SPM CONTROLS

SPM CONTROLS

REF : SPM-086-P/21-22
DATE: 18/03/2021

To
M/s.

Kind Attn: Mr. Arun Chaturvedi

Dear Sir,

As desired by you, we are enclosing herewith our Techno commercial Lowest


proposal for 1000 MT (1100 UST), Aluminium Extrusion Press.

We hope our offer is in line with your requirement.

Best Regards,

Laxman S. Sawant
Cell No.: 09845448718

……2……

R.S. No.686/1/A/2, UDYAMBAG, BELGAUM-590 008.


Tel. 0831-2441001/ 4206720, E-mail: spmcontrols@rediffmail.com website: www.spmcontrols.com
SPM CONTROLS
SPM CONTROLS
REF : SPM-086-P/21-22 (2)
DATE : 18/03/2021

Established in 1994 SPM CONTROLS is the leader in Aluminium Extrusion Presses &
Other equipments / machineries for Aluminium Extrusion Plant /s.

SPM’s Innovative design has delivered quality product by using advance technology &
precision manufacturing processes & machineries.

SPM’s simplified /Advance systems in Hydraulics & Electrical, Electronics support to


clients, makes the machines user friendly.

Annexure-I

1000 MT ALUMINIUM EXTRUSION PRESS -

Image is indicative

.…3…..

R.S. No.686/1/A/2, UDYAMBAG, BELGAUM-590 008.


Tel. 0831-2441001/ 4206720, E-mail: spmcontrols@rediffmail.com website: www.spmcontrols.com
SPM CONTROLS
SPM CONTROLS
REF : SPM-086-P/21-22 (3)
DATE : 18/03/2021

K E Y P O I NTS :

* Single Piece Forged Main Cylinder Tube C35 separately machined & fitted in C35
material Cross head. Moving Cross Head - C 35 forged.

* End Platen C35 forged.

* Online Internet support system in PLC programme for fault findings & error
solutions.

* pre stretched tie rod- pre compressed column design ensures very high life of the
machine & Dies.

* Front platen made out of forged steel increases life of Dies & Toolings also.

* Duel Cassette type Die station with push through hole.

* Automatic Lubrication System.

* Internationally reputed / Branded components of Hydraulics & Electrical, Electronic


makes easy availability anywhere.

* Single size Logic valves & Directional control valves, minimizes spare list.

* Electrical motors (IE2 Class) along with variable frequency Drive (VFD) to main motor.

* Resistant Heaters in Container jacket.

* International reputed make high volume / high flow capacity PHE for oil cooling
provides much better oil cooling.
…..4…..

R.S. No.686/1/A/2, UDYAMBAG, BELGAUM-590 008.


Tel. 0831-2441001/ 4206720, E-mail: spmcontrols@rediffmail.com website: www.spmcontrols.com
SPM CONTROLS
SPM CONTROLS
REF : SPM-086-P/21-22 (4)
DATE : 18/03/2021

SPM 1000 MT Aluminium Extrusion.

Features – Automatic operation- Oil Hydraulic based Horizontally operated machine.

MAJOR TECHNICAL SPECIFICATIONS

Capacity @ Full tonnage 1000 MT

Capacity @ Low tonnage 870 MT

Billet Size - Dia x Length Ø 127 x 600 mm (max. 630 mm)

Container Length 650 mm

Main Ram Ø 710 mm

Auxiliary Cylinder Ø 180 x 2 Nos.

Container Cylinder Ø 150 x 4 Nos.

Operating Pressure 220 Kg/cm²

Billet upsetting capacity 112 MT

Container Sealing capacity 80 MT

Container stripping 155 MT

Discard Shear capacity 28 MT

Theoretical Speeds:-
Extrusion Speed 14.3 mm/sec. (Infinitely variable through
VFD - to all main motors)
Dead cycle Time including Burp cycle 18 sec. ± 5 %

Die stack size Ø 280 x 280 mm long

Tooling Flower design size 170 x 190 mm

…..5….
R.S. No.686/1/A/2, UDYAMBAG, BELGAUM-590 008.
Tel. 0831-2441001/ 4206720, E-mail: spmcontrols@rediffmail.com website: www.spmcontrols.com
SPM CONTROLS
SPM CONTROLS
REF : SPM-086-P/21-22 (5)
DATE : 18/03/2021

Container Heating Capacity 24 kw

Container temperature to maintain 380 to 430 °C

Oil Tank Capacity 4000 Liters

Approximate overall size (lxwxh) 11000 x 4000 x 4500 mm

HYDRAULIC PUMPS

Main Pumps (2 Nos.) A2FO200 Rexroth (Germany) make 2 Nos.


Fixed Displacement Pumps.

Auxiliary Pumps (Low pressure) Vane Pump - Veljan/Kujan/ Yuken make -2 Nos.

Directional Control Valves

High Pressure Rexroth / Atos make

Low Pressure Yuken make

ELECTRICAL MOTORS

Main Motors 75 Kw- 6P- 2 Nos. ABB / Siemens / BB / CG make

Auxiliary Motors 11 kw – 1 No. BB/HM make

5.5 kw -1 No. BB/HM make .

…..6…..

R.S. No.686/1/A/2, UDYAMBAG, BELGAUM-590 008.


Tel. 0831-2441001/ 4206720, E-mail: spmcontrols@rediffmail.com website: www.spmcontrols.com
SPM CONTROLS
SPM CONTROLS
REF : SPM-086-P/21-22 (6)
DATE : 18/03/2021

CONSTRUCTIONAL DETAILS:

Main Cylinder tube C 35 Forged steel


(Single piece with collar)

Main Ram Chilled Cast Iron

End Platen C 35 Steel

Cylinder Crosshead C 35, Steel

Container Jacket Forged steel

Container Liner H 13, forged Hot die steel

Fixed Dummy H 13 forged Hot die steel

Stem H13 forged Hot die steel

* The Single Piece design of main Cylinder assembly, forged Main Cylinder Tube
fitted in cross head.

…..7….

R.S. No.686/1/A/2, UDYAMBAG, BELGAUM-590 008.


Tel. 0831-2441001/ 4206720, E-mail: spmcontrols@rediffmail.com website: www.spmcontrols.com
SPM CONTROLS
SPM CONTROLS
REF : SPM-086-P/21-22 (7)
DATE : 18/03/2021

GUIDES
- Bronze wear shoes of Moving crosshead & container holder
travels over Hardened wear resistant (imported) Guide ways
fitted at lower column.

- Adjustment in both direction vertical & Horizontal is provided


for proper alignment.

- To ensure perfect alignment of container with Main Ram travel


static position- measuring sensor are provided at container holder.

- Adjustable ‘V’ Guide at upper columns to moving crosshead &


container holder, provided additional stability to alignment.

DISCARD SHEAR WITH BUTT KNOCKER


- Mild steel fabricated structure.
- Shear blade fixed slide guided by adjustable bronze wear plates
- To maintain Shear blade distance from die face pad is provided at blade
- Butt knocker cylinder knocks the butt.
- Auto lubrication for wear/Guide Plates.
- Mechanically self locking system ensures die position during butt shearing.

DIE STATIONS
Cassette type two independent station are provided to ensure
pre-loading of next die in idle die station, during extrusion cycle
of running die.

The position changing is done automatically whenever required.

…..8…..
R.S. No.686/1/A/2, UDYAMBAG, BELGAUM-590 008.
Tel. 0831-2441001/ 4206720, E-mail: spmcontrols@rediffmail.com website: www.spmcontrols.com
SPM CONTROLS
SPM CONTROLS
REF : SPM-086-P/21-22 (8)
DATE : 18/03/2021

BILLET LOADER

Pivoted design- hydraulic operated Billet Loader receives the


Billet from Bottom, takes it to Press centre line, by forward the
movement of Main ram, the Billet insert in to container bore.

The outside arrangement of Loader operating cylinders eases


maintenance if any time needed.

STEM & FIXED DUMMY

Made out of Hot die steel material H 13,


heat treated to 48-49 HRC.

-flower type design- easy to install.

…..9….

R.S. No.686/1/A/2, UDYAMBAG, BELGAUM-590 008.


Tel. 0831-2441001/ 4206720, E-mail: spmcontrols@rediffmail.com website: www.spmcontrols.com
SPM CONTROLS
SPM CONTROLS
REF : SPM-086-P/21-22 (9)
DATE : 18/03/2021

HYDRAULIC SYSTEM- POWER PACK

Used German Rexroth make fixed displacement pumps extends the life due to its rigidity (not
sensitive) at one end connected to IE2 Class energy efficient motor of ABB /Siemens/Bharat Bijlee/
Crompton Greaves make fitted on frame & the low pressure pumps of Veljan make at the other end .
the whole assembly fixed on RCC foundation has just back end of the press.

 High volume Oil filters are provided at the suction port of each pump.

 DIN standard only one size cartridges Valves in all Manifold Blocks, in total hydraulic circuit
ensures fast switching time & reliability.

 Manifold block precisely machined & ground & made out of forged medium carbon alloy steel &
all fixed on top of the tank.

 Air vent port is provided at the pressure connection of main cylinder top.

 Piston pump provided for container sealing over die face. It holds the pressure. Provided with on
ff system so that oil heating is controlled/ reduced.

 Sensing relief valves to perfect over pressure are provided in system. These protect the total machine.

 Digital pressure Transmitter provided for pressure indicating & controlling of set pressure.

 High quality filtration, air Breather is provided at tank. Digital temperature indicator with alarm
is provided.

 Oil gathered on top of Tank during maintenance is collected in floor level collection tank.

 Cold drawn seamless pipes are used for high pressure pipe lines & tested at 300 bar.

 Best quality plastic fiber clamps are used for pipes clamping absorbs pipe vibrations.

 All higher flange, pipes, valves are fixed by high tensile cap screws of 12.8 grade.

…..10……

R.S. No.686/1/A/2, UDYAMBAG, BELGAUM-590 008.


Tel. 0831-2441001/ 4206720, E-mail: spmcontrols@rediffmail.com website: www.spmcontrols.com
SPM CONTROLS
SPM CONTROLS
REF : SPM-086-P/21-22 (10)
DATE : 18/03/2021

Electricals & Electronics

State of the art of Electrical control panels comprises:-

- PLC- Allen Bradley /Siemens/Mitsubishi make

- Touch screen - Allen Bradley /Siemens/Mitsubishi make

- Stroke & speed controlled by- Gefron make Temposonic

- scale sensors Provides high accuracy & reliability.

- Contactor – Siemens / Snieder / ABB make

- Relay – Connectwell make

- Air Cooler on panel to cool the system,

- Cable –Finolex- Polycab make

- Digital input output in PLC are 10% spare

- The Touch screen displays- Billet length, burp cycle pressure, fault history.

- Thyristor controller for container Heaters.

- Container pressure – main ram position extra pressure/ tonnage.

- Pressing speed, Error message fault diagnosis with fault reminders instructions.

- The both VFD s are provided in VFD panel.

- Internet connectivity device to PLC for online support of programming.

- Each Screen display- Hydraulic Oil temperature, container Temperature, Container heater current.

- Cartridge valves with position indicating sensor.

- Safety - Interlocks are provided in the system for smooth operation & safety.

…..11….

R.S. No.686/1/A/2, UDYAMBAG, BELGAUM-590 008.


Tel. 0831-2441001/ 4206720, E-mail: spmcontrols@rediffmail.com website: www.spmcontrols.com
SPM CONTROLS
SPM CONTROLS
REF : SPM-086-P/21-22 (11)
DATE : 18/03/2021

OPEERATION & MAINTENANCE TRAINING:

During the commissioning, our Team of Engineers & Technician will train your any two technical
person (appointed by you) up to three days after successful trial.

SPARE PARTS:

1] Container 1 No.

2] Stem 1 No.

3] Fixed Dummy 1 No.

4] Oil seal (Excluding Main Ram Seal) 1 Set

Comprises :
a) One Set of each size of Cylinder Seals &
b) ‘O’ Rings of Pipe Line- 12 Nos. each
c) Cover, Cartridge Valves O rings – 12 Nos. Each
d) Solenoid Valves, Prefill Valve ‘O” Rings – 12 Nos. each

5] Container Heaters -6 Nos. 1 Set

…..12……

R.S. No.686/1/A/2, UDYAMBAG, BELGAUM-590 008.


Tel. 0831-2441001/ 4206720, E-mail: spmcontrols@rediffmail.com website: www.spmcontrols.com
SPM CONTROLS
SPM CONTROLS
REF : SPM-086-P/21-22 (12)
DATE : 18/03/2021

NOT INCLUDED IN SPM ‘S SCOPE


EXCLUSION FROM SCOPE OF SUPPLY
Generator with necessary electrical switchgears, changeover switches etc. all electrical works,
electrical earthing, Cables for all machineries etc.
Cable trays, water, oil piping underground Trenches with necessary protective covering sheets,
overhead tanks, EOT crane, etc.
Any kinds of civil, masonry works, like foundation for machineries, cooling water tanks, overhead
tank, chimney base, Hot top Casting Pit, cable trench etc.
All consumable items during erection and commissioning like Hydraulic Oil, Gear Oil;, cutting Oil,
etc required for machineries under Customers Scope.
Plant electrification for the lighting load, electrical fittings, sanitary arrangements, weight balance
facilities for foundry and production department.

Workshop machineries and tools, Weighing Machines, Testing Machines, etc.


Pollution Controls equipments required by any local Govt. regulations
Unloading of machineries at your site.
All types of tools and tackles required during the erection of various machineries.
Gas storage tanks, gas pump & pipe lining etc. Welding Machine,Welding rods, Grinder & Grinding wheel etc
Paints & other Hardware materials.
All other items or spares that are not specified and indicated in our offer.
Water Tanks for Cooling Tower, Oil Storage Tank & Foundation Work -
Manufacturing drawings of any parts will not be provided.

WORKING CONDITION PARAMETER TO BE PROVIDED/ MAINTAINED:-


 Oil – Servo 68 or Equivalent – 4000 liters.
 100 TR Cooling Tower with inlet water flow of 650 LPM to press Oil Cooler.
 Environmental temperature 30 To 45 °C
 Humidity 45 to 80 %
 Supply of stabilized voltage - 415 V, 3 ph, 50 Hz Ac supply.
 Supple of current voltage fluctuation ± 10% V
 Supply current Frequency fluctuation - ± 0.5 % Hz
 Customer to provide - supply from LT panel to Press panel

…..13….

R.S. No.686/1/A/2, UDYAMBAG, BELGAUM-590 008.


Tel. 0831-2441001/ 4206720, E-mail: spmcontrols@rediffmail.com website: www.spmcontrols.com
SPM CONTROLS
SPM CONTROLS
REF : SPM-497-P/20-21 (13)
DATE : 18/03/2021

COMMERCIAL:

Price in Dollar : 195,600 (One hundred Ninety five thousand


Six hundred Dollars only) Prices are Each F.O.B. JNPT
MUMBAI PORT (Nhava Sheva Port), Navi Mumbai.
Taxes & Duties are Extra as applicable.
If any visit required from our side, then you have to provide Fees for Visa services, Up & Down
Air Fare, Good Accommodation & Food, local transportation, Free Telephone with ISD/STD
facility & medical treatment etc.,

DELIVERY: Five to Six Months (Normally) from the date of receipt of techno commercially clear
order confirmation by us from your end but it will be confirmed at time of order.

PACKING -The Press/equipments packing wherever required will be sea worthy with proper
notations wherever necessary.

TRANSPORTATION
The Container charges, Transportation, Insurance & other Chares from Nhava Seva Port
(Mumbai) to your Port are to be borne by the Purchaser.
The Transportation& Insurance from Belgaum to Nhava Seva Port is in our scope.

PAYMENT
40% of the value as advance along with order (Through irrevocable confirmed, without Recourse
letter of credit. LC should be negotiable).
57% payment plus 100% taxes and duties (if applicable), you shall open an irrevocable confirmed,
without Recourse letter of credit. LC should be negotiable.
3% Irrevocable LC After commissioning.
L.C. Valid for a period of eighteen months should be established for the balance payment of Proforma
Invoice within three months from the date of order.

Note: Please refer our General Terms & Conditions of Sale - Ref: SPM-048/20-21, dated 09/01/20.

Regards,

For SPM CONTROLS

L S Sawant …..14…..

R.S. No.686/1/A/2, UDYAMBAG, BELGAUM-590 008.


Tel. 0831-2441001/ 4206720, E-mail: spmcontrols@rediffmail.com website: www.spmcontrols.com
SPM CONTROLS
SPM CONTROLS
REF : SPM-087/21-22 (14)
DATE : 18/03/2021

TERMS AND CONDITIONS


The prices quoted in our offer shall remain unchanged over delivery period, provided receipt of
technically and commercially clear order by us, with necessary advance. The price/s are up to F.O.B.
JNPT PORT (Nhava Sheva Port, Navi Mumbai) only. Other charges if any, will be in your
account. The Governmental levies and taxes (if any) will be charged as applicable at the time of
dispatch.
If the delivery is delayed due to any reason like delay in commercial and or technical clarifications,
non-receipt of advance payment as per schedule or postponement of delivery date by your end etc the
prices ruling on the date of delivery shall be charged.
PACKING -The Press/equipments packing wherever required will be sea worthy with proper
notations wherever necessary.

TRANSPORTATION
The Container charges, Transportation, Insurance & other Chares from Nhava Seva Port
(Mumbai) to your Port are to be borne by the Purchaser.
The Transportation& Insurance from Belgaum to Nhava Seva Port is in our scope.

PAYMENT
40% of the value as advance along with order (Through irrevocable confirmed, without Recourse
letter of credit. LC should be negotiable).
57% payment plus 100% taxes and duties (if applicable), you shall open an irrevocable confirmed,
without Recourse letter of credit. LC should be negotiable.
3% Irrevocable LC After commissioning.
L.C. Valid for a period of eighteen months should be established for the balance payment of Proforma
Invoice within three months from the date of order.
If the commissioning is delayed from your side more than one month for any reasons, the full payment
if any has to be settled down before commissioning of press.

VALIDITY
Our offer is valid for a period of 30 days from the date of quotation.

DELIVERY
The delivery period shall be applicable from the date of receipt of your firm purchase order. The
delivery time is quoted considering our present order position and same will be confirmed at the time
of finalization of order.

CANCELLATION
The order/s once placed in reference to this quotation shall not be cancelled by the client on any
reason. The advances will be forfeited (i.e. will not be returned) in case of cancellation of order.

JURISDICTION
All the matter/issues arising out of this quotation are subject to Belgaum Jurisdiction only.
….15…..

R.S. No.686/1/A/2, UDYAMBAG, BELGAUM-590 008.


Tel. 0831-2441001/ 4206720, E-mail: spmcontrols@rediffmail.com website: www.spmcontrols.com
SPM CONTROLS
SPM CONTROLS
REF : SPM-087/21-22 (15)
DATE : 18/03/2021

COMMISSIONING : Providing Crane for Unloading & Installation at your site will be in your
scope. For Installation & Commissioning, We will depute our Engineers & Technician stage
wise as and when required with mutual co-ordination with your team. Our charges towards
such deputation shall be as follows to be borne by you (Customer).
1. Fees for Visa Service etc.,
2 UP & DOWN Air Fare/ 2nd A C Class Train Fare as applicable from Belgaum top your site
our charges for such deputation are:-
3 You have to provide Good Quality accommodation and food to our team.
4] US $ 100 per person per day chargeable from the date of departure to the date of arrival,
Inclusive of both days and any holidays.
Our Personal should be provided with necessary assistance of man power (at least 4 workers), Tools
and Equipments and other requirements, if any.
1 You should provide local transportation
2 Free telephone with ISD/STD facility to be provided by you.
3 Charges for the required spare parts will have to be borne by you
4 Inland transportation and transportation between the accommodation to site.
5 Best medical treatment for first aid for their illness and their injuries
6 All possible protection for safety and security during stay in buyer’s country.
7 Our engineers/technicians shall work for eight (8) hours a day excluding one (1) hour break
for Lunch, six days a week. Weekly and National holidays of the buyer countries shall be free from
the work
8 If erection & commissioning is not required, the balance 2% after commission payment should be
paid before delivery of machines.

SCOPE OF SUPPLY
Our scope of supply covers, one no extrusion press complete with power pack, electrical control panel.
Operating control desk as described in specifications & technical data.
MANUAL -Two copies of press operating & maintenance instructions manuals will be supplied
along with the press. The manuals will be supplied on receipt of full & final payment.

NOTE - Following are not included in our scope of supply.


1] Tooling like dies and dies supports, material etc.
2] Foundation work, pipe and cable trenches etc for the press.
3] Inter connecting wiring between main control panel and press control panel.
4] Main isolator and fuses.
5] Hydraulic oil.
6] Billet transfer equipment/s.
7] Any other auxiliary equipment/s, attachment etc. are not covered in our offer.
….16….

R.S. No.686/1/A/2, UDYAMBAG, BELGAUM-590 008.


Tel. 0831-2441001/ 4206720, E-mail: spmcontrols@rediffmail.com website: www.spmcontrols.com
SPM CONTROLS
SPM CONTROLS
REF : SPM-087/21-22 (16)
DATE : 18/03/2021
The pressing speeds & other technical data specified in this quotation are purely theoretical and may
differ in practice. Due to our constant efforts for developments, we shall supply the press with our
latest developments, & hence the specifications, illustrations are subject to change without notice.

WARRENTY
We hereby warrantee the equipment manufactured and supplied by us for a period of Twelve months
from date of delivery or Twelve months from the date of commissioning whichever is earlier.
The nature of warrantee is as follows.
If within warrantee period any parts of the equipment supplied by us is proven to be of defective raw
material, faulty workmanship, we shall repair or give free replacement for such parts as quickly as
possible. The decision of repair or free replacement is to be taken by M/S.SPM CONTROLS only. The
expenses for such work will be borne by M/s. SPM CONTROLS, provided that the equipment
supplied by us is installed under the supervision of our erection and commissioning personnel and
operated in normal working conditions.
All cost of dismantling such defective parts as well as reinstallation of new parts are to be borne by the
customer. Warrantee period for items repaired and or replaced shall not exceed the warrantee period of
equipment. All defective parts removed from the equipment during warrantee period shall be the
property of M/s. SPM CONTROLS and the same shall be returned to SPM CONTROLS within one
month from the date of removal of parts or our authorised personnel shall be entitled to carry away
such parts. The warrantee for all the bought out items as given by the suppliers shall be passed to you.

This warranty is not applicable to Toolings such as container, stem, Fixed dummy block etc., as well
as consumable components/parts like oil seals, 'o' rings, rubber components etc & also parts subjected
to normal wear and tear.

Within warrantee period, if the full payment is not received by SPM Controls within two weeks after
successful commissioning / maximum one month from the date of dispatch, the warrantee will expire.
We will not be responsible for any claims raised by the purchaser.

*APART FROM THE ABOVE T & C, IF ANY PART LEFT OUT OR TO BE ADDED /
MODIFIED SHOULD BE MUTUALLY DISCUSSED & AGREED FOR SMOOTH WORKOUT
OF THE PROJECT.

M/s. SPM CONTROLS reserve the right to make alterations/additions in its equipment without any
obligation to incorporate such changes or additions in its machines previously manufactured and sold.

For SPM CONTROLS,

Laxman Sawant

R.S. No.686/1/A/2, UDYAMBAG, BELGAUM-590 008.