2. The time of chargehands (doing physical work) shall be brought to account, but the time for
foreman and walking overseers will be deemed included as supervision cost. Labour employed
on dayworks shall be based on the grade considered necessary by the Consultant for the
character and scope of work involved.
3. Only time spent exclusively on the variation work concerned and endorsed by the Consultant
will be allowed. A "Day" is defined as normal working day from 8.00 am to 5.00 pm. (with 1 hour
break). Fractions of a day will be paid for "pro-rata".
4. The Following basic daywork rates which upon agreement and acceptance by the Quantity
Surveyors shall be the Contractor's prime cost :-
1 General Labour
2 Ganger/Chargehand
3 Concretor
4 Mason
5 Carpenter/Joiner
8 Welder
9 Rigger/Driller
10 Fitter
11 Pavior/Plasterer
12 Drainlayer
13 Lorry Driver
14 Watchman
15 Plant/Excavator Operator/Driver
16 Electrician
17 Metal Worker
SOR /1
APPENDIX ‘ A ‘
1 Backhoe
2 Dragline
RB 19
RB22
RB30
3 Excavator
Up to 0.5m3
0.5m3 to 1.0m3
over 1.0m3
Up to 0.5m3
0.5m3 to 1.0m3
over 1.0m3
5 Face Shovel
Model 920
Model 950
Model 966
6 Back pusher
8 Compressor
SOR /2
APPENDIX ‘ A ‘
9 Bulldozer
Model D4
Model D6
Model D8
10 Tractor
11 Mobile Crane
3 tonne
16 tonne
25 tonne
35 tonne
40 tonne
12 Motor Grader
13 Dumper
Up to 1.5m3
1.5m3 to 3.5m3
14 Steel Roller
8 tonne
12 tonne
15 Low Loader
SOR /3
APPENDIX ‘ A ‘
16 Lorry
6 tonne
8 tonne
10 tonne
6 tonne
10 tonne
6 tonne
10 tonne Concrete
19 mixer Concrete
mixer 7/5
20 Water Pump
3” Diameter
6 Diameter
8 Diameter
SOR /4
APPENDIX ‘ A ‘
Oxy – acetylene
Electric
23 Others*
5. Working hour(s) from 5.00 pm onwards will be subject to a standard multiplication factor of 1½
times as overtime payment, no matter such overtime payment, no matter such overtime working
hours exceed midnight or not.
………………………………..
(Signature of Tenderer)