You are on page 1of 1

AS-BUILT Drawing of Minor Bridge of Khairlanji - Agasi Road (MP-MDR-42-18)

ABUTMENT RETURN

NOTES :-
1. ALL DIMENSION ARE IN MM OR STATE OTHERWISE.
2. SPECIFICATION;-
CONCRETE- PCC-M-20 ABUTMENT & RETURN.
RCC-M-25 ABUTMENT CAP & DIRT WALL
AGGREGATE- 20 mm & DOWN GRADED
COVER - 40mm
STEEL - H.Y.S.D. BARS Fe500 AS PER IS:1786.
APPROACH SLAB 3. ALL DIMENSION ARE IN MM AND LEVELS ARE IN METERS.
4. REFER SEPARATE DRG. FOR DETAILS OF SUPER STRUCTURE.
5. REFER GENERAL ARRANGEMENT DRAWING
6. SUITABLY DESIGNED FILTER MEDIA SHALL BE PROVIDED BEHIND THE ABUTMENT AND RETURN ABOVE G.L.
7. 100MM Ø WEEP HOLES WITH A.C. PVC PIPES SHALL BE PROVIDED IN RETURN AND ABUTMENT
ABOVE LOW WATER LEVEL & GROUND LEVEL @ 1.0 M C/C WHICH SHALL BE PROVIDED.
DETAIL OF CAP & DIRTWALL 8. IN P.C.C. SURFACE REINFORCEMENT 8 @ 150 C/C BOTHWAYS SHALL BE PROVIDED.
9. S.B.C. AT FOUNDATION LEVEL SHOULD NOT BE LESS THAN 25 T/SQ.M.
10. SPECIAL PRECAUTION SHOULD BE TAKEN TO PREVENT ANY WEDGING AGAINST STRUCTURE DURING
BACK FILLING.
11. THE DESIGN IS BASED ON THE DATA PROVIDED BY CONTRACTOR.

-: CLIENT :- -: CONSULTANTS :- -: CONTRACTOR :- Contractor Consultant Consultant -: PROJECT TITLE :- -: DRAWING TITLE :- Date:- Rev.-

Working Drawing DWG. No._


MADHYA PRADESH ROAD MSV INTTERNATIONAL INC. M/S Sorathia Velji Ratna
DEVELOPMENT LIMITED 45-A, In Association With KHAIRLANJI - AGASI ROAD PROJECT BR-17/KHI-AGS/CH.-0+645
& Co.Vadodra (Gujrat) DETAILS OF
ARERA HILLS, BHOPAL-462011 (M.P.) HIGHWAY ENGINEERING (MP-MDR-42-18) ABUTMENT& RETURN Chainage:- 0+645
MPRDC CONSULTANT
Project Manager Resident Engineer Team Leader Sheet:- 02/04