The document outlines a to-do list from November to May for a capstone project on designing a concrete revetment wall along the Bitanagan River. Key tasks included an initial site visit in November, gathering data from government agencies in December, revising the paper based on panel feedback in January and February, obtaining site permits and conducting a survey in March, performing hydrologic analysis and design work in April, scheduling a defense in May, and submitting the final paper.
The document outlines a to-do list from November to May for a capstone project on designing a concrete revetment wall along the Bitanagan River. Key tasks included an initial site visit in November, gathering data from government agencies in December, revising the paper based on panel feedback in January and February, obtaining site permits and conducting a survey in March, performing hydrologic analysis and design work in April, scheduling a defense in May, and submitting the final paper.
The document outlines a to-do list from November to May for a capstone project on designing a concrete revetment wall along the Bitanagan River. Key tasks included an initial site visit in November, gathering data from government agencies in December, revising the paper based on panel feedback in January and February, obtaining site permits and conducting a survey in March, performing hydrologic analysis and design work in April, scheduling a defense in May, and submitting the final paper.
NOVEMBER confirm problem in DONE community Visiting DPWH, PEO, CEO DECEMBER DONE for data gathering Work on panels’ suggestion DONE during defense JANUARY Submit 1st Revision to DONE Adviser and to Panelists Work on panels’ comments DONE on the 1st revision paper FEBRUARY Submit 2nd Revision to DONE Adviser and Panelists Work on the Final Paper for Chapter 1-3 and submit to APPROVED Ma’am Eballe Submission of softbound SUBMITTED copy for Chapter 1-3 MARCH 2 Visit to site area to ask nd
permission to conduct PERMITTED
survey Preparation of survey DONE Equipments Conduct of Survey ACCOMPLISHED Perform Hydrologic Analysis In Progress Design Phase - Work on computations and - analysis APRIL Work on digital drawings - Work on Chapter 4 - Work on Chapter 5 - Present initial chapter 4-5 - output to adviser Work on modifications on paper and preparation for - defense Schedule defense date - Work on panels’ suggestion MAY - during defense Submit revisions and wait - for approval Submit hardbound copy of - whole capstone paper FLOOD MITIGATION: DESIGN AND ANALYSIS OF CONCRETE REVETMENT WALL AT BITANAGAN RIVER, PUROK DALAMPASIGAN II, BRGY. DON ENRIQUE LOPEZ, CITY OF MATI