As-Is Document
SIGN-OFF SHEET
Date of
# Position Approver’s Full Name Signature
Approval
From Saif Powertec
From arodek
VERSIONING SHEET
Date of
Version Description of Changes Owner
Changes
1.0 14.05.2019 Initial draft version verified by Abhisek Bose Subrata Saha
Contents
1 Introduction .................................................................................................................................. 4
2 Business Process Goals and Objectives ......................................................................................... 4
3 Glossary ........................................................................................................................................ 5
4 General Description of Business Process ...................................................................................... 5
1 Introduction
SAIF POWERTEC LIMITED is the registered & converted to a Private Limited Company in 2003,
previously it was SAIF Powertec Corporation. SAIF initiated its business for sales & service of
Construction, material handling & Power Generation equipment in Bangladesh through exclusive
Agreements with the world renowned Manufacturers.
1. E-Engineering Ltd.
They have business activity of port operation for complete terminal operation of Chittagong Port
Authority (CPA), Pangaon ICT and Kamalapur ICD (KICD). In CPA they had been appointed for
complete Terminal Operation as Terminal Operator for Chittagong Container Terminal (CCT) & 2
Berths of New Mooring Container Terminal (NCT).
This document shall explain the current process based on our discussion with Saif Powertec-Port
management team and our experience in similar industry.
OBJECTIVE:
SOP- solution allows you to have an integrated view of all your Business Processes and other
sub-processes which further allows efficiency and effectiveness in achieving your business goals.
Goals:
All Business processes and sub-processes are integrated into a single unified system.
A SOP-solution provides you Productivity, efficiency, effectiveness in Business plans.
It Reduce the response time due to the effective transfer of Information.
The main goal -SOP is to create standard operating procedures for managing the equipment
maintenance in KICD.
3 Glossary
Term Definition or Meaning
SOP Standard operating process is a process of streamline the
individual Business Processes and integrating with each
other wherever essentially required.
KICD Kamalapur ICD
A. Equipment Maintenance
They maintain all equipment to achieve the best performance on it
They do plan maintenance and breakdown maintenance
In planned maintenance, they schedule for each equipment
In case of emergency maintenance and corrective maintenance, field staff report to
management first
Maintenance Management do investigation and analyse the fault of the system.
If any spare parts require to resolve the issue, check stock otherwise purchase from local
market. If foreign purchase requires, create purchase requisition.
After receiving the spare parts (local and imported), they complete the repairing work and
submit the equipment to ops team.
For each equipment maintenance, they create Job Card
On the basis of Hr/Mileage, they perform planned maintenance and also perform routine
check each time before and after using an equipment