Professional Documents
Culture Documents
SUMMARY
More than 5 years of diverse and in-depth experience across different functions in automobile sectors
Expertise in production planning, supply chain, project management, business excellence & model introduction
Last Designation, Company 1 Name Start Year – End Year
PROFESSIONAL
Part of team that managed operations at the company’s 120,000 units a month car production plant in Hanoi
Production Planning
Managed master production planners working on Finished Goods inventory reduction commitment of $3.4M
Negotiated with manufacturing plants for tradeoff between inventory & profitability reducing $250K in costs,
‘12
Led award winning collaboration meeting of cross-functional teams as part of service discussion forum
Defined individual development plans, coached subject matter experts and conceptualized process
documentation
Improved productivity by 15% using CI tools like Daily Management System to monitor KPIs & Value Stream
Mapping to standardize processes
Supply Chain Analysis
Implemented Inventory Optimization System, saving $2.7million in first year from one time level setting,
Reduced working capital and costs associated with write-offs, repositioning and storage/handling of inventory
Led advisory committee to facilitate fast decision making & project updates and influenced in design decisions
Rolled out training plan. Functionally trained US, Canada & India users resulting in productivity increase of
$25K
Deputy Manager, Maruti Suzuki India Limited 2011 – 2016
Collaborated with various stakeholders to setup efficient and flexible hatchback car assembly lines
Project Management:
Represented MSIL as subject-matter expert for installation of greenfield assembly line by M/s Suzuki in Gujarat
Achieved 20% cost reduction (MRs. 6.0) by introducing new local competitor to Japanese vendor for Direct
Glazing equipment for manual line
Lowered cost by 50% by localizing Brake Fluid Filling equipment for manual line with existing Indian supplier
Reached 95% overall equipment efficiency in 30 days of facility installation using 4-stage checksheet
mechanism
Actualized zero accident commissioning of facilities in new manual line by conducting Design FMEA
Effected procurement, design approvals, installation, and commissioning of projects worth MRs. 00 (to be
entered)
Awarded “Best Automation/Flexibility/Productivity” project in the Annual Manufacturing Business Meet 2016
New Model Introduction
Effected 8% improvement in production ramp-up time of 'Baleno' using 8-stage gate system as project in-charge
Initiated 17 design changes in ‘soon-to-be-launched’ model for better operator ergonomics & assembly
feasibility
Implemented MOST to estimate standard work-time for new model line balancing improving variations by 15%
Headed the introduction of ‘Ritz’ and ‘Swift Dzire’ in a record time of 30 days and 21 days respectively
Achieved 33% cost reduction (MRs. 5.5) by redesigning glass sub assembly process for introduction of ‘Baleno’
Business Excellence
Attained 6% process quality improvement by formulating & implementing policy for fastening tools in assembly
Headed a cross-functional team of 11 members for 100% defect-free rollout of repaired quality check OK
vehicles
Improved the up-time of assembly tools by 33% by introducing preventive maintenance techniques
Awarded Certificate of Excellence for group performance in Company Wide Quality Circle Competition 2014-
15
Digital Manufacturing
1| Pa
FirstName LastName Operations
Co-authored a white paper on “3D factory modeling and simulation reduces errors, costs and project lead times”
Department coordinator for deployment of PLM Module – TcManufacturing in production engineering division
Trained in digital manufacturing activities for new models introduction and process planning at SMC, Japan
EDUCATION
2| Pa
FirstName LastName Operations
COURSE INSTITUTION YEAR REMARKS
Post Graduate Management Program ABC College of Management & Research, Mumbai2016 Pursuing
Bachelors in Business Administration Prestige Institute of Management & Research, Indore200766.00%
ACADEMIC PROJECTS
<This is the space where you will add all your course work. A strong section here will show that you have used
the MBA well. It is also the most critical section to bring out your interest in a stream that is not directly
aligned with your work ex. Should include atleast 3 project aligned to your area of interest>
EXTRA-CURRICULAR ACTIVITIES
<Include any clubs that you are a part of in MBA>
<Include B-School competitions you have won>
<Bring out the extra dimensions in your life here to add new flavours to your resume>
3| Pa