You are on page 1of 1

Ref.No.

: FIE/ACD/PRD/F/11
Fuel Instruments & Engineers Pvt.Ltd (ACD)
Rev.No : 01/ 01.07.2020
Plot No.1, Old Industrial Estate, Ichalkaranji - 416115 Maharastra,India
Page No. : 1 of 1

TITLE : Daily Production Planning Planing Date : 08.05.2022


1st Shift 2nd Shift
M/C No Operator Shift Time Model Shift O/P Operator Shift Time Model Shift O/P

Ø18 1st & 2nd Machine

1 SPM/06 Chandu 9.00 to 5.30 A24F 6000 No Plan


2 SPM/04 Amir 9.00 to 5.30 A24F 6000 No Plan
3 A24F Chamfer Gokhale 9.00 to 5.30 A24F 6000 No Plan

4 CNC 2nd Opn Sutar 9.00 to 5.30 No Plan

5 Washing M/c-2 Kamat 9.00 to 5.30 No Plan

Ø15 1st & 2nd Machine

6 SPM/01 Anil 9.00 to 5.30 KPLA 7000 No Plan

7 SPM/05 No Plan No Plan

8 SPM/02 Tambekar 4.00 to 12.00 KPLA 7000 No Plan

9 KPLA Chamfer Gokhale 9.00 to 5.30 KPLA 7000 No Plan

10 CNC 2nd Opn Sutar 9.00 to 5.30 KWPH 1500 No Plan

11 Rough Grinding M/C shridhar 9.00 to 5.30 KPLA 7000 + No Plan


K630 +
12 Finish Grinding M/C shridhar 9.00 to 5.30 7000 No Plan
A24F
1.20 Chamfer

13 (FIE/RSM/01) Taral 9.00 to 5.30 K630 2500 No Plan


14 (FIE/RSM/04) No Plan No Plan
Rotary Machine

15 (FIE/RSM/08) No Plan No Plan

16 (FIE/RSM/09) No Plan No Plan

17 (FIE/RSM/10) Sushant 1.00 to 9.30 A65Y 5000 No Plan

18 (FIE/RSM/20) Kharapi 9.00 to 5.30 K630 2500 No Plan

Milling Machine

19 (FIE/RSM/15) No Plan No Plan

20 (FIE/RSM/21) Taral 9.00 to 5.30 K630 2500 No Plan

21 (FIE/RSM/23) No Plan No Plan


22 (FIE/RSM/24) No Plan No Plan

ETP Plant

23 ETP Plant Wadi 9.00 to 5.30 No Plan

Intorque Magdum No Plan

Other No Plan No Plan

PREPARED BY: A.R.K APPROVED BY: A.T.B.