /mixing of synthetic fibers
compulsorily complying with IS 16481:2022 of 06
mm/12 mm length to be mixed @ 0.25% by weight of
Cement i.e. 125 gms per 50 kg Cement up to 900 gms
2 21.2.1 per cum of Concrete/ mortar. cum 6,890.00
Making plinth protection 50mm thick of cement
concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded
stone aggregate 20 mm nominal size) over 75mm bed
by dry brick ballast 40mm nominal size well rammed
and consolidated and grouted with fine sand including
3 21.13 finishing the top smooth. sqm 503.00
FORM WORK
Foundations, footings, bases of columns, etc. for mass
1 22.1.1 concrete sqm 236.50
2 22.1.10 Extra for arches, domes, vaults exceeding 6 m span sqm 526.00
STONE WORK (Masonry)
Random rubble masonry with hard stone in foundation
and plinth Cement mortar 1:6 (1 cement : 6 coarse
1 25.1.1 sand) cum 4,860.00
2 25.12.1.1 One face dressed. Red sand stone cum 40,300.00
Kota stone slabs exposed face dressed and rubbed.25
3 26.15.1.1 mm thick. sqm 2,655.00
MARBLE WORK
Providing and fixing Marble stone flooring table rubbed
1 27.1.1.1 Upto to 1500 Cm2 Tiles sqm 2,002.00
P & F 1st quality Vitrified Porcelain Polished tiles on
floor, skirting and steps etc.in different sizes (thickness
to be specified by manufacture) with water absorption
less than 0.08% and conforming to IS 15622 of
approved make in all colour and shade, laid with 20
mm thick CM 1 : 4 including grouting the joints with
white cement and matching pigment etc complete. Size
2 27.17.1 450 mm X 450 mm sqm 1,509.00
STEEL WORK
Structural steel work riveted, bolted or welded in built
up sections, trusses and framed work, including cutting,
hoisting, fixing in position and applying a priming coat
1 29.2 of approved steel primer all complete: kg 114.5
Steel work in built up tubular trusses including cutting,
hoisting fixing in position and applying a priming coat of
approved steel primer, welded and bolted including
special shaped washers etc. complete. Hot finished
2 29.17.2 seamless type tubes kg 142.5
FLOORING
Brick on edge flooring with bricks of class designation
1 30.1.1 1:4 (1 cement : 4 coarse sand) sqm 758
40 mm thick marble chips flooring rubbed and polished
to granolithic finish, under layer 34 mm thick cement
concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded
stone aggregate 12.5mm nominal size) and top layer
6mm thick with white, black, chocolate, grey, yellow or
green marble chips of sizes from 1mm to 4mm nominal
size laid in cement marble powder mix 3:1 (3 cement :
1 marble powder) by weight in proportion of 4:7 (4
cement marble powder mix : 7 marble chips) by volume
including cement slurry etc. complete Light shade
2 30.10.2 pigment with white cement . sqm 841
40 mm thick rubbed stone flooring over 20 mm
(average) thick base of cement mortar 1:5 (1 cement :5
coarse sand) with joints 3mm thick, side buttered with
cement mortar 1:2 (1 cement : 2 stone dust) admixed
with pigment to match the shade of stone and pointing
3 30.29.1 with same mortar Red sand stone sqm 1,229.00
ROOFING

Providing corrugated G.S. sheet roofing including


vertical/ curved surface fixed with polymer coated J or
L hooks, bolts and nuts 8 mm diameter with bitumen
and G.I. limpet washers or with G.I. limpet washers
filled with white lead and including a coat of approved
steel primer and two coats of approved paint on
overlapping of sheets complete upto any pitch in
horizontal/ vertical or curved surfaces) excluding the
cost of purlins, rafters and trusses and including cutting
to size and shape wherever required. 1.00mm thick
1 31.1.1 with zinc coating not less than 275gm/m² sqm 1,241.00
Providing sand stone slab for roofing and laying them in
cement mortar 1 : 4 (1 cement : 4 coarse sand) over
wooden karries or R.C.C. battens (Karries and battens
to be paid separately) including pointing the ceiling
joints with cement mortar 1:3 (1 cement : 3 fine sand )
2 31.23.1 complete Red sand stone slab sqm 880
FINISHING
Cement plastering including T&P, scaffolding, material
and complete labour, including cost of water, curing,
racking of joints etc. with 12 mm cement plaster of mix
: including Providing /mixing of synthetic fibers
compulsorily complying with IS 16481:2022 of 06
mm/12 mm length to be mixed @ 0.25% by weight of
Cement i.e. 125 gms per 50 kg Cement up to 900 gms
per cum of Concrete/ mortar 1:4 (1 cement : 4 fine/
1 32.1 coarse sand) sqm 227
CARRIAGE OF MATERIALS
SITE CLEARANCE
DISMANTLING
EARTH WORK
SURVEY, TESTING, INVESTIGATION AND SITE OFFICE
MORTARS
BUILDING WORKS
CONCRETE WORK
FORM WORK
REINFORCED CEMENT CONCRETE
BRICK WORK
STONE WORK (Masonry)
STONE WORK (Slabs)
MARBLE WORK
WOOD AND PVC WORK
STEEL WORK
FLOORING
ROOFING
FINISHING