Professional Documents
Culture Documents
Proven
Front to end capabilities LNG Platform Led by a team with Team with
to offer operating and Solutions numerous project rollouts on Successful
tailored LNG solutions complex developments
across Indonesia Company involving many stakeholders Track
Record
CONFIDENTIAL 2
LNG Terminals/ Hubs are dispersed - making modular infrastructure
an important factor in LNG distribution across the country
FSRU
Amurang
Teluk Lamong
FSRU Lampung LNG
Ambon Hub
FSRU Cilacap
FSRU Jawa 1 Masela LNG
*Not exhaustive
Legends
• Ministerial Decree 02/2022 (previously 13/2020) on the 33 locations assignment will simultaneously strengthen : Existing liquefaction LNG
Pertamina’s role through PGN in accelerating the development of LNG infrastructure, such as current Pertamina’s
: Planned liquefaction LNG
portfolio in Bontang (Badak LNG), Lampung FSRU, West Java FSRU, and Arun Hub. In addition, Pertamina is currently in
the process of completing the Teluk Lamong LNG Terminal which will maintain gas supply security : Existing FSRU/ Regasification
5000
0
Sumatera Jawa, Madura & Kalimantan Sulawesi Maluku, Papua,
Bali NTB
SAMBERA PROJECT : On-shore LNG Transportation to Sambera and Storage & Regasification
5 Years Contract with BOT scheme for storage/regasification and TOP applied
Off-shore LNG Transportation to Eastern Indonesia, and Storage & Regasification operations
Transportation Challenge :
EXTERNAL
- Volatile weather forecast
- transportation fleet selection
- Loading and unloading efficient Performance Improvement :
SUPPLY CHAIN DESIGN HSE:
- Sufficient LCT capacity - Safe, fastest and sea journey
CONTRACT - Dedicated person monitor the ISO Tanks
- All parties Contract compliance COMMERCIAL:
COMMERCIAL - Minimize the material handling process (e.g., tire, fuel)
- Fuel price increase significantly ON GOING :
- Sudden change order CONFIDENTIAL
- Clarity the BOT Status 6
- Contract completion
Conclusion
• LNG is one of clean energy that can be used to fulfill energy demand in
Indonesia.
• Indonesia is the largest archipelago country and need to have proper, accurate
and efficient for transporting the LNG.
• LNG distribution in eastern Indonesia will become challenge to be developed,
refer to PLN RUPTL in the upcoming five years.
• Small-scale LNG business is a cost sensitive.
• Transportation becomes a very significant cost to contribute in developing LNG
small-scale business in eastern Indonesia.
• contract scheme and operational gas calculations dont work under current
conditions and project proposal from ptgn and pln so the private sector has to
be aware
• Sambera LNG Transportation and Regasification becomes a pioneer, lesson
learnt and use as reference for developing another small-scale LNG business in
Indonesia.
• All out standing discussion in Sambera LNG project and Papua project,
expected to be solved soon, so everybody can have the lesson learnt for future
development in Indonesia.
• Risco is open to synergy.
CONFIDENTIAL 7
Channeling energy into action
CONFIDENTIAL 9
3,736,540
CONFIDENTIAL 10
19,666
CONFIDENTIAL 11
Channeling energy into action