Professional Documents
Culture Documents
NA
Issued 2008-08
AUDIT CRITERIA
Revised 2016-08
161Thorn Hill Road
Warrendale, PA 15086-7527 Superseding None
Nadcap
AUDIT CRITERIA FOR HEAT TREATING
for Hot Isostatic Pressing (HIP)
Editorial Change “EC was added” to 13.1.f-.i, 13.6.1, 13.8-13.8.3, 14.1.f-.i, 14.6.1, 14.6.1, 14.8-14.8.3 on 9-Dec-2014
Editorial Change “Format Numbering” to 7.3.1-7.3.2, 11.1.1-11.1.2, 13.1.1-13.1.9, 13.3.1-13.3.6, 13.7.1.-13.7.1.2,
14.1.1-14.1.9, 14.3.1-14.3.6, 14.7.1-13.7.1.2 on 19-May-2016
Editorial Change “Updated NA to Section NA” to 13.2, 13.3, 13.4, 13.5, 13.6, 13.7, 13.8, & 13.9.1-13.9.2, 14.2,
14.3, 14.4, 14.5, 14.6, 14.7, 14.8, & 14.9.1-14.9.2 on 19-May-2016
Editorial Change made to “added job tracker fields” on 11-Aug-2016
1. SCOPE
2. GENERAL INFORMATION:
Pyrometry shall conform to AMS2750 except for TUS and SAT. TUS
shall comply with customer and specification requirements.
PRI operating procedures provide that "This report is published by PRI to advance the state of technical, engineering, and quality
sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent
infringement arising there from, is the sole responsibility of the user."
PRI values your input. To provide feedback on this document, please contact the appropriate commodity staff engineer.
(Contact information is located at http://www.eauditnet.com under “Contact Us”.)
Copyright 2016 Performance Review Institute. All rights reserved.
t-frm-15 04-Jan-2016
PRI AC 7102/6 Revision NA -2-
3. QUALIFICATION
3.1 Are technical instructions for the HIP process approved through YES NO
qualification testing on representative parts/test pieces when required?
3.2 Are technical instructions for the HIP process approved by the YES NO
Supplier’s authorized Quality and /or technical personnel?
3.3 Does the Supplier perform testing as required by the purchase order? YES NO
3.4 Do the technical instructions conform to the applicable part drawing YES NO
and/or customer and specification requirements?
4. EQUIPMENT
4.1 For HIP, are all equipment requirements of AC7102 acceptable, YES NO
excluding SAT and TUS per AMS2750?
4.2 Does the Procedure for verifying the Temperature uniformity of the YES NO
vessel meet customer requirements?
5. CLEANING
5.1 Does the Supplier have the correct equipment to clean the parts as YES NO
required by the approved procedures or a written agreement with the
customer that clearly excludes the Supplier from the responsibility for
cleaning?
6. LOADING
6.1 Do procedures and shop instructions satisfy the requirement for loading YES NO
instructions?
6.2 Do procedures and shop instructions ensure parts are loaded to YES NO
minimize distortion?
6.3 Do procedures ensure the use of clean furnace hardware to avoid YES NO
contamination of parts?
6.4 Where required by the customer, do loading procedures require the YES NO
wearing of clean lint-free or cotton gloves for handling parts?
6.5 Where required by the customer, do loading procedures require product YES NO
to be inspected for contamination during loading?
7. TEMPERATURE CONTROL
7.1 Are temperature uniformity surveys performed per customer and YES NO
specification requirements?
PRI AC 7102/6 Revision NA -3-
7.2 Do TUS procedures state the required temperature tolerance within the YES NO
working volume of the vessel?
7.4 Are temperature sensor readings recorded according to customer and YES NO
specification requirements?
7.6 Do procedures define the start and end of soak with respect to both YES NO
temperature and pressure?
7.7 Do procedures address actions to be taken if the hold time is outside YES NO
the required parameters during the cycle?
7.8 Do procedures state the actions to be taken if there are temperature YES NO
excursions outside the required parameters during the cycle?
7.9 Do procedures state how material is dispositioned when a HIP cycle is YES NO
interrupted or not completed?
7.10 Do procedures state the heat up rate and cool down rate, if applicable? YES NO
8. GAS PURITY
8.1 Does the purchased inert gas meet the customer and specification YES NO
requirements for purity?
8.2 Prior to the start of heating, is the inert gas tested to ensure it meets YES NO
purity requirements?
8.4 Do the analysis system accuracy levels and associated calibration YES NO
procedures meet customer and specification requirements?
9. GAS PRESSURE
9.2 Is gas pressure measured and recorded during the HIP cycle in YES NO
accordance with customer requirements?
9.4 Does the accuracy of the pressure-measuring device meet the YES NO
customer and specification requirements?"
9.5 Does the calibration interval of the pressure-measuring device meet YES NO
customer and specification requirements?
10.1 Do procedures state that test pieces, where required, are to be included YES NO
in the load?
10.2 Do shop instructions or loading procedures specify the positions of test YES NO
pieces when required by customer or specification?
10.3 Do shop instructions specify the quantity of test pieces to be added to YES NO
permit monitoring of each run and/or the stacking level for microporosity
closure, surface integrity, microstructure and mechanical properties
when required by the customer and specification?
11. UNLOADING
11.1 Does the Supplier have an unloading procedure that states actions to
be taken for the following conditions:
11.1.2 Components stuck to the support system (i.e., load cans, divider racks, YES NO
getter material, thermocouples etc)?
12.1 Does the process documentation provided to the customer include all YES NO
required information?
The Auditor shall complete long form and short form job audits based on the Supplier’s heat
treating capabilities. For a Supplier seeking only HIP accreditation, there shall be 2 long jobs
and 8 short job audits of which at least 3 will be live HIP jobs. For a Supplier seeking HIP
accreditation in addition to the Heat Treating, there shall be at least 2 live HIP jobs.
PRI AC 7102/6 Revision NA -5-
The Supplier needs to clearly identify the Export Control status of all
parts being used in the audit. Technical information on parts which
have been designated “Export Controlled – License Required” (EC-LR)
cannot be input into eAuditNet.
13.1.2 Customer:
13.1.3 Subscriber:
13.1.10 (EC) Heat treat and other non-HIP process and test requirements
specified by customer specification (i.e. fixed process approval):
13.2.4 Is the position and number of test samples in accordance with the YES NO NA
requirements ?
Check if used
(EC)
Indicator
Recorder (EC)
(EC)
Multipoint
Load/ (EC)
Monitoring
Thermocouples
PRI AC 7102/6 Revision NA -7-
13.3.8 What is the basis for determining the start and the end of the soak?
Describe:
13.3.9 Does the method for determining the start and the end of soak meet the YES NO
customer requirements?
Describe:
PRI AC 7102/6 Revision NA -8-
List Below:
13.5.3 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this HIP treatment?
13.5.5 Do all steps in the HIP process meet the specified requirement? YES NO
13.5.6 Is there evidence that HIP cycles are reviewed for job traceability, YES NO
correct time at temperature, and pressure?
13.5.7 Is this review performed by QA or other designated personnel and the YES NO
review documented?
13.6.1 Are monitoring thermocouples required for this job either by the YES NO
customer or internal procedure?
13.6.2 Does the usage and placement of monitoring thermocouples conform to YES NO
requirements?
13.7.1 Parameters
13.8 (EC) Additional testing required: (Charpy impact, tensile test, fracture SECTION NA
toughness, metallographic and/or Microhardness tests, etc.)
13.8.1 (EC) Is additional testing required by the specification? If yes describe. YES NO
13.8.2 (EC) Does the shop paper reflect the requirement for additional testing? YES NO
13.9.1.1 Does the certificate of conformance show compliance to all applicable YES NO
drawing, specification and PO requirements including documentation of
any exceptions?
13.9.1.2 Does the certificate list the revision level of the specification to which YES NO
the parts were processed?
13.9.1.4 Is the shop paper verified and accepted by authorized personnel? YES NO
13.9.2.1 Is the shop paper verified and accepted by authorized personnel? YES NO
13.10 Does this job comply with all the requirements? YES NO
PRI AC 7102/6 Revision NA - 10 -
The Supplier needs to clearly identify the Export Control status of all
parts being used in the audit. Technical information on parts which
have been designated “Export Controlled – License Required” (EC-LR)
cannot be input into eAuditNet.
14.1.2 Customer:
14.1.3 Subscriber:
14.1.10 (EC) Heat treat and other non-HIP process and test requirements
specified by customer specification (i.e. fixed process approval):
14.2.4 Is the position and number of test samples in accordance with the YES NO NA
requirements ?
Check if used
(EC)
Indicator
Recorder (EC)
(EC)
Multipoint
Load/ (EC)
Monitoring
Thermocouples
PRI AC 7102/6 Revision NA - 12 -
14.3.8 What is the basis for determining the start and the end of the soak?
Describe:
14.3.9 Does the method for determining the start and the end of soak meet the YES NO
customer requirements?
Describe:
PRI AC 7102/6 Revision NA - 13 -
List Below:
14.5.3 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this HIP treatment?
14.5.5 Do all steps in the HIP process meet the specified requirement? YES NO
14.5.6 Is there evidence that HIP cycles are reviewed for job traceability, YES NO
correct time at temperature, and pressure?
14.5.7 Is this review performed by QA or other designated personnel and the YES NO
review documented?
14.6.1 Are monitoring thermocouples required for this job either by the YES NO
customer or internal procedure?
14.6.2 Does the usage and placement of monitoring thermocouples conform to YES NO
requirements?
PRI AC 7102/6 Revision NA - 14 -
14.7.1 Parameters
14.8 (EC) Additional testing required: (Charpy impact, tensile test, fracture SECTION NA
toughness, metallographic and/or Microhardness tests, etc.)
14.8.1 (EC) Is additional testing required by the specification? If yes describe. YES NO
14.8.2 (EC) Does the shop paper reflect the requirement for additional testing? YES NO
14.9.1.1 Does the certificate of conformance show compliance to all applicable YES NO
drawing, specification and PO requirements including documentation of
any exceptions?
14.9.1.2 Does the certificate list the revision level of the specification to which YES NO
the parts were processed?
14.9.1.4 Is the shop paper verified and accepted by authorized personnel? YES NO
PRI AC 7102/6 Revision NA - 15 -
14.9.2.1 Is the shop paper verified and accepted by authorized personnel? YES NO
14.10 Does this job comply with all the requirements? YES NO