Professional Documents
Culture Documents
OPPORTUNITIES IN
KELANTAN
1
KSEDC ROLE
Social Commercial
Business
Joint Venture
opportunities
Private Financial
Residential units
Initiatives
2
GROUP ACTIVITIES
KSEDC
3
CORPORATE STRUCTURE
KSEDC
KUMPULAN KUMPULAN
PERMODALAN hospitality Technology
PERTANIAN PERLADANGAN Kompleks SPP
KELANTAN information Kelstone
KELANTAN PKINK Perkayuan Development
BERHAD
BERHAD BERHAD Kelantan
Binaraya
Infra Quest ICT Sykt Ladang PKINK
KTC Damai
Convention & Incubator Sg Terah
Centre Profil Impian
Apartment
ASCII Line Kilang Sawit
Tapis Sinaran Pantai
Kelantan
Timur
AR-Rahn ICT
Irama Resort Consortium
Gateway Ladang
Development
Tapis
Hostcare Kijang Kuari
Ladang
Lubok Bongor PKINK Bina
(Kelkon)
Kelmix
UB Consult Prokel KPJ Perdana
Management Urban Specialist
Transformation
Centre (UTC)
INDONESIA
EAST
INDONESIA MALAYSIA
SINGAPORE
6
KOTA BHARU - THE ISLAMIC CITY IN MALAYSIA
7
ECONOMIC INDICATORS
8
GROSS DOMESTIC PRODUCT BY SECTOR ( 2015 )
MINING
1.3%
MYR CONSTRUCTION
1.8 % RM 0.36 Billion
20.6 MANUFACTURING
5.4% RM 1.11 Billion
Billion
SERVICES
66.4 %%
RM 13.68 Billion
9
KELANTAN – MOVING FORWARD STRATEGIC PLANNING
BACKGROUND DETAILS
The strategic plan for The strategic plan is to
Kelantan – Moving ‘Kelantan Moving
Forward’ is a new be implemented in two
Forward’ upholds three (2) phases ;
phase in the state’s (3) main pillars :
administration for 25 ( i) Phase 1 :
years in line with the (i) Blessing 2015 – 2020 (Year)
state’s policy (ii) Prosperity (ii) Phase 2:
‘Developing With Islam 2020 – 2025 ( Year)
(iii) Welfare
10
3 MAIN PILLARS AND 10 CORES
• FINANCIAL STRENGTHENING
PILLAR 2: • SOCIAL ECONOMIC DEVELOPMENT
PROSPERITY •
•
ECONOMY & INVESTMENT
INFRASTRUCTURE & PHYSICAL DEVELOPMENT
11
PILLAR 2 : PROSPERITY
TARGET STRATEGY
13
WHY MUST INVEST IN KELANTAN ?
• Investment Facilitation
GOVERNMENT SUPPORT • Invcentives On Land Lease Period
TOURISM
MANUFACTURING
INFRASTRUCTURE
• Roads / Highway
• Public Housing & Property Development
• Port
15
PASIR MAS HALAL PARK
16
LAYOUT PLAN OF PASIR MAS HALAL PARK
PHASE 1
17
QUICK FACTS - PASIR MAS HALAL PARK
ITEM DESCRIPTION
Food & beverages (F&B), Ingredients Snack, Spices & Sauce
Industry Focus Halal food-based products, Nutraceuticals / herbs Agriculture-
based products, Meat-based products
Location Pasir Mas, Kelantan
Phase 1: 20.23 hectares / 50 acres (Current)Phase 2: 23.47
Total Area
hectares / 58 acres (Future Planning)
Available Area /
12.49 hectares / 30.87 acres
Lot
Land Origin State Economic Development Council
Lease Period 66 years
•Kota Bahru town : 21 km
Accessibility •Kota Bahru Airport : 22 km
•Kuala Lumpur city : 455 km
Infrastructure
Development Infrastructure is ready
Status
18
TOK BALI DEVELOPMENT AREA
Total Development Area 2600 acres of land
Proposed Road Upgrading
Project
Proposed Road
Upgrading Project
factory
SUNGAI TERAH MODERN ISLAMIC CITY
22
NEW TOWN AND MIX-USED DEVELOPMENT IN SG. BAGAN
ESTATE, PULAI CHONDONG, DISTRICT OF MACHANG
23
factory
NEW TOWN AND MIX-USED DEVELOPMENT IN SG. BAGAN
ESTATE, PULAI CHONDONG, DISTRICT OF MACHANG
24
INFRASTRUCTURE: EAST COAST RAILWAY LINK (ECRL)
The Railway Route
25
INFRASTRUCTURE: CENTRAL SPINE ROAD
26
INFRASTRUCTURE: SULTAN ISMAIL PETRA AIRPORT
• Prime Minister announcement RM450 million for upgrading
work under The Eleventh Malaysian Plan
27
DESTINATION FOR CULTURAL & ECO TOURISM IN MALAYSIA
Diverse of Cultural
Activities - Cradle of
Malay Culture
Numbers of nature
attractions - white sandy
beaches , waterfalls ,
tropical forests
28
JOM CLICK KELANTAN
www.kalashop.my
29
THANK YOU
30