Professional Documents
Culture Documents
TOTAL 11530.599554
Construction of ITC HOTELS FINISHES PACKAGE (2f)
Project :
Quotation :GRB 1
Date: 15th Feb 2021
ITEM ITEM DESCRIPTION QTY UNIT RATE AMOUNT
(USD) (USD)
FLOOR FINISHES
Page 2 of 5
Construction of ITC HOTELS FINISHES PACKAGE (2f)
-
4 To walls 38.00 m2 21.16 804.15
-
Supply and fixing of glass window panel, consisting of -
glass panel, timber panel (code 502), timber frame (code
502) including necessary fixings, fittings and finishes all in
accordance with the specifications and drawings ref.
ID213.05, ID2.13.07/08 and ID4.13.10.
-
5 Glass window panel, Overall size 2800mm long x 2700mm 1.00 No 685.64 685.64
high (Excluding door)
-
6 Glass window panel, Overall size 796mm long x 2700mm 2.00 No 193.48 386.96
high
-
Supply and fixing of curtain including necessary fixings -
and fittings all in accordance with the specifications and
drawings ref. ID213.05 and ID2.13.07 detail 04.
-
7 Curtain, Overall size 4240mm long x 2700mm high 4.00 No 544.16 2,176.64
-
-
-
-
-
To Collection - 4,053.39
Page 3 of 5
Construction of ITC HOTELS FINISHES PACKAGE (2f)
-
8 Cloak room 6.00 m2 5.44 32.65
-
9 Entrance area 5.00 m2 5.44 27.21
-
10 Green room 17.00 m2 5.44 92.51
-
-
11 50mm reveals 27.00 m 6.05 163.25
12 100 mm high bulkhead. 13.00 m 7.86 102.18
13 Cornice in paint finish (Paint measured separately) 13.00 m 9.67 125.76
14 Window pelmet - W200 x H150mm 4.24 m 15.12 64.09
15 Painting Works -
16 Painting to 50mm high bulkhead 27.00 m 1.21 32.65
17 Painting to 100 mm high bulkhead . 13.00 m 1.21 15.72
18 Painting to cornice 13.00 m 1.81 23.58
19 Painting to Window pelmet - W200 x H150mm 4.24 m 1.81 7.69
To Collection 687.29
Total 9,293.49
Page 4 of 5
Construction of ITC HOTELS FINISHES PACKAGE (2f)
Project :
Quotation :GRB 2
Date: 15th Feb 2021
RATE
ITEM ITEM DESCRIPTION QTY UNIT AMOUNT (USD)
(USD)
Cloak Cupboard
Dresser cupboard, Overall size 2425mm long x 600mm wide x 1.00 No 2,237.11 2,237.11
1
2700mm high
Page 5 of 5