3P Lift Lobby
Project :
Quotation :2.3 P Lift lobby
Date: 15th Feb 2021
ITEM ITEM DESCRIPTION QTY UNIT RATE (USD) AMOUNT (USD)
Level 28 Area B Lift Lobby
1 FLOOR FINISHES
2 Supply and laying of 20mm thick travertine stone finish in lift lobby 35 m2 96.74 3,385.89
floors including approved adhesive all in accordance with the
specifications code 312 and drawing ref, detail 2 on ID4.3.02 ,
ID2.3C.04.
-
3 Supply and fixing of travertine stone threshold on floor including -
approved adhesive all in accordance with the specifications code 312
and drawing ref, detail 2 on ID4.3.02, ID2.3C.04.
-
9 Supply and fixing of 150mm high, 20mm thick travertine stone finish -
skirting including approved adhesive all in accordance with the
specifications code 312 and drawing ref. detail 3 on ID4.3.02,
ID3.03.00/01/02.
10 To masonry walls 25 m 18.14 453.47
11 To timber panel walls 19 m 18.14 344.64
-
12 WALL FINISHES -
13 Supply and installation Natural teak veneer timber panel with 3mm 23 m2 30.23 695.32
thick groove line and 20x50mm solid timber edge finish to the wall
including all necessary fixings and fittings all in accordance with the
specifications code 501 and drawing ref. detail 4 on ID4.3Bb.01,
ID2.3C.05, ID3.3C.00/01
-
14 Supply and installation Dark stain teak strip panel finish to the wall 51 m2 30.84 1,572.62
including all necessary fixings and fittings all in accordance with the
specifications code 502 and drawing ref. detail 3 on ID4.8.01,
ID2.3C.05, ID3.3C.00/01
-
15 Supply and installation of Roselle bambu 851 wall covering with 66 m2 21.16 1,396.68
approved backing to internal walls including for cleaning dust and
preparing wall suitable for laying wall paper all in accordance with the
specifications code 211 and drawing ref. ID2.03.05, ID3.03.00/01/02.
-
16 Supply and installation of 20mm thick, 305mm wide marble stone 46 m 15.72 723.13
polish finish architrave to wall including grouting all in accordance
with the specifications code 307 and drawing ref. detail 3
onID4.3Bb.01
-
17 CEILING FINISHES -
18 Supply and installation of suspended plaster flat ceiling including 41 m2 23.58 966.79
forming reveals and returns all in accordance with the specifications
code 600 and drawing ref detail 1 on ID4.3.00, ID2.03.02.
Page 1 of 2
Construction of ITC HOTELS FINISHES PACKAGE ID2.3P Lift Lobby
Project :
Quotation :2.3 P Lift lobby
19 Supply and installation of suspended plaster ceiling bulkheads with -
necessary framing all in accordance with the specifications code 600
and drawing ref, detail 1 on ID4.3.00, ID2.03.02.
-
33 Lift Cladding -
34 Stainless steel cladding to lift car doors 5 sets -
-
Total 12,524.16