Tanggal Keterangan Nominal

18-Mar-22 Dana awal Rp 1,700,000


18-Mar-22 dana awal lebih Rp 1,950,000
18-Mar-22 dana iuran Rp 1,610,000
19-Feb-22 transfer an. trisilvana Rp 835,000
19-Feb-22 transfer an. Luky Rp 600,000
20-Feb-22 Dana Awal dan Bonus Rp 450,000
20-Feb-22 Dana iuran Rp 150,000
20-Feb-22 Dana Kehadiran Rp 400,000
21-Feb-22 Dana Awal dan Bonus Rp 700,000
21-Feb-22 Dana iuran Rp 800,000
22-Feb-22 Dana Program Rp 400,000
22-Feb-22 Transfer an. Dian Fazrin Rp 1,200,000
23-Feb-22 transfer an. Ni wayan Rp 900,000
23-Feb-22 Transfer an. Moh ilham Rp 200,000
23-Feb-22 Dana Program Rp 3,600,000
23-Feb-22 Dana Iuran Rp 50,000
24-Feb-22 Transfer an. Fahri Sanso Rp 100,000
24-Feb-22 Dana Program Rp 1,050,000
24-Feb-22 dana iuran Rp 450,000
24-Feb-22 Dana Awal Rp 350,000
25-Feb-22 transfer an. trisilvana Rp 800,000
25-Feb-22 Dana Awal Rp 50,000
25-Feb-22 dana iuran Rp 325,000
25-Feb-22 Dana Program Rp 400,000
25-Feb-22 Dana Kehadiran Rp 1,600,000
26-Feb-22 Dana Program Rp 1,400,000
26-Feb-22 Dana Awal Rp 50,000
26-Feb-22 dana iuran Rp 175,000
26-Feb-22 Dana Kehadiran Rp 430,000
27-Feb-22 Transfer an. Saidin Mandepa Rp 900,000
27-Feb-22 transfer an. Luky Rp 800,000
27-Feb-22 Dana Program Rp 400,000
27-Feb-22 dana iuran Rp 100,000
27-Feb-22 Dana Kehadiran Rp 90,000
28-Feb-22 Transfer an. Nurlaela Latempo Rp 1,000,000
28-Feb-22 Transfer an. Anggelina A Rp 400,000
28-Feb-22 Transfer an. Dian Fazrin Rp 300,000
28-Feb-22 Transfer an. Muh ilham Rp 500,000
28-Feb-22 Dana Awal Rp 150,000
28-Feb-22 dana iuran Rp 100,000
28-Feb-22 Dana Kehadiran Rp 20,000
1-Mar-22 Dana Program Rp 1,800,000
1-Mar-22 Dana Awal Rp 100,000
1-Mar-22 dana iuran Rp 100,000
1-Mar-22 Dana Kehadiran Rp 30,000
1-Mar-22 Sumbangan Masjid an. Pak Marno Rp 200,000
2-Mar-22 Pembuatan taman Rp 10,000,000
2-Mar-22 Sumbangan masjid an. Pak Hamdin Rp 1,000,000
2-Mar-22 Transfer an. Guntur Rp 500,000
2-Mar-22 Dana Awal Rp 50,000
2-Mar-22 dana iuran Rp 175,000
2-Mar-22 Dana Program Rp 2,200,000
3-Mar-22 Dana Program Rp 1,600,000
3-Mar-22 Dana Awal Rp 50,000
3-Mar-22 dana iuran Rp 250,000
4-Mar-22 Transfer an. Darnawati Rp 500,000
4-Mar-22 Dana Awal Rp 50,000
4-Mar-22 dana iuran Rp 175,000
4-Mar-22 Dana Program Rp 500,000
4-Mar-22 Dana Kehadiran Rp 30,000
5-Mar-22 Transfer an. Moh kamal Rp 990,000
5-Mar-22 Transfer an. Moh Tofan Rp 1,550,000
5-Mar-22 Transfer an. Dian Fazrin Rp 1,000,000
5-Mar-22 Dana Awal Rp 200,000
5-Mar-22 dana iuran Rp 450,000
5-Mar-22 Dana Kehadiran Rp 1,300,000
5-Mar-22 Dana Program Rp 3,200,000
6-Mar-22 Transfer an. Arik Choiriyah Rp 2,150,000
6-Mar-22 Transfer an. Mega jayana Rp 1,600,000
6-Mar-22 Dana Kehadiran Rp 110,000
6-Mar-22 Dana Awal Rp 50,000
6-Mar-22 dana iuran Rp 175,000
6-Mar-22 Dana Program Rp 200,000
7-Mar-22 Dana Program Rp 1,200,000
7-Mar-22 dana iuran Rp 100,000
7-Mar-22 Dana Kehadiran Rp 370,000
7-Mar-22 Dari bendahara KKN Rp 10,000,000
8-Mar-22 dana iuran Rp 200,000
8-Mar-22 Dana Kehadiran Rp 10,000
9-Mar-22 dana iuran Rp 100,000
9-Mar-22 Dana Program Rp 1,300,000
9-Mar-22 Dana Kehadiran Rp 240,000
10-Mar-22 Sumbangan Masjid Rp 4,030,000
10-Mar-22 Dana Program Rp 1,600,000
10-Mar-22 dana iuran Rp 200,000
10-Mar-22 Dana Awal Rp 50,000
10-Mar-22 Dana Kehadiran Rp 440,000
11-Mar-22 Dari bendahara KKN Rp 3,000,000
11-Mar-22 Dana awal Rp 50,000
11-Mar-22 dana iuran Rp 100,000
11-Mar-22 Dana Program Rp 200,000
12-Mar-22 Dana Kehadiran Rp 80,000
13-Mar-22 Dana Awal Rp 50,000
13-Mar-22 Transfer an. Michael Bramanda Rp 1,340,000
13-Mar-22 Transfer an. Muh Afrizal Rp 1,120,000
13-Mar-22 Transfer an. Muh iksan Rp 370,000
14-Mar-22 Transfer an. Muh ilham Rp 300,000
14-Mar-22 Transfer an. Alfrets Pamolango Rp 520,000
14-Mar-22 Transfer an. Saidin Mandepa Rp 560,000
14-Mar-22 Dana Program Rp 600,000
14-Mar-22 Dana Kehadiran Rp 200,000
14-Mar-22 dana iuran Rp 225,000
15-Mar-22 Dana iuran Rp 100,000
15-Mar-22 Dana Program Rp 400,000
16-Mar-22 Transfer an. Andi firdaus Rp 1,250,000
16-Mar-22 Dana iuran Rp 150,000
16-Mar-22 Dana Kehadiran Rp 50,000
17-Mar-22 Transfer an. Muh. Iksan Rp 1,200,000
17-Mar-22 Dana iuran Rp 50,000
17-Mar-22 Dana Program Rp 400,000
17-Mar-22 Dana Kehadiran Rp 20,000
18-Mar-22 Transfer an. Jodi Prakoso (masjid) Rp 1,000,000
18-Mar-22 Dana Program Rp 200,000
18-Mar-22 Dari bendahara KKN Rp 5,000,000
18-Mar-22 Dana Iuran Rp 175,000
19-Mar-22 Transfer an. Dandy Darmawan Rp 400,000
19-Mar-22 Dana Kehadiran Rp 330,000
19-Mar-22 dana iuran Rp 175,000
21-Mar-22 dana iuran Rp 100,000
21-Mar-22 Transfer an. Dian Fazrin Rp 100,000
21-Mar-22 Transfer an. Saidin Mandepa Rp 100,000
21-Mar-22 Dana Kehadiran Rp 10,000
22-Mar-22 Dana Kehadiran Rp 100,000
22-Mar-22 dana iuran Rp 225,000
23-Mar-22 Dari bendahara KKN Rp 5,000,000
24-Mar-22 dana iuran Rp 175,000
24-Mar-22 Dana Program Rp 1,000,000
24-Mar-22 Dana Kehadiran Rp 990,000
24-Mar-22 Dana Perpisahan Rp 200,000
25-Mar-22 Dana Kehadiran Rp 100,000
25-Mar-22 Dana Perpisahan Rp 300,000
26-Mar-22 Transfer an. Putra Teguh Rp 250,000
26-Mar-22 Dana Kehadiran Rp 1,380,000
26-Mar-22 dana iuran Rp 750,000
26-Mar-22 Dana Program Rp 500,000
26-Mar-22 Dana Perpisahan Rp 675,000
26-Mar-22 Dari bendahara KKN Rp 4,500,000
27-Mar-22 Transfer an. Alfrets Pamolango Rp 800,000
27-Mar-22 dana iuran Rp 225,000
27-Mar-22 Dana Perpisahan Rp 200,000
28-Mar-22 Transfer an. Mutiara Rp 400,000
28-Mar-22 dana iuran Rp 450,000
28-Mar-22 Dana Perpisahan Rp 350,000
28-Mar-22 Dana Kehadiran Rp 200,000
28-Mar-22 Dana Proposal dari Balut Rp 550,000
29-Mar-22 dana iuran Rp 325,000
29-Mar-22 Dana Perpisahan Rp 300,000
Rp 119,480,000
Tanggal Volume Keterangan Jumlah
19-Feb-22 2 Karton Awesome Rp 50,000
19-Feb-22 1 Buah Stella jeruk Rp 12,500
19-Feb-22 1 Pack Plastik Sampah Rp 87,500
19-Feb-22 1 Buah mama lemon Rp 16,000
19-Feb-22 1 Buah Wipol Rp 11,900
19-Feb-22 1 Buah Nice Tissue + uang parkir Rp 38,500
19-Feb-22 6 Buah Kursi Bakso Rp 270,000
19-Feb-22 4 Buah Gelas 250 ml Rp 12,000
19-Feb-22 1 lusin Sendok the Rp 40,000
19-Feb-22 1 Buah spon cuci Rp 5,000
19-Feb-22 1 buah tempat sendok Rp 12,000
19-Feb-22 6 Buah Gelas 340 ml Rp 36,000
19-Feb-22 2 Buah Serbet Rp 12,000
19-Feb-22 1 buah Mangkok plastik kecil Rp 4,000
19-Feb-22 12 buah Piring plastik Rp 48,000
19-Feb-22 1 buah Kipas Angin + Uang parkir Rp 398,000
19-Feb-22 1 Buah Sapu Rp 28,000
19-Feb-22 1 Buah Pel + uang parkir Rp 27,000
19-Feb-22 2 Buah Buku Rp 17,500
19-Feb-22 1 Buah Gunting Rp 15,000
19-Feb-22 2 Buah Spidol Rp 19,000
19-Feb-22 2 Buah Pulpen Snowman + uang parkir Rp 12,000
19-Feb-22 3 Buah Galon biasa + Isi ulang Rp 115,000
19-Feb-22 1 Renteng Kopi Rp 12,000
19-Feb-22 2 Buah Kartu Remi dan Domino Rp 13,000
19-Feb-22 1 Botol Bensin Rp 10,000
20-Feb-22 1 buah Toples plastik Rp 9,000
20-Feb-22 1 Kotak Teh Sariwangi Rp 11,600
20-Feb-22 10 sach Nescafe Rp 6,500
20-Feb-22 1,5 Kg Gula pasir + uang parkir Rp 10,000
21-Feb-22 1 buah Spanduk 400x200 cm Rp 270,000
21-Feb-22 1 Buah Stempel KKN Rp 120,000
21-Feb-22 1 porsi Aneka Kue Rp 60,000
21-Feb-22 1 Rim HVS Rp 50,000
21-Feb-22 1 Buah Spidol Rp 16,000
21-Feb-22 1 Buah Mistar Rp 2,000
21-Feb-22 1 Buah Tip-x Rp 6,000
21-Feb-22 1 buah Buku Tamu Rp 27,500
21-Feb-22 1 buah Hekter dan isi Rp 23,500
21-Feb-22 1 Buah Rautan dan pensil Rp 6,500
21-Feb-22 1 Kotak Binder clip + Permen + Uang Parkir Rp 12,000
21-Feb-22 10 Mater Kabel, Stepler, dan Piting Rp 40,000
21-Feb-22 1 Buah Toples plastik + Uang parkir Rp 18,000
21-Feb-22 1 Rol Kabel Ace 2x30 Rp 38,000
21-Feb-22 2 Buah S/c Uticon 4 Lubang Rp 46,000
21-Feb-22 2 Buah steker Rp 18,000
21-Feb-22 1 buah Lument Capsul Rp 22,000
21-Feb-22 1 buah Slot + Grendel Rp 51,000
21-Feb-22 1 buah Biskitop + 1 kaleng Wafer + Parkir Rp 62,500
21-Feb-22 1 Paket Konsumsi malam Posko Rp 50,000
22-Feb-22 1 Karton Aqua Gelas Rp 36,900
22-Feb-22 1 Buah Spidol Rp 9,000
22-Feb-22 2 Buah Buku Album Rp 25,000
22-Feb-22 2 Buah Isolasi + Parkir Rp 28,000
22-Feb-22 50 Biji Kue Pia Rp 100,000
22-Feb-22 2 Porsi Pisang Goreng Rp 20,000
22-Feb-22 1 Buah Tinta Print Rp 40,000
23-Feb-22 1 Buah Sabun Slek Rp 33,000
23-Feb-22 1 Buah Hand Sanitizer Rp 70,000
23-Feb-22 1 Box Masker Rp 50,000
23-Feb-22 1 Buah Spanduk Rp 230,000
23-Feb-22 1 Buah Spanduk seminar Rp 85,000
23-Feb-22 2 Buah Spidol + Penghapus Rp 17,500
23-Feb-22 1 Buah Stiky Note Rp 17,500
23-Feb-22 1 Paket Konsumsi malam Posko Rp 50,000
24-Feb-22 2 Kg Gula pasir Rp 30,000
24-Feb-22 1 Renteng Energen Cokelat Rp 18,500
24-Feb-22 1 Renteng Kopi Torabika + parkir Rp 20,500
24-Feb-22 1 Paket Konsumsi malam Posko Rp 50,000
25-Feb-22 1 buah Pengapus papan Rp 5,000
25-Feb-22 1 Buah Spanduk Rp 65,000
25-Feb-22 3 Lembar Kertas bufalo + isolasi + double tape Rp 19,500
25-Feb-22 2 Dus Paku payung + Spidol Rp 30,500
25-Feb-22 1 Buah Tas Pouch + Pulpen + Parkir Rp 41,000
25-Feb-22 1 Buah Galon kran Rp 85,000
25-Feb-22 1 Bungkus Rokok gg Surya Rp 28,300
25-Feb-22 2 Kaleng Susu Rp 20,400
25-Feb-22 1 Kaleng Polaris + rokok Ecalir + parkir Rp 17,700
25-Feb-22 1 Paket Belanja bahan masak-masak Rp 75,000
27-Feb-22 1 Buah Kopi kapal api Rp 13,500
27-Feb-22 1 Buah Kripik Wahyu + Parkir Rp 45,000
27-Feb-22 1 porsi Pisang Goreng Rp 25,000
27-Feb-22 2 Buah Isi ualng galon Rp 10,000
27-Feb-22 8 Porsi Nasi goreng Rp 95,000
27-Feb-22 5 Buah Biaya Gorden + Tombak ring + Ring gorden + ongkos Rp 1,275,000
27-Feb-22 4 Lembar Tripleks 50mm + paku tripleks Rp 355,000
27-Feb-22 45 Lembar Tripleks 3mm + Ongkos antar Rp 2,225,000
28-Feb-22 1 Buah Swetch tp link + 20m kabel Lan + 2 Connector (WIFI) Rp 352,000
1-Mar-22 1 Renteng Kapal api mocca Rp 11,000
1-Mar-22 1 Buah Kopi kapal api Rp 13,500
1-Mar-22 1 Buah tinta Blue print Rp 40,000
1-Mar-22 8 Buah Minuman Ichitan Rp 64,000
1-Mar-22 1 porsi Pisang Goreng Rp 25,000
1-Mar-22 1 Paket Belanja Bazar Mahasiswa Rp 30,000
1-Mar-22 1 Paket Transport Bendahara Rp 20,000
1-Mar-22 1 buah Palu Rp 35,000
1-Mar-22 1 Paket Biaya pembuatan kanopi Fak. Hukum tahap 1 Rp 4,000,000
2-Mar-22 2 Buah Kopi kapal api Rp 26,000
2-Mar-22 1 kg Gula Pasir Rp 14,500
2-Mar-22 1 dus Teh Sariwangi + Parkir Rp 13,000
2-Mar-22 6 Rangkap Jilid Proposal Rp 30,000
2-Mar-22 4 Porsi Nasi goreng Rp 45,000
2-Mar-22 1 Paket Bayar pembuatan taman tahap 1 Rp 10,000,000
2-Mar-22 1 Lembar Tripleks + paku kalsi + ongkir Rp 125,000
3-Mar-22 1 porsi Pisang Goreng Rp 30,000
3-Mar-22 1 lusin Gelas Plastik Rp 28,500
3-Mar-22 1 Buah Joly Tissue Rp 7,900
3-Mar-22 6 Lembar Kertas Kopi Rp 9,000
3-Mar-22 1 Pack Sendok plastik Rp 19,000
3-Mar-22 1 Paket Belanja bahan RW Rp 324,000
3-Mar-22 1 Paket Barang sewa Ketring Rp 460,000
3-Mar-22 1 Paket Biaya desain taman Untika Rp 1,000,000
3-Mar-22 1 Paket Biaya dana awal pembuatan jeruji besi Rp 4,000,000
4-Mar-22 2 Karton Flow gelas Rp 46,000
4-Mar-22 1 kg Gula pasir Rp 18,000
4-Mar-22 1 Paket Transport Ketua Rp 50,000
4-Mar-22 1 Buah Sabun cuci piring Rp 20,000
4-Mar-22 2 Buah Semangka Rp 40,000
4-Mar-22 1 Paket Biaya tak terduga acara makan-makan Posko Rp 100,000
5-Mar-22 1 Paket Konsumsi Posko Rp 100,000
5-Mar-22 1 Bungkus Rokok Surya dan lain-lain Rp 50,000
5-Mar-22 1 Paket Biaya makan-makan hari jumat Rp 2,006,500
6-Mar-22 1 Paket Bayar tukang Rp 2,000,000
6-Mar-22 1 Kaleng Biskuit SBK Rp 19,500
6-Mar-22 1 Kaleng Biskuit Togo Rp 26,700
6-Mar-22 1 Paket Konsumsi malam Posko Rp 100,000
6-Mar-22 1 Paket Biaya pembuatan sekat kaca Lab. FKM Rp 7,500,000
6-Mar-22 1 Paket Biaya Pembuatan Jeruji Besi & Balkon teras belajar Rp 6,000,000
7-Feb-22 1 bungkus Rokok surya dan lain-lain Rp 50,000
7-Mar-22 1 kg Gula pasir Rp 15,000
7-Mar-22 1 Paket Biaya pembuatan kanopi Fak. Hukum tahap 2 Rp 2,500,000
7-Mar-22 1 Paket Biaya pembuatan bak sampah tahap 1 Rp 2,000,000
7-Mar-22 1 Paket Biaya pembuatan Kanopi Fak. Hukum tahap 3 Rp 2,000,000
9-Mar-22 1 Paket bensin rodin Rp 25,000
9-Mar-22 1 Karton awesome Rp 27,000
9-Mar-22 1 Botol Orson + es batu Rp 18,000
9-Mar-22 4 Bungkus Rokok Rp 84,000
9-Mar-22 1 Bungkus Rokok Surya Rp 27,000
9-Mar-22 1 Paket Transport Bendahara Rp 15,000
9-Mar-22 1 Buah Buku album Kas + Parkir Rp 29,500
9-Mar-22 1 Paket Biaya pembuatan bak sampah tahap 2 Rp 500,000
11-Mar-22 1 Paket konsumsi tukang penebang pohon Rp 150,000
11-Mar-22 1 Buah Kopi Rp 16,000
11-Mar-22 1 Paket Kabel lane putih + slip Rp 29,000
11-Mar-22 1 Paket Biaya pembuatan Taman Untika tahap 2 Rp 10,000,000
11-Mar-22 1 Paket Biaya Pembuatan Kanopi Masjid tahap 1 Rp 5,000,000
12-Mar-22 1 Buah Tinta warna Rp 30,000
12-Mar-22 1 Paket Biaya pembuatan bak sampah tahap 3 Rp 1,000,000
14-Mar-22 1 kg Gula pasir Rp 15,000
14-Mar-22 1 Buah Kopi kapal api Rp 25,500
14-Mar-22 1 Paket Biaya Tambahan pengadaan Wifi Fak. FKIP Rp 500,000
15-Mar-22 1 Buah Sabun cuci piring + Spon Rp 25,000
15-Mar-22 1 paket Transport Bendahara Rp 15,000
16-Mar-22 1 Paket Biaya pembuatan kanopi Masjid tahap2 Rp 2,000,000
16-Mar-22 1 Paket Biaya Prasasti tahap 1 Rp 500,000
17-Mar-22 2 kg Gula pasir Rp 30,000
17-Mar-22 1 Paket Isi ualng galon Rp 21,000
17-Mar-22 1 sak Semen Tonasa Rp 80,000
17-Mar-22 1 Paket Uang konsumsi pak ketua dan pekerja prasasti Rp 200,000
18-Mar-22 8 Porsi Nasi Kuning Rp 50,000
18-Mar-22 1 Botol Orson + es batu Rp 18,000
18-Mar-22 1 Paket Aneka Kue Rp 50,000
18-Mar-22 1 Botol Sirup ABC Nenas Rp 13,000
18-Mar-22 12 buah Gelas Alaska Plastik Rp 26,000
18-Mar-22 1 Paket Biaya pembuatan Taman Untika tahap 3 Rp 5,000,000
18-Mar-22 1 Paket Biaya Pembuatan Kanopi Masjid tahap 3 Rp 3,000,000
19-Mar-22 1 kg Gula pasir Rp 15,000
19-Mar-22 1 Botol Syrup ABC Lecy Rp 13,000
19-Mar-22 1 Kotak Teh Sariwangi Rp 11,000
19-Mar-22 2 Buah Kopi kapal api Rp 25,800
19-Mar-22 1 Botol Wipol Rp 23,500
19-Mar-22 10 Porsi Nasi ikan Rp 100,000
19-Mar-22 1 Paket Konsumsi ilong Rp 30,000
21-Mar-22 1 Paket Konsumsi DPL Rp 80,000
21-Mar-22 1 Paket Biaya belanja bahan Instalasi Listrik Rp 2,000,000
21-Mar-22 1 Paket Konsumsi rapat sore Rp 100,000
22-Mar-22 1 Paket Biaya pembuatan Kanopi tahap 4 Rp 2,500,000
22-Mar-22 1 Paket Biaya tambahan bahan Instalasi listrik Rp 800,000
22-Mar-22 10 Buah Pohon untuk taman Rp 280,000
22-Mar-22 1 Paket Transport Bendahara Rp 15,000
23-Mar-22 1 Paket Biaya pembuatan taman Untika tahap 4 Rp 5,000,000
23-Mar-22 1 Paket Biaya pembelian lampu taman Rp 1,900,000
23-Mar-22 10 Bungkus Nasi ikan Rp 110,000
23-Mar-22 2 Buah Kipas Angin + Uang bensin Rp 1,000,000
23-Mar-22 1paket Biaya pembuatan prasasti Rp 2,000,000
24-Mar-22 1 Paket Biaya pengerjaan Lampu taman Rp 2,002,500
24-Mar-22 1,5 Kg Gula pasir Rp 10,000
24-Mar-22 1 Buah Kopi kapal api Rp 16,000
25-Mar-22 1 Paket Biaya pengangkatan material taman Rp 500,000
25-Mar-22 1 Paket Konsumsi Rp 50,000
26-Mar-22 1 paket Biaya pembuatan taman Untika tahap 5 Rp 4,500,000
26-Mar-22 1 Paket Tambahan uang pembayaran pembuatan Taman Rp 500,000
27-Mar-22 1 Paket Pembayaran biaya Sound perpisahan Rp 2,500,000
28-Mar-22 4 Buah Tenda perpisahan Rp 2,500,000
28-Mar-22 1 Paket Lampu LED Rp 250,000
28-Mar-22 1 Paket Print undangan Rp 30,000
28-Mar-22 1 Paket Lampu tenda Rp 1,000,000
28-Mar-22 5 Buah Tali rafia Rp 10,000
28-Mar-22 1 paket Kain penutup panggung Rp 160,000
28-Mar-22 1 Paket Kertas kopi Rp 35,000
28-Mar-22 1 Paket Konsumsi malam Rp 50,000
28-Mar-22 1 paket Pita rol + Bunga plastik + Gunting + Parkir Rp 50,000
28-Mar-22 1 Dus Amplop Rp 30,000
28-Mar-22 1 paket Kopi kapal api + Gula Rp 23,000
28-Mar-22 20 lembar Print undangan Rp 20,000
28-Mar-22 29 Lembar Fotocopy undangan Rp 13,000
28-Mar-22 2 Buah Meja + lilitan Rp 275,000
28-Mar-22 1 Buah Baliho Rp 210,000
29-Mar-22 2 Buah Tissue Rp 26,000
29-Mar-22 1 Buah Kain batik Rp 10,000
29-Mar-22 5 pack Plastik Rp 10,000
29-Mar-22 1 Paket Bayar penyanyi elekton Rp 200,000
29-Mar-22 1 Paket Aneka Kue (untuk tamu) Rp 104,000
29-Mar-22 120 Dus Aneka kue malam perpisahan Rp 1,920,000
29-Mar-22 2 sisir Buah pisang Rp 20,000
29-Mar-22 4 Karton Aqua Gelas Rp 148,000
29-Mar-22 1 Karton Aqua 330ml Rp 52,000
29-Mar-22 1 Paket Konsumsi DPL Rp 70,000
30-Mar-22 1 paket Dana pengangkutan dan pembersihan properti perpisahan Rp 250,000
1-Apr-22 1 Buah Perbaikan printer Rp 150,000
1-Apr-22 1 Paket Pembelian cendramata DPL oleh ketua Rp 2,000,000
Rp 117,240,700
Program Utama
Program Utama
Program Utama
Program Utama
Program Utama

Program Utama
Program Utama

Program Tambahan
Program Tambahan
Program Tambahan
Program Tambahan
Program Tambahan
Program Tambahan
Program Utama
Program Utama
Program Tambahan

Program Tambahan
Program Tambahan

Program Tambahan

Program Utama
Program Utama

Program Utama
Program Utama
Program Utama
Program Utama

Program Utama
Program Utama

Program Utama

Program Utama

Program Utama
Program Tambahan

Program Tambahan
Program Tambahan

Program Utama
Program Utama

Program Tambahan

Program Utama
Program Tambahan
Program Tambahan
Program Utama
Program Tambahan

Program Tambahan
Program Tambahan
Program Tambahan

Program Utama
Program Utama
Keterangan Dana ketetapan Dana estimasi
Dana awal Rp 50,000 Rp 3,900,000
Iuran mingguan selama 6 minggu Rp 25,000 Rp 11,700,000
Dana Program mahasiswa aktif (50 orang) Rp 400,000 Rp 20,000,000
Dana Program mahasiswa kurang aktif (28 orang) Rp 800,000 Rp 22,400,000
Dana kehadiran harian
Dana tambahan perpisahan Rp 100,000 Rp 7,800,000
Dana proposal masjid
Dana proposal dari Balut
Dana Dari bendahara KKN Universitas

Total Pengeluaran
Saldo Akhir
Dana yang diterima
Rp 7,100,000
Rp 10,725,000
Rp 19,600,000
Rp 21,500,000
Rp 11,800,000
Rp 2,275,000
Rp 8,430,000
Rp 550,000
Rp 37,500,000
Rp 119,480,000
Rp 117,240,700
Rp 2,239,300