Work Order No. : GPC-3147883 PM For PULLING WELL RIG COOPER # 4 LTO-250 (Onshore). Start date: 1/21/2022
Job Plan : JP-ON-RIG-2M Job Plan for RIG Two Month (ONSHORE).
GPC Oper. GPC Maint EMC Date Completed GPC Opearion GPC Maintenance GPC Approval
intiate Iniate
Page 1 of 6
Egyptian Maintenance Company
GPC - Ras Ghareb District
WO.PARENT:
For Rigs Project
PM
250.00 Check All Forward and Reverse Speed Are Functioning Well. 0.00
260.00 Check Main Pressure Reading. 0.00
270.00 --------------------------- Carrier ----------------------------- 0.00
280.00 Check Right Angle Gearbox Oil Level / Add If Necessary. 0.00
290.00 Check Propeller Shaft Condition. 0.00
300.00 Grease Propeller Shaft Universal Joint. 0.00
310.00 Grease Main Drum Bearing. 0.00
320.00 Check Main Drum Clutch For Proper Engagement. 0.00
330.00 Grease Main Drum Idler Wheel Bearing. 0.00
340.00 Check Main Drum Chain Case Oil Level / Add If Necessary. 0.00
350.00 Check Main Drum Chain Links. 0.00
360.00 Check Main Drum Brake System For Proper Operation. 0.00
370.00 Check Main Drum Wire Rope Condition. 0.00
380.00 Grease Sand line Bearing. 0.00
390.00 Check Sand line Chain Links. 0.00
400.00 Check Sand line Chain Case Oil Level Add If Necessary. 0.00
410.00 Check Sand line Brake System For Proper Operation. 0.00
420.00 Check Sand line Wire Rope Condition. 0.00
430.00 Check Sand line Cathead Condition / Perform Any Required Repair. 0.00
440.00 Grease Cathead Bearing. 0.00
450.00 Check Raising Cylinder Pin. 0.00
460.00 Check Raising Cylinder Pin Holes. 0.00
470.00 Check Screw Jack Bolt. 0.00
480.00 Check Screw Jack Nut. 0.00
490.00 Check Telescoping Cylinder Pin. 0.00
500.00 Check Telescoping Cylinder Hole. 0.00
510.00 Check Cathead Condition. 0.00
520.00 Grease Cathead Bearing. 0.00
530.00 Check Cathead Chain. 0.00
540.00 Check Cathead Chain Oil Level. 0.00
550.00 Check Hydraulic Oil Tank Level. 0.00
560.00 Clean Hydraulic Filter. 0.00
570.00 Check Hydraulic Pump Pressure. 0.00
580.00 Check Hydraulic Pump Clutch For Proper Operation. 0.00
590.00 Check Hydraulic Piping / Hoses. 0.00
GPC Oper. GPC Maint EMC Date Completed GPC Opearion GPC Maintenance GPC Approval
intiate Iniate
Page 2 of 6
Egyptian Maintenance Company
GPC - Ras Ghareb District
WO.PARENT:
For Rigs Project
PM
GPC Oper. GPC Maint EMC Date Completed GPC Opearion GPC Maintenance GPC Approval
intiate Iniate
Page 3 of 6
Egyptian Maintenance Company
GPC - Ras Ghareb District
WO.PARENT:
For Rigs Project
PM
GPC Oper. GPC Maint EMC Date Completed GPC Opearion GPC Maintenance GPC Approval
intiate Iniate
Page 4 of 6
Egyptian Maintenance Company
GPC - Ras Ghareb District
WO.PARENT:
For Rigs Project
PM
Remarks :
PM Status
Comp Cancel Hold
Technical Report :
GPC Oper. GPC Maint EMC Date Completed GPC Opearion GPC Maintenance GPC Approval
intiate Iniate
Page 5 of 6
Egyptian Maintenance Company
GPC - Ras Ghareb District
WO.PARENT:
For Rigs Project
PM
GPC Oper. GPC Maint EMC Date Completed GPC Opearion GPC Maintenance GPC Approval
intiate Iniate
Page 6 of 6