The deugro Service Portfolio

Power Industry
Specialized Family Global Access Trusted In-house
Supplier Enterprise 40 + Countries Partner Chartering Team
Since 1924 70 + Offices

deugro’s Power Expertise


at a Glance
The power industry has been a key market for deugro since the
very beginnings of the company in 1924. Thanks to our global team
of logistics and technical experts, we have experience working on
complex power projects on every continent. It’s this experience
that makes deugro a leader in its field of business, assessing
risk and delivering value-added logistics solutions for the safe
transportation and installation of components for global power
projects.

deugro recognizes that the power


industry has evolved significantly
over the last decade, with a drive
to develop technologies for lower
carbon emissions and power
sourced from renewable energy.
It’s important not to lose sight of
the many opportunities available
to us, be it in the development
of the existing transmission/
distribution infrastructure or in the
breakthrough in renewable energy
supply technology. deugro’s aim
is to have a balanced portfolio in
terms of renewable and traditional Furthermore our aim is to reduce deugro’s end-to-end supply
power generation, as well as a risk, provide accurate scheduling chain management provides the
diverse global base of clients and reduce the cost of logistics assurance needed for modern
who are focused on newbuilds, delivery for high-value and critical power projects. We cover front-end
expansion and the strategic equipment. These solutions planning, identify infrastructure
service and replacement of assets. cover gas turbines, generators and permit limitations, and work
This enables us as an industry to and transformers, offshore wind with all necessary stakeholders
embrace change, adapting and turbines and hydro-electric to ensure logistics delivery is on
supporting our clients as the equipment. From ocean shipping schedule, on budget and includes
market develops. and barging to road and rail the highest level of health, safety
transportation and installation and environmental control.
We have collaborated with all at the job site—we have the
the major power generation experience and capability to Marchwood Project:
manufacturers to design and manage all aspects of the logistics Positioning of gas turbine
develop innovative logistics supply chain. using a hydraulic lift and
and supply chain solutions. lock system

2 3
Our Power Industry
Services
deugro’s early involvement with
client stakeholders is key to
delivering customized consultancy
services, precise project planning
and full-service project forwarding
solutions.

Our services are tailor-made for


power manufacturers, EPCs and
investors:

• Budgeting
• Road and rail permits
• Project schedule planning
• Flexible execution methods
• Vendor selection
• Site visits
• Risk assessments
• Method statements
• Site installation
• Engineering
• Supervision
• Operational assurance
• Project management plans

Belo Monte HVDC Project


(phase one) in Brazil

4 5
QHSES – Safety First!
Client satisfaction is the motivation behind all our efforts. It is our conviction that this
can only be successfully accomplished if we are good custodians of the trust granted to
us by our clients, their goods and the surrounding environments. All companies of the
deugro group are guided by this fundamental principle. We aim to continuously achieve
the deugro group’s objectives and vision, leading by example and setting the standard
for quality, health, safety, environment and security (QHSES) in our industry.

For deugro—a company of the account all site-specific conditions Should there be any incidents or deugro minds. Safety matters.
deugro group—we have developed and covering every aspect of the occurrences of non-conformance,
an Integrated Management System scope of work. QHSES and the respective

Our Compliance Standards


(IMS), and are ISO-certified (ISO operational team work closely
9001:2015, ISO 14001:2015 and This project-specific plan focuses together to investigate and devise
BS OHSAS 18001:2007) by DQS on implementing detailed risk the appropriate corrective action.
GmbH. This system is continuously management for the project to
reviewed and improved to enable ensure that all risks identified Our activities are planned, The deugro group compliance States Foreign Corrupt Practices the highest standards of ethics
us to meet our objectives in the and assessed are reduced to as organized and performed in a standards are reflected in various Act (FCPA), the UK Bribery Act 2010 and integrity, we also offer
future, too. low as reasonably practicable safe and environmentally-friendly ways, and it is our philosophy to (UKBA) and the OECD Guidelines for frequent compliance training. It is
(ALARP). This is completed by manner. We are dedicated to incorporate compliance at all levels Multinational Enterprises. The CoEC provided online and in face-to-face
At deugro, we integrate QHSES identifying possible hazards that maintaining the environment in of the group and in everything we and ACCP serve as the foundation workshops, subject to individual
in every phase of your project— all project stakeholders may which we work and to providing a do. Our corporate policies—the for the CMS, and are reviewed, risk assessments. Important
from the very beginning of the be exposed to, and by making safe, secure and healthy workplace Code of Ethics and Compliance updated and acknowledged by announcements on the corporate
concept to the design and all sure that all mitigating controls for our staff and all parties involved (CoEC) and the Anti-Corruption all deugro group employees on a intranet and local bulletin boards
the way through to execution. are identified and properly in every project we handle. Our Compliance Policy (ACCP) — regular basis. serve to raise ongoing awareness.
Because every project is a unique implemented. During the execution reputable and competent business are proof of our commitment.
undertaking, our approach is of the project, our QHSES set-up partners and subcontractors are These corporate regulations Furthermore, our Transport Local compliance ombudsmen are
planned on a case-by-case basis, ensures that all operational and vetted by the QHSES team based on are mandatory for all deugro Management System (TMS) screens available in all of our offices. All
pursuant to the most stringent HSE key performance indicators their equally high commitment. group companies worldwide, and all shipments, specifically the compliance ombudsmen receive
HSE standards. Before the (KPIs) that were agreed to are employees and business partners names and addresses provided, on face-to-face training by the Head of
implementation of the execution closely monitored and acted We are committed to a culture are required to operate within a 24/7 basis against all applicable Global Legal and Compliance.
phase, we develop the project- upon to ensure that performance where health and safety are not their framework at all times. international governmental
specific HSE plan, taking into continually improves. compromised! Our Compliance Management sanction lists in order to scrutinize
System (CMS) was designed to each business transaction.
consider various international
Our approach to your project regulations and recognized To keep our employees involved
standards, including the United in our efforts to live and maintain

» A successful compliance program is not about


Plan Do Check Act focusing on the rules. It is about fostering a true
culture of ethics and integrity. «
Specific risk Job safety analysis, Auditing, Management
­assessment, method statement, workplace review,
QHSES plans subcontractor inspection, preventative
vetting, training certifications and corrective
actions Jessica Kaplan, Head of Global Legal and Compliance

6 7
deugro group: » We are redefining industry standards
The Unique One-stop Shop now more than ever. « Thomas C. Press, CEO – deugro group

The deugro group originates from deugro, the first company founded
in 1924 in Frankfurt am Main, Germany. Today, the deugro group continues
to be a family-owned enterprise with a strong financial foundation.
This global, flexible and diversified network with local knowledge and
experience is redefining industry standards now more than ever.

The deugro group is comprised of four independent companies that


offer far-reaching competence, experience and know-how in their
fields of business:

Specialized
transportation Project freight
assets forwarding

deugro dhaulage dteq dship


deugro is a highly specialized dhaulage provides an extensive dteq Transport Engineering dship Carriers provides cost-
freight forwarder with a strong and comprehensive range of heavy Solutions provides tailor-made effective tramp services for heavy
Transport focus on turnkey logistics haul and heavy lift equipment transport and marine engineering lift and project cargo. Driven by
Global ocean engineering solutions for industrial projects. for any kind of specialized or solutions, as well as port captain, service, dedication and high-quality
transportation solutions It has a proven track record in challenging project. The company surveying and supervision services, workmanship, dship ensures that
successfully executing projects of owns and operates its own fleet and project consulting. To solve risk remains at a minimum and
any magnitude, even under the of prime movers, heavy duty and overcome all the challenges of delivers solutions that exceed
most challenging conditions and hydraulic trailers as well as other moving oversized and heavy cargo, clients’ expectations. A global
requirements. deugro focuses specialized conventional trailers, dteq’s experts leverage decades of provider of ocean transportation
wholly on identifying and solving and installation equipment, which specialized engineering knowledge services, dship manages and owns
clients’ specific needs with unique are available to our clients at any and experience. They do so with a fleet of modern and reliable
tailor-made solutions to fulfill all location worldwide. Furthermore, dedication, talent and an inventive multi-purpose vessels. These are
requirements. To deliver the best dhaulage owns a variety of spirit for every project phase. designed to support the specialized
in both cost and performance, supporting equipment, such as needs of breakbulk, heavy lift, dry
deugro serves as an extension of fenders, lifting equipment of bulk and project cargo clients in
its clients in their respective supply various capacities, lighting towers, the oil and gas, wind energy and
chains. It provides ocean and inland generators and a tailor-made floating cargo industries—to name
waterway freight services, road and fly-over bridge with a capacity of just a few.
rail transportation as well as air 300 metric tons.
freight to almost any destination.

8 9
KIPP Kirikkale Project: Loading
from the barge by geared vessel
in Rotterdam, the Netherlands

Our Verticals
for the Power Industry
deugro offers extensive knowledge Critical and time-sensitive project Generation Transmission Distribution
in managing highly complex and deliverables provide an opportunity
demanding newbuilding projects for deugro to showcase its Non-renewable • Transformers • Grid energy storage
on a global scale. We offer customized, reliable solutions. • Thermal power generation • Substations • Transformers
bespoke technical solutions to They ensure that downtimes are • Nuclear and steam power • HVDC links • Batteries
overcome every challenge, from minimized and projects are within generation
aging infrastructure and routing budget through commercial • Combined cycle power plant
feasibility to constrained site access engineering, such as by bundling
and minimal to no site laydown purchase models—on time, on Renewable
area. budget and safely delivered. • Waste to energy power
generation
We can provide in-depth support • Hydroelectric power generation
during the full project life cycle. Our • Wind power generation (offshore
experience and expertise cover the and onshore)
following power segments, to name • Solar power generation
just a few: (photovoltaic and thermal)
• Geothermal power generation

10 11
Point of View:

A Paradigm Shift within the


Power Segment

» Our job starts where others


Meet Andreas Menzel, the dedicated expert within deugro for the power industry. haulage and handling equipment
Contributing broad industry experience, he is working on the alignment of the power in developing regions within the

don’t even start to think about it. «


industry across all deugro businesses globally and sharing his know-how. Read in deugro group. By making these
this interview how deugro set up its structure to support clients in managing a shift considerable investments in the
towards renewable energy supply. power segment, we are able to
Andreas Menzel, Corporate Global Key Account Manager
support our clients independently
without being reliant on third
How long have you been Based on your project parties whose standards do not
working now for the power experience, where do you measure up to our own or those of this shift by extensively sharing
industry, and what is your see the deugro difference our power clients. knowledge about specific client
personal commitment to we are able to offer our requirements and cargo-specific
it? clients? handling experiences. This is a
From your point of view, major step and is fully supported
I have been working in the logistics By having such an extensive depth how is deugro preparing by the deugro Global Key Account
industry since 2004, and have of knowledge, skill and experience to offer value-added Management team and our vertical
handled power projects and globally, we are able to support logistical solutions to the strategy to support our clients
cargo since then. I started in the every stage of the project—from growing power industry in and the specific industry. We can
maritime sector and focused on providing comprehensive feasibility the future? therefore offer comprehensive
the shipping of cargo related to the studies at the feed stage to solutions and concepts well before
power industry. I was in different achieving operational excellence Having observed the paradigm shift the projects are funded. Our job
operational and technical positions following the awarding of the within the power industry, deugro starts where others don’t even
and gained first-hand experience project. In addition to this, we can has already adjusted and must start to think about it.
Andreas Menzel, in cargo security and quality, as offer the unique structure of the continue to do so in order to suit
Corporate Global Key well as in safety, in the Port of deugro group, which is comprised the needs of manufacturers and
Account Manager Bremerhaven. Ever since 2012, I of several companies focusing on project owners.
have been dedicated to the entire project freight forwarding, ocean
transportation chain and have transportation of heavy lift and We recognize that the demand
worked intensively on numerous project cargo, transport and marine for cleaner energy production,
projects for the power industry engineering as well as specialized renewable fuel sources, technology
worldwide. In my current role, I am transportation assets. This enables experience and government
responsible for developing deugro us to provide front-end feasibility funding on a global scale is forcing
within the power industry. in order to mitigate operational risk our clients to quickly adapt; and as
and reduce supply chain costs. a logistics provider, we must follow
Which means that I focus on this trend. We see how the power
increasing sales efforts, identifying Innovation and adaptation is industry is shifting in different
and monitoring industry trends and the key to not only growth, but directions globally. Where some
getting deugro involved in major also to maintaining our current countries decided not to support
power projects globally. Working market position within this coal-fired power plants and nuclear
directly and closely with our clients challenging climate. Therefore, power plants in the future, other
is another aspect of my work. This deugro continues to invest in countries must count on these 188 MT transformer on
also includes that we as deugro are this philosophy and, as a result, relatively cheap power production its way to a substation
always setting industry standards prospers. Investments such as new facilities. This means that our in Texas, USA
in this segment and fulfilling our and innovative IT solutions are a knowledge in the different power
clients’ needs 100 percent. great example of this, and another industry sectors must shift to the
would be the purchasing of own relevant countries. We are following

12 13
according to Wärtsilä’s material the Statistical Import Clearance • Traffic management for vehicles
management requirement for the Procedure, a mutual commercial at the offloading/laydown area
project. pact among Gulf Cooperation • Minimizing the turnaround time
Council (GCC) countries. deugro of trailers during offloading
The entire movement and work also suggested to clear the • Managing the storage of the
awarded to deugro was completed shipment through duty payment, Shipper Owned Containers
in 17 months, in line with the rather than clearing under security and loose material, and proper
project’s schedule, without any bond, to avoid any post clearance demarcation and arrangement of
delays or incidents. documentation issues. them in a planned sequence
• Recordkeeping for and updating
Equipment support of the storage plan of the
Challenges and solutions As part of the initial request, laydown area with each and
during project execution deugro was asked to undertake every delivery
the offloading of the containers on
Remote job site / poor site. Keeping the project schedule
infrastructure in mind, deugro arranged for the
The only available deep-sea deployment of a dedicated crane
port for transporting HL units with 50-metric-ton capacity, along
is the Port of Khasab, which is a with the support crew on site with
natural port but with very limited a 01-certified rigger. In addition,
Project Insight: connectivity to the actual remote deugro arranged a forklift with

Musandam IPP, P/140511


job site via a single road with poor 5-metric-ton capacity to assist the
infrastructure and hilly terrain. Due client in handling any shifting activity
to the contract’s stringent health, of packages during the offloading
safety and environment (HSE) and as supportive equipment during
Wärtsilä Muscat LLC appointed deugro Projects (India) Pvt. Ltd. as the logistics requirements, road transportation the installation of the engines and
partner to undertake the transportation of 15 gensets and five transformers along the treacherous route was transformers at the site.
from various origins in Europe and India to the Sultanate of Oman. to be avoided. After detailed
route surveys and port studies,
deugro suggested the Port of
During the entire shipment, Engineering Solutions (dteq) Mina Saqr, located approximately
deugro offered services such leveraged their in-depth knowledge 17 kilometers from the project
as booking and chartering of to limit the exposure of risk in site, across the border in UAE. For
suitable vessels; supporting port the planning and execution of container shipments, the Port of
operation activities, including transports. Jebel Ali was finalized.
Project Data customs clearance; and loading,
• Power vertical: Generation securing, discharge and transfer deugro successfully completed Omanization
• Client: Wärtsilä Muscat LLC of the cargo to specially acquired the project, with all 15 units of As a contractual requirement, the
• Project owner: Musandam areas for immediate storage at the the engine set and five units of client requested for the shipments
Power Company Port of Mina Saqr. After leaving transformers duly positioned on to be imported through the ports
• Total volume: 20,000 FRT the port, deugro arranged the their respective foundations. All in Oman and to use a PR/clearing
• Max. heavy lift: 150 MT road transportation to the job site, heavy lift (HL) units were positioned agent registered in Oman. deugro Engine set offloaded at the
• Cargo details: 15 gensets including the improvement and using jacking and skidding due engaged a subcontractor based in site near the foundation for
(150 MT each) and reinforcement of public roads and to the lack of space for the high- Muscat for the supply of the crane final positioning
5 transformers (70 MT each) bridges or any other required civil capacity crane. and forklift. The vendors were duly Storage management
• Origins: Finland, Poland, works like lifting and/or shutting inducted and approved by the client Throughout the project, several
Belgium, India down of electrical cables, and All the containers (general purpose, to fulfill the project requirements. bottlenecks were experienced for
• Project location: Tibat, arranged for the required permits flat rack, high cube and open top), the storage of SOCs/material at the
Wilayat of Bukha (Sultanate from the relevant authorities. including all types of inventory, Even though the ports selected site, such as traffic management
of Oman) were safely delivered and offloaded for discharge are in the UAE, and the shortage of storage space
Throughout execution, a team of at the on-site storage yard deugro suggested to complete for the SOCs. As a result, deugro
engineers from dteq Transport all the import formalities under assisted the project team in:

14 15
Project Insight: 8 7 6 5 4 3 2 1

Duke Citrus Project


Preliminary IF IN DOUBT ASK

76200 [250']

F
A
Module 1A/B
Module 4A/B

The Duke Citrus Project is one of the largest combined-cycle

16459 [54']
B
natural gas plant projects in the industry. Once completed, the Module 3A/B Module 3A/B

1,640-megawatt plant, located in Citrus County, Florida, USA, will

E
A
A
deliver cleaner energy with higher efficiency for the region.
Module 1A/B Module 4A/B

Crane Mats
305 (12") X 1220 (4')
X 6100 (20') (typ)

D
Module 1A/B Module 4A/B

C
128mm (1/2") Plywood (Typ.)
Bill of Materials
W12X96 beams (Typ.)
1 128mm (1/2") Grade 70 Chain - 6.8 mt WLL (15,000 lbs) 48 ea

Module 1A/B Concrete / Steel stools of 48"X48"X40"


2 128mm-160mm (1/2"-5/8") Ratchet Binder 7mt WLL (16,000 lbs) 48 ea
Crane Mats 305 (12") X 1220 (4')
3 Concrete / Steel stools of 48"X48"X40" 48 ea
X 6100 (20') (Typ.)

B
4 Crane Mats 305 (12") X 1220 (4') X 6100 (20') (Typ.) 32 ea

128mm (1/2") Grade 70 Chain 5 W12X96 beams (Typ.) 48 ea


6.8 mt WLL (15,000 lbs) (typ.) 128mm-160mm (1/2"-5/8") Ratchet Binder
7mt WLL (16,000 lbs)(typ.) 6 36 ton D-ring (Typ.) 48 ea

36 ton D-ring (Typ.)

Project
Duke Energy - Citrus, Fl.
Remarks:
Title Lashing Plan 250' barge - HRSG Modules

A
1) Preliminary drawing based on available information on barge and cargo.
2) Supports consist of W14X90 beams followed by concrete / steel stools of 700 mm X
700 mm X 1016 mm, subject to change. Drawing No Client Optimal
Vogt Power
usage of space
3) Stowage plan based on barge "M 980", 250' X 54'. 154028_TED03_0103R0
4) Location for stools under modules taken from "Shipping Clearances" drawings.
5) Use grade 70 Chains or better.
00 18.02.16 Initial Drawing
Rev. Date Description
G.G. F.A.
DRWN CHKD APPD
T.O. Date
19.02.2016 1/1
Page
available on barge thanks to
Scale Not to scale
All dimensions are in mm
Transport Engineering Department
Bremen, Germany

shifted cargo arrangement


This document and any information or descriptive matter set out in it are confidential and copyright property and must not be disclosed, loaned, copied or used for any purpose whatsoever without prior written permission.

Vogt Power awarded deugro the the barges on stools and beams
transportation tender for four units in line with the securement plan,
of Heat Recovery Steam Generators likewise engineered by dteq.
(HRSGs) for this power plant. Afterwards, deugro coordinated
Each of the four units included the tow of the barges to the power
ten modules and two large high- plant site and managed the roll-off
pressure drums. delivery to the plant.

Project scope Challenges

deugro took two large-deck barges, • Complex barge stowing concept


certified by the American Bureau • Shifted stowing due to cargo
of Shipping (ABS), on a four-month dimensions and little space
Project Data bare charter. We arranged and available on deck
• Power vertical: Generation coordinated the towing of these • Precise coordination with the
• Client: Vogt Power barges from New Orleans to United States Coast Guard on
• Location: Crystal River, USA the port in Manatee, Florida, for delivery schedules due to the
• Scope: Barge transportation loading. At the port, deugro set up narrow and very busy coal barge
• Cargo: 44 HRSG modules, and performed the layout of the navigation on the private channel
high-pressure drums stools and beams for the barges • The largely varying tide required
• Cargo details: 22,000 FRT according to the barge stow plans the use of a mooring barge to
with heavy lifts up to 350 MT engineered by dteq Transport distance the cargo barge from
Engineering Solutions (dteq). Once the shore and rocks.
loaded, the units were secured to

16 17
Project Insight:

Belo Monte
HVDC Project
Challenges

When finally up and running, Belo Monte will be the third-largest dam in the world. It will be the main • Difficult and complex Brazilian
Brazilian hydroelectric plant, generating more than 11,000 megawatts of power at full capacity. The terrain
power generated will be transmitted over a 2,000-kilometer-long transmission line, able to provide • Roads affected by transformer
sustainable energy for 17 entire Brazilian states and hence 60 million people. This amount of energy size
would replace the output of about eight nuclear power plants. • Significant tide changes, winds,
currents and busy ferry traffic on
the Amazon River
• Steep 14% incline at discharge in
Xingu
• Extremely long transportation
routes spanning half the Earth’s
circumference

» This precise move was only


The transformers had been with a subcontractor especially for jetty to prevent a slide backwards.
shipped by heavy lift vessels to this project, in order to be able to The whole jetty was fixed on steel
the ports of delivery in Santos adjust to the local tide variations. beams built into the ground. This
and Belém, where parts of the In addition, using the custom precise move was only effective effective due to great teamwork
of all project parties involved. «
cargo were transshipped on jetty allowed the team to minimize due to great teamwork of all project
locally sourced deck barges with community impact and to avoid parties involved.
special grillages. This allowed the disruption of the vital ferry service
self-propelled modular trailer of the Trans-Amazonian Highway. From here on, deugro successfully
(SPMT) to enter underneath the managed the transportation via
transformer at the final discharge The discharge at Xingu was one SPMT to the final job site, the HVDC weight limits and other regulations. deugro transported equipment
Project Data location in Xingu, Pará for further of the major challenges of the converter station in Xingu. This Various measurements were taken, designated for the power
• Power vertical: Transmission transportation. The other part of project and had to be planned and station is able to receive energy such as allowing the roads to generation plant at the Belo
• Cargo: 28 transformers the cargo was transported by road executed carefully in cooperation from the Belo Monte complex and “breathe” between each massive Monte job site as well. Fourteen
(14x 400 kV, 219 MT each; with specialized heavy haulage with a team of engineers from dteq convert it into alternating current in cargo move or bridge inspections transformers weighing up to
14x 800 kV, 332 MT each) equipment. Transport Engineering Solutions order to transport the energy to the after each load. 218 metric tons each, six
• Max. dimensions: (dteq), a company of the deugro town of Estreito, which is transformers of up to 265 metric
1,070 x 480 x 510 cm After a five-day voyage through the group. While docking, the barge 2,000 kilometers away. One particular road section was tons in weight, rotors and turbine
• Origins: Germany, China Bay of Guajara, Marajo, Pará River, had very few contact areas available so uneven that it required the shafts were shipped from their
and Brazil Straight of Breves, and Amazonas and specific mooring points had to At the same time in Estreito, height of the hanging cargo on factories from various origins in
• Places of delivery: Vitória do River, before finally heading into the be built. Once the barge was safely multiple axle line trailer and the girder bridge to be raised. The Brazil to Vitória do Xingu. The scope
Xingu (Belo Monte job site) Xingu River, the deck barge arrived placed for the roll-off operation, girder bridge units delivered the cargo would otherwise have been not only included transportation by
and Estreito (substation), at the discharge location at Xingu, the cargo needed to overcome a remaining transformers. The sheer hung up on the hilly parts of this road and ocean, but also discharge
Brazil where a custom-made mobile 14-percent incline on the gravel size of each transformer meant challenging route. and storage.
• Volume: 68,343 FRT jetty was waiting to discharge path of the Xingu riverbed. The that roads would be affected.
the valuable cargo. This jetty had solution to secure this crucial In cooperation with the local In addition to the power
been constructed in cooperation move was a special surface on the authorities, deugro minded all distribution part of this project,

18 19
Project Insight:

Inalum Boost Project


A major client in Indonesia awarded deugro (Singapore) Pte Ltd
an air freight charter from Europe to Indonesia that involved a
series of challenges and special transportation pre-arrangements.

The shipment consisted of two


transformers plus accessories out
of Vaasa, Finland and two rectifiers
out of Baden, Switzerland. After
evaluating various options, deugro
proposed to consolidate both
shipments in Helsinki and arrange
for a combined air charter to Kuala
Namu, Indonesia.

Because of the transformers’


dimensions (4.9 x 2.5 x 3.3 meters
each), deugro needed to use an The timeline was challenging. The doors simultaneously. The cargo
Antonov AN-124-100 aircraft. The cargo from Switzerland had to was moved out of the cargo hold
remaining capacity of this open- be forwarded during the holiday and onto a ramp via a trolley
plan aircraft would transport season. In addition, ground system, from where a mobile crane
the 5-metric-ton rectifiers from handling agents at both the origin lifted the cargo to transfer it. The
Switzerland perfectly. During and destination airports were truck on the ground at the airport
planning and execution, this unable to accept charter planes on was ready to deliver the cargo to
solution proved to be the most New Year’s Eve. It was only thanks the construction site in Medan on
cost-effective for our client. to the full commitment of all of our time and to the full satisfaction of
Project Data team members during the holidays our client.
• Power vertical: Transmission It was the first time the airport in that it was possible to complete
• Cargo volume: 23 pieces Medan had received such a large every step of the project on time. Lifting of a transformer during
totaling 95,525 kg aircraft, so deugro had to make Challenges offloading operations in Medan,
• Freight highlights: sure that certain preparations were Finally, the aircraft took off from Indonesia
2 transformer units, completed in advance. deugro Finland and headed to Indonesia, • Ground-leveling works at the
36 MT each planned and performed several where our team was waiting airport in Kuala Namu in order to
• Origins: Finland and road improvement works so the to supervise the discharging receive the heavy cargo
Switzerland road leading out of the airport operation. With the help of • Tight time schedule during the
• Project location: could handle the massive cargo purpose-built ramps and overhead holiday season
Medan, Indonesia load; the airport then issued the cranes on board the aircraft, • Loading under turbulent weather
landing permit. the team was able to load and conditions
discharge via the front and rear

20 21
Project Insight:

KIPP Kirikkale Independent


Power Plant Project
The KIPP Kirikkale Independent Power Plant Project has involved the
heaviest transportation over the longest distance ever executed in
Turkey to date. Five trips with heavy lifts of up to 405 metric tons posed
a few challenges: On each trip, we crossed over 30 bridges, traversed
380 road kilometers and moved a total of 65,000 freight tons.

Gas turbine roll-off using


an 18-axle, four-file SPMT
over an extended ramp
Project Insight:

Marchwood Power Plant


The project’s size and deugro’s scope of work were particularly unique because they involved the
shipping of the entire Marchwood Power Plant, a 850-megawatt combined cycle gas turbine (CCGT)
power station. The transportation involved the movement of all core parts of the station, including 36
heat recovery steam generator (HRSG) modules. This meant a total of more than 55,000 freight tons
were successfully moved from South Korea, Indonesia and northern Europe to Marchwood, UK. During
the execution of this power generation project, more than 100 people were subcontracted by deugro to
work in the ports, on the marshalling yard and on the job site.

The onshore transportation from deugro needed to pay special Four heavy lift, full-charter vessels floating crane from Southampton transformers by means of jacking
the Port of Samsun to the site attention to having the right heavy from South Korea and two part- to Marchwood. The operation and skidding. In addition, deugro
in Kirikkale, Turkey marked the haul equipment in place for the charter vessels from Indonesia— took 18 days, also due to the short was responsible for the lifting and
Project Data most challenging part of deugro’s project. Wherever viable, local loaded with 30,000 freight tons tidal windows in Marchwood in setting of the two gas turbines and
• Power vertical: Generation scope of work. In order to ensure vendors and suppliers had been of boiler components—arrived in connection with the shallow waters two gas turbine generators onto
• Client: Samsung C&T seamless operations, deugro taken into account to save both Southampton and Marchwood. The there. After the HRSG modules foundation by hydraulic lift and lock
• Scope of work: Offshore provided a front-end, port-to-door time and costs. In regards to the main challenge was to transport were delivered to the site, the heavy system.
and onshore freight logistics plan, as well as a detailed infrastructure, deugro faced weak the oversized HRSG modules. main components from northern
forwarding and logistics route and staging investigation structures on the route around the deugro had engineering work done Europe arrived by coaster and
management solutions in Turkey. In addition, a complete plant and on bridges. Together with in advance to prepare the vessels heavy lift RO/RO vessels.
• Heavy cargo: 2 gas turbine concept and solution for the the heavy haul vendor and dteq’s to ship the unstackable modules.
generators, 2 gas turbines, movement of heavy haul items engineering team, deugro worked The solution: Intermediate artificial All cargo was then taken into
1 steam turbine generator, weighing more than 400 metric on technical solutions and the decks in three vessels to hold the intermediate storage on a
2 heat recovery steam tons was included. This also suitable upgrades of the poor road heavy modules safely. marshalling yard and delivered
generators involved the management of infrastructure. upon the client’s request to the
• Destination: Kirikkale, Turkey permit issues for heavy haul and However, the HRSG modules could job site. This meant that cranes,
• Origins: Poland, overdimensional cargo. All in all, deugro was able to provide not be discharged in Marchwood escorts and suitable truck/
Netherlands, Portugal a strong, safe and flexible heavy because they were too heavy for trailer configurations had to be
Due to a lack of suitable equipment haul solution for the client. the quay structure. As a result, organized. On site, deugro’s scope
and infrastructure in the country, the modules had to be moved by included the installation of three

22 23
Project Insight:

The Largest Power Plant


Complex in the Caribbean
deugro (USA), Inc. was contracted to transport all of the
equipment and materials needed for two large Flexicycle™ power
plants in the Dominican Republic. Although this project presented
quite a few challenges for our team, we came up with unique
solutions to each one.

After intensive planning,


conducting route surveys and
feasibility studies, it turned out that
the route required modifications,
such as rerouting traffic;
permanently raising high-voltage
power lines, distribution and
communication lines and taking
down hundreds of illegal lines; as
well as reinforcing a bridge along
the way.

Due to a lack of suitable


transportation equipment available
in the Dominican Republic and
Project Data nearby countries, the decision
• Power vertical: Generation was made to mobilize a fleet of
• Client: Wärtsilä Finland OY Goldhofer THP/SL axle lines, prime
• Project volume: movers, installation equipment and
over 120,000 FRT accessory equipment, owned by system and locally sourced In light of the limited laydown project management and control, management team, in line with new
• Cargo highlights: dhaulage, a company of the deugro hydraulic cranes. area at the project site, deugro job site scheduling and deliveries. vessel arrivals and the availability
80 heavy lift items ranging group. operated a 25,000-square-meter of deugro’s transportation
from 60 to 300 MT As a result of various schedule marshalling yard just outside of the On a couple of occasions, we equipment and manpower. Efficient
• Origins: Italy, Finland, deugro’s scope of work included changes, multiple tasks had to be Port of Caucedo. All cargo, whether had to reschedule planned and professional cooperation and
Poland and Japan international freight forwarding completed in parallel; consequently, breakbulk or containerized, was transportation and installation communication were key to our
• Project location: of equipment and materials from the job site was at times very immediately delivered to the work because some sites were success.
San Pedro de Macoris, all origins, onshore delivery and crowded. During peak construction marshalling yard following customs inaccessible. These changes had to
Dominican Republic installation of 24 300-metric-ton time, there were over 1,200 workers clearance, for subsequent delivery be closely coordinated and agreed
engines, generators and boilers, on site. coordination to the project site. upon between the client’s site
using our own jacking and sliding This set-up was ideal for overall management and deugro’s project

24 25
Challenges during
execution

Transformers to Nova Scotia Solution: We were in constant


Our route from the port to the site communication with the local DOT
took us over a section of road that authorities to ensure we could
the local municipality was planning move out of the port/staging area.
to have resurfaced and repaved. Furthermore, we had to keep the
As a result, if we moved the four units clear of snow while they were
transformers (ranging from 150 waiting to be transported.
to 200 metric tons) over the newly
paved roads, deugro and ABB General equipment
would have to accept all liability. During the months of November
and December 2016, we had more
Solution: We had meetings with than 70 containers arrive at the
the local municipal authorities and Port of Halifax—an average of
Crossing of a fly-over requested they review their plans about 10 per week. The containers
bridge that was installed for the road work and see if there had to be pulled out, destuffed and
to protect a culvert was any way to divert the work to sent back, and material sorted for
Project Insight: other parts of the road that did delivery to two sites.

Maritime Link Project


not involve our travel path. They
subsequently agreed to hold off Solution: Due to a shortage of
paving our section of the road trucks during the holidays and Solution: deugro supported ABB
until the next season. deugro was into January, and a snow storm, we in finding a reputable and reliable
deugro was awarded the contract by ABB to execute the shipment able to deliver all four units by moved the cargo out as quickly as partner to serve as an indoor/
of transformer units and accessories to remote and icy job sites in spring 2017, before the road paving possible for the containers and the outdoor storage location for all
Newfoundland and Nova Scotia on the east coast of Canada. continued. breakbulk, while trying to minimize cargo which could not yet be
any additional costs to ABB. delivered to the Woodbine, Nova
Transformers to Newfoundland Scotia site.
The transported power equipment discharge ports in Nova Scotia and Weather presented a challenge Project site storage
forms part of a renewable energy Newfoundland, the transformers for each transformer move. The ABB was not able to receive all For Newfoundland, we worked
supply link over a distance of were discharged directly to authorities only allow moves over cargo at the site upon arrival. In closely together with ABB to
about 360 kilometers. Because Goldhofer hydraulic trailers or clear roads. Thus, getting the particular indoor items, which made support the management of the
Newfoundland has an excess stored at the port. finalized permits and escorts in up 70 percent of the cargo, needed warehouse and cargo coordination,
of energy thanks to its natural place had to happen quickly. to have a secure, protected storage which helped to ensure a successful
Project Data resources, electricity is transported deugro offered up to four flexible area. project delivery on time.
• Power vertical: Transmission as High Voltage Direct Current storage locations at any given time,
• Cargo: 1 GSU transformer (HVDC) to mainland Canada. The whereby the transformers waited
of 200 MT, 6 HVDC supply link shall allow for electricity on steel stools and beams for their
transformers of 150 MT of up to 500 million Watts to final road transportation to the
each, and accessories overcome great distances with job sites. Further accessories were
• Total volume: 13,000 FRT minimal losses and run in both transported as inland shipments
• Max. heavy lift: 200 MT directions. from the USA and Canada to the
• Commodity: Power plant final job sites or storage locations.
equipment The key cargo that deugro Once the transformers arrived at
• Client: ABB transported for this project their destination, the installation
• Origins: Sweden, Spain, involved power transformers. of cargo onto the foundation took
Germany, Italy and Canada Part of deugro’s scope was the place. All transportation steps up
• Destination: Newfoundland lashing and securing of all items for to final installation were supervised
and Nova Scotia, Canada safe ocean transportation. Once by deugro and engineers from dteq
the ocean voyage from various Transport Engineering Solutions
worldwide locations arrived at the (dteq).

26 27
deugro.com

-02