COMPLETION DRAWING OF PUMP HOUSE COLUMN

4 SIDES M30 BEAM 400X400 MM


TOP & BOTTOM STEEL 3-TOR16
STIRRUPS TOR8 @ 200 C/C

M30 COLUMN 400X400 MM


MAIN STEEL 8-TOR16
STIRRUPS TOR8 @ 225 C/C

A A'

3 SIDES M30 BEAM 230X300 MM


M30 BEAM 400X750 MM TOP & BOTTOM STEEL 3-TOR16
TOP & BOTTOM STEEL 4-TOR16 STIRRUPS TOR8 @ 200 C/C
STIRRUPS TOR8 @ 150 C/C

4 SIDES M30 BEAM 230X300 MM


TOP & BOTTOM STEEL 3-TOR16
STIRRUPS TOR8 @ 200 C/C

4 SIDES M30 BEAM 230X300 MM


TOP & BOTTOM STEEL 3-TOR16
STIRRUPS TOR8 @ 200 C/C

COMBINED FOOTING 5.0X5.0X0.8M


TOR16 @ 175MM C/C @ TOP &
BOTTOM BOTH WAYS

100mm thk
M7.5 PCC

L-SECTION

NOTES
1. ALL DIMENSIONS & LEVELS ARE IN METERS, UNLESS SPECIFIED
OTHERWISE.

K. S. POWAR
Project Name :- Construction of rain water harvesting reservoir at JNPP site,
SECTION A-A' village madban, rajapur taluka, district ratnagiri.

Drawing Name :- Completion Drawing of Pump House Column

Drawing prepared by :- Akshay Powar NPCIL CE Sign :-


Date :- Date :-

Contract Sign :- NPCIL ENC Sign :-


Date :- Date :-