Indonesian Policy of Supplying Natural Gas & LNG for

Power, Industries & Shipping


IGN Wiratmaja
Director General of Oil & Gas – Ministry of Energy & Mineral Resources
6th Annual LNG Transport, Handling & Storage Forum 2016
Bali, 14 September 2016 1
1
Kementerian ESDM Republik Indonesia
INDONESIA AS A MARITIME COUNTRY

+ 5,000 km
2
2
Kementerian ESDM Republik Indonesia
1. Indonesia Oil & Gas Balance

3
3
Kementerian ESDM Republik Indonesia
PROYEKSI PRODUKSI GAS BUMI 2015 – 2050
dalam MMSCFD

4
4
Kementerian ESDM Republik Indonesia
NERACA GAS BUMI INDONESIA 2015 – 2030
2019
MULAI IMPOR GAS

National Energy Agency Forecast: Gas demand in 2025 will make up to 20% of National Energy Mix (7,134 BOED), or 8,249 BBTUD
5
5
Kementerian ESDM Republik Indonesia
PEMANFAATAN GAS BUMI INDONESIA 2016

LPG Domestik
2.50% Realisasi Penyaluran Gas Pipa untuk Domestik
LNG Domestik Tahun 2016
5.91% 2,000
1,814.76
Kelistrikan 1,800
14.98%
1,600 1,510.91

1,400

Pupuk 1,200 1,136.39


10.50% 1,024.60

BBTUD
LNG Ekspor 1,000 758.76
29.10%
800 718.09

600
321.05
Industri 400
22.10% 206.20
200 8.50
Ekspor Gas Pipa 3.51
3.13 3.78
11.80% -
Kelistrikan Pupuk Industri Lifting Minyak City Gas
Lifting
BBG Transportasi City Gas Minyak
0.06% 0.05% 3.02% Realisasi (BBTUD) Kontrak

Status s.d. Mei 2016

6
6
Kementerian ESDM Republik Indonesia
NATIONAL OIL & GAS DEMAND & PRODUCTION
In mboepd 15 Years
AVE CAGR
In 2015 the gap between national supply and demand begins. OE Production

4%
5.500

5.000 5.315
4.550
4.500
+4% 3.950
4.000

3.500 3.270

3.000 2.600
2.500 2.270 2.230 2.195 2.190
2.000 2.190 1.810
2.025 2.065 2.120
1.500
1.435
1.000 1.085
785
500 535
0
2012 2013 2014 2015 2020 2025 2030 2040 2050
National Supply National Demand
7
source : ESDM, SKK Migas, Upstream Team Projection | 4 7
Kementerian ESDM Republik Indonesia
NATIONAL GAS DEMAND & PRODUCTION
In mmscfd
15 Years
In 2021 the gap between national supply and demand begins. CAGR Average

Industry (98,26%)
7%
Household (0,11%)
Gas
Consumption Commercial (1,34%)
Transportation (0,29%)

18.000 16.300
16.000
+7% 13.600
14.000
11.300
12.000
10.000 9.100
8.165 8.130 8.145 8.110
8.000 7.000
5.700
6.000 5.800
3.640 3.650 3.910 3.995
4.000 4.100
3.400
2.500
2.000
0
2012 2013 2014 2015 2020 2025 2030 2040 2050
National Supply National Demand 8
source : ESDM, SKK Migas, Upstream Team Projection | 8
Kementerian ESDM Republik Indonesia
2. Gas Infrastructure Development

9
9
Kementerian ESDM Republik Indonesia
Infrastruktur Gas Bumi Existing & Rencana
EXISTING

ROADMAP
2016 – 2030
KEBUTUHAN INVESTASI
(Miliar USD)
Liquefac SPBG +
Pipa tion CNG
12 25.6 1.93 TOTAL
Regasific
ation Jargas LPG
48.2
6.1 2.2 0.4 10
10
Kementerian ESDM Republik Indonesia
VIRTUAL PIPELINE CLUSTER CONCEPT
CLUSTER II (MALUKU) CLUSTER I (PAPUA)
• Pembangkit 130 MMSCFD [875MW]
• Pembangkit 138M MSCFD [630 MW]
• Smelter 100 MMSFD
• Industri 288 MMSCFD
• Industri 55 MMSCFD
• Rumah Tangga 1 MMSCFD
• Rumah Tangga 1 MMSCFD
CLUSTER II (MALUKU)

CLUSTER IV (NATUNA) CLUSTER I (PAPUA)

CLUSTER IV (NATUNA)
• Pembangkit 49 MMSCFD [495 MW]

• Rumah Tangga 1 MMSCFD

CLUSTER III (NUSA TENGGARA)


• Pembangkit 183 MMSCFD [1750 MW]

• Smelter 100 MMSCFD


CLUSTER III (NUSA TENGGARA)
• Rumah Tangga 1 MMSCFD

Cluster I  Papua dan Papua Barat


Cluster II  Maluku, Maluku Utara, Sulawesi Utara, Sulawesi Tengah
Cluster III  Nusa Tenggara Timur, Nusa Tenggara Barat, Sulawesi Selatan
Cluster IV  Natuna dan Kalimantan Barat

11
11
Kementerian ESDM Republik Indonesia
CLUSTER I (PAPUA)
LNG Vessel : 8000 m3 LNG Vessel : 8000 m3 Primary Hub Jayapura
Frequency : 2 x 2 weeks Frequency : 2 x 2 weeks Total Pembangkit : 11 (250 MW)
Primary Hub Travel : 700 km Gas Demand : 50 MMSCFD
Travel : 1,600 km
Sorong Isotank : 90 Iso/ 2 weeks

Primary Hub
Jayapura

Primary Hub Sorong


Total Pembangkit : 9 (200 MW)
Gas Demand : 46 MMSCFD
Isotank : 144 Iso/ 2 weeks
Total Distance : 2,200 km

Primary Hub
LNG Vessel : 8000 m3
Frequency : 1 x 2 weeks Timika
Travel : 1,000 km

Primary Hub Timika


Pembangkit : 11 (180 MW)
Gas Demand : 41 MMSCFD
Isotank : 180 Iso/ 2 weeks

LNG Vessel : 8000 m3


Frequency : 1 x 2 weeks
Travel : 1,600 km

FSU FSRU
Pembangkit 31 Lokasi Rencana Pembangkit 630 MW Liquefaction Plant PLTGU/MGU
FSRU/FSU/FRU 3 Lokasi PLTG/MG
Secondary Hub/Land based Storage
Land Based Regas 8 Lokasi Kebutuhan Gas 138 MMSCFD
Smelter MPP
12
Iso Tank Regas System 8 Lokasi Land based Regas Terminal Small Vessel Route
12
Kementerian ESDM Republik Indonesia LNG Iso tank Regas System Isotank Barge Route
CLUSTER II (MALUKU)

Primary Hub Manado


Pembangkit : 3 (450 MW)
Gas Demand : 46 MMSCFD
Primary Hub Maba
Isotank : N/A
Primary Hub Pembangkit : 12 (225 MW)
Gas Demand : 147 MMSCFD
Manado Smelter : 1 Plant (100 MMSCFD)
Isotank : 198 EA / 2 weeks

Primary Hub
Maba

LNG Vessel : 8000 m3


Frequency : 1 x 2 weeks
Travel : 580 km LNG Vessel : 8000 m3
Frequency : 1 x 2 weeks
Travel : 1, 000km

Primary Hub Ambon


Pembangkit : 9 Plant (200 MW)
Gas Demand : 32 MMSCFD Primary Hub
Isotank : 255 EA / 2 weeks
Ambon

FSRU
Pembangkit 24 Location Rencana Pembangkit 875 MW
Liquefaction Plant PLTGU/MGU
FSRU/FSU/FRU 3 Location PLTG/MG
Land Based Regas 5 Location Kebutuhan Gas 130 MMSCFD Secondary Hub/Land based Storage
Smelter MPP
13
Iso Tank Regas System 10 Location Kebutuhan Gas Smelter 100 MMSCFD Land based Regas Terminal Small Vessel Route
13
Kementerian ESDM Republik Indonesia LNG Iso tank Regas System Isotank Barge Route
CLUSTER III (NUSA TENGGARA)

Primary Hub Makassar


Pembangkit : 2 (900 MW)
Gas Demand : 36 MMSCFD
Primary Hub LNG Vessel : 8000 m3
Isotank : N/A
Pomala Frequency : 2 x 2 weeks
Travel : 620 km

Primary Hub
Makassar
Primary Hub Pomala
Pembangkit : 8 (145 MW)
Gas Demand : 34 MMSCFD
Smelter : 1 Plant (100 MMSCFD)
Isotank : 126 Iso/ 2 weeks

Primary Hub
Lombok

Primary Hub Lombok


Pembangkit : 10 (490 MW)
Gas Demand : 79.5 MMSCFD
Isotank : N/A

LNG Vessel : 8000 m3


Frequency : 4 x 2 weeks
Travel : 1,400 km Primary Hub
Kupang Primary Hub Kupang
LNG Vessel : 8000 m3 Pembangkit : 10 (215 MW)
Frequency : 2 x 2 weeks Gas Demand : 34 MMSCFD
Travel : 750 km Isotank : 162 Iso/ 2 weeks

FSRU
Pembangkit 30 Location Rencana Pembangkit 1,750 MW Liquefaction Plant PLTGU/MGU
FSRU/FSU/FRU 4 Location PLTG/MG
Kebutuhan Gas 183 MMSCFD Secondary Hub/Land based Storage
Land Based Regas 12 Location Smelter MPP
14
Iso Tank Regas System 7 Location Kebutuhan Gas Smelter 100 MMSCFD Land based Regas Terminal Small Vessel Route
14
Kementerian ESDM Republik Indonesia LNG Iso tank Regas System Isotank Barge Route
CLUSTER IV (NATUNA)

LNG Vessel : 8000 m3


Frequency : 1 x 2 weeks
Travel : 475 km

Primary Hub
Pontianak

Primary Hub Pontianak


Pembangkit : 5 (495 MW)
Gas Demand : 49 MMSCFD

Pembangkit 5 Location FSRU


Rencana Pembangkit 495 MW PLTGU/MGU
Liquefaction Plant
FSRU/FSU/FRU 1 Location
Secondary Hub/Land based Storage PLTG/MG
Land Based Regas 1 Location Kebutuhan Gas 49 MMSCFD
Smelter MPP15
Iso Tank Regas System - Location Land based Regas Terminal Small Vessel Route
15
Kementerian ESDM Republik Indonesia LNG Iso tank Regas System Isotank Barge Route
LNG for Marine Transportation
Based on Indonesian Regulation* LNG – Fueled Ship
(referring to Marine Safety Committee 95,
International Marine Organization):
Sulphur Content for marine fuel must not exceed 3,5% m/m** before
January 1st 2020 and 0,5% m/m after January 1st 2020

Existing Ships in Indonesia Existing Ports in Indonesia


Passenger Ship 535 Commercial Ports 112
Cargo Ship 20,346 Non-Commercial Ports 1,129
Fishing Ship 16,028 Special Purpose Terminals 1,045
Total 36,909 Total 2,289

LNG for Marine Potential

Commercial Ports
Commercial Shipping Route
Pioneer Shipping Route
*) Transportation Ministerial Regulation No. 29 / 2014 about Maritime Environment Pollution Prevention 16
**) m/m: microgram/mililiter 1616
Kementerian ESDM Republik Indonesia
GAS INFRASTRUCTURE ROADMAP 2016 – 2030 *)
Period I Period II Period III
No. URAIAN
Existing 2016 2017 2018 2019 2020 2021 – 2025 2026 – 2030
Open Access 3,665 6,153 6,153 6,215 6,776 7,390 9,604 12,580
Upstream Dedicated 4,110 4,123 4,123 4,123 4,123 4,123 4,123 4,123
1 Pipeline [KM]
Downstream Dedicated 4,213.54 9,177 9,211 9,431 11,546 11,546 13,480 13,584
Own Use 46 66 66 66 66 66 66 66
Large Plant 2 4 5 5 5 5 6 6
2 Liquefaction [UNIT]
Mini Plant 0 3 5 7 7 9 10 12
Regasification FSRU 2 2 5 9 10 11 11 12
3
[UNIT] Land based 1 17 24 46 62 64 66 68
CNG Application Inland 14 68 72 72 106 108 108 161
4
[UNIT] Marine 2 4 6 9 12 15 20 30

GAS FUELING CNG 84 136 163 189 210 289 800 1,300
5 STATIONS
LNG 0 0 0 0 2 4 7 12
[UNITS]
LGV 27 27 77 80 100 120 200 400
Distribution Network Area
6 0 8 12 16 20 25 75 150
[AREA]
7 City Gas 924 1.308 1.5
197K 326K 608K 3 million 5 million
[CONNECTION] million million million

8 LPG Plant [MTPA] 4,594 4,754 4,754 4,755 4,755 4,755 6 7


9 LPG Storage [MT] 486K 500K 510K 492K 530K 540K 620,000 800,000

*) cumulative total

17
17
Kementerian ESDM Republik Indonesia
Closing Remarks
• Supply & demand gap for natural gas will start in 2019 in which
Indonesia will start importing gas.

• Until 2025, there will be surplus & deficit of LNG Cargo. This calls for a
strategy to manage supply and demand of LNG.

• The gas infrastructure roadmap until 2030 needs US$ 48.2 billion of
investment.
• Virtual pipeline will supply gas using shipping routes in 4 clusters, in
which key components for successful virtual pipeline implementation:
State Owned Enterprise, PLN, experienced companies, & local content.

• Current challenge: formulating gas prices to stimulate economic


growth.

• Acceleration of regulatory reform is currently under progress to increase


investment attractiveness, simplify permitting processes & promote
safety.
18
18
Kementerian ESDM Republik Indonesia
www.migas.esdm.go.id