You are on page 1of 2

PROJECT TITLE: NEW NAVAL BASE PROJECT/NPP0050 Manufacturer: AL BIDDA SWITCHGEAR

Name of Substation/Panel : NB-UTS-LVS-0002 ( UTILITY BUILDING )

INSPECTION AND TESTING OF ENERGY METER

A) GENERAL POWER METER DATA:


PARAMETER DESCRIPTION
Model
Make
Panel Detail
Serial Number
Auxiliary Voltage [Uaux] [V] (AC)
Type
CT Ratio
VT Ratio
Class

B) GENERAL CHECK LIST & INSPECTION:


Kind of Check Remarks
Visual check of external wiring
Check of meter earthing
Check of current transformer circuits
Check of Voltage transformer circuits

1. CURRENT MEASREMENTS:

Phase in Which Injected Current Primary Current Read on Power Monitoring System (PMS)
Current is injected in Sec ( A) IL1 IL2 IL3 ILo
(A)
R-N 5.0
Y-N 5.0
B-N 5.0
R-Y-B 5.0

SUB CONTRACTOR : AYT CONTRACTOR: QBC PMC: REQ


Signatur Signatur Signatur
eName eName eName
Date Date Date
PROJECT TITLE: NEW NAVAL BASE PROJECT/NPP0050 Manufacturer: AL BIDDA SWITCHGEAR
Name of Substation/Panel : NB-UTS-LVS-0002 ( UTILITY BUILDING )

B. VOLTAGE: 415/110 V

Phase in Which Injected Current Primary Voltage Read on Power Monitoring System in Volt
Current is injected in Sec ( V) (PMS)
(V) V1 V2 V3 Vo
R-N 63.5
Y-N 63.5
B-N 63.5
R-Y-B 110

C. POWER MEASUREMENT:

Injected Injected I Phase Power Measured


Voltage Current shift kW KVAR kVA Pf
5 A - 3 Phase 0°
5 A - 3 Phase 45°
5 A - 3 Phase 90°
63.51 V- 5 A - 3 Phase 135°
3 Phase 5 A - 3 Phase 180°
5 A - 3 Phase 225°
5 A - 3 Phase 270°
5 A - 3 Phase 335°

D. REMARKS:
Energy meter Found Healthy : YES / NO

SUB CONTRACTOR : AYT CONTRACTOR: QBC PMC: REQ


Signatur Signatur Signatur
eName eName eName
Date Date Date