NON DESTRUCTIVE EXAMINATION FOR IBR JOBS Date – 08.02.2022


Rev. No. - 01

1. This Non Destructive Examination Plan Exhibit No – 41 Rev. No. 01 complied with the requirements of Indian Boiler Regulation.
2. This NDE Plan shall be followed in addition of any special requirement of customer & engineering drawings.
3. NDE Lab-In charge shall be responsible for all NDE activities as per NDE Plan & authorized for the clearance of all pressure part items, QC In charge/Engineer
shall release the finished items after the clearance report of NDE Department.
Further, Following materials have been covered in this NDE Plan.
Reference
Sr. No. Description
PAGE SERIAL NUMBER
(i) DRUM/SHELL/DISHED HEAD – BUTT JOINT 1&2
(ii) ALL DISHED HEAD (DST,DT & BDT) 3
(iii) DST,DT & BDT 1 OF 4 4
(iv) FORGING 5
(v) COIL TO COIL BUTT JOINT & COIL TO COIL BEND BUTT JOINT 6 TO 17
(vi) PIPE TO PIPE BUTT JOINT 18 TO 21
(vii) PIPE TO FITTING JOINT 2 of 4 22 TO 25
(viii) HEADER TO TUBE STUB JOINT (BRANCH WELDED CONNECTION) 26 TO 35
(ix) HEADER TO PIPE / FORGING STUB JOINT (BRANCH WELDED CONNECTION) 36 TO 42
(x) HEADER TO END PLATE/CAP – BUTT JOINT 43 TO 47
(xi) TUBE BEND / PIPE BEND 3 of 4 48 TO 52
(xii) SWAGED TUBE 53 TO 57
(xiii) FOR ALL PRESSURE PARTS (AFTER REMOVAL OF ALL TEMPERORY SUPPORTS, ARC STRIKE ETC.) 58
(xiv) REMARKS OF NDE PLAN 1 to 4
4 of 4
(xv) LEGENDS – COMPLETE ABBREVIATION OF IMPORTANT MARKS & TESTING PROCESS(*,**,***,##,#) & TESTING PROCESS 1 to 20

PREPARED BY : QA REVIEWED BY : APPROVED BY :


QUALITY CONTROL LAB

Mr. Amrit Pal Singh Mr. Deepak Bahl Mr. Dinesh Rana Mr. Kamaljit Singh Mr. Mahinder Vashisht Mr. CB Singh Mr. Vishal Garg Mr. D.P.S Brar