PROPOSAL OF MODIFICATION SLAB THICKNESS AT TOILET AREA

BEAM PLAN
ORIGINAL DESIGN PROPOSAL DESIGN
SLAB PLAN
ORIGINAL DESIGN PROPOSAL DESIGN
LIVE LOAD, SDL LOAD, & BATA LOAD
IMMEDIATTED ELASTIC DISPLACEMENT (1DL+1LL+1SDL)
ORIGINAL DESIGN PROPOSAL DESIGN
LONG TERM DISPLACEMENT (CONSIDERED CREEP & SHRINKAGE)
ORIGINAL DESIGN PROPOSAL DESIGN
DISPLACEMENT (1.2DL +1.6LL)
ORIGINAL DESIGN PROPOSAL DESIGN
MAIN REBAR WIREMESH M8-150 (FY=500 Mpa)
ADDITIONAL EXTRA REINFORCEMENT SLAB + (WIREMESH M8 -150) (LONGTERM CASE)
ORIGINAL DESIGN PROPOSAL DESIGN
REBAR PLAN (COMB 1.2DL+1.6LL)
ORIGINAL DESIGN PROPOSAL DESIGN
ADDITIONAL SECONDARY BEAM REINFORCEMENT (B400X180)
ORIGINAL DESIGN PROPOSAL DESIGN
ADDITIONAL SECONDARY BEAM REINFORCEMENT (B400X180)
ORIGINAL DESIGN PROPOSAL DESIGN
ADDITIONAL EXTRA REINFORCEMENT SLAB + (WIREMESH M8 -150) (COMB = 1.2DL+1.6LL)
ORIGINAL DESIGN PROPOSAL DESIGN
REBAR PLAN (COMB 1.2DL+1.6LL)
ORIGINAL DESIGN PROPOSAL DESIGN