PIU
Stainless steel grades differ by A handheld XRF PMI gun can analyze, identify and display
chemical composition. The grade and composition of a material in less than 5 seconds
key differences between the without creating any marks on the material or destroying the
various grades are mainly the sample in any way.
amount of Fe (iron), Cr
(chromium), Ni (nickel), Mo
(molybdenum), and Cu
(copper). Some grades are very
different from each other and have different properties; for
example, 400 series stainless steels are magnetic while 300
series stainless steels are not. Other grades are more similar
with very similar properties, and it is much harder to tell the
difference between them without the aid of technology. For
example, 304SS has 18-20% Cr and 8-10.5% Ni, whereas
316SS has 16-18% Cr and 10-14% Ni. Although these alloys
Currently most alloy manufacturers, petroleum refineries, and
other businesses responsible for alloy grade verification use
technology to quickly and easily separate various grades of
stainless steel. The most common, portable, and easy-to-use tool
for this purpose is a handheld XRF (x-ray fluorescence) analyzer.
These instruments are highly accurate at determining the
chemical composition of alloys, and thereby their grade.
Moreover, they do so within a matter of 5 seconds or less for most PMI at Every Step: Frosm the Warehouse to
stainless steel grades, without significant sample preparation, and In-Process
safely. They pay for themselves in terms of reducing materials Because a materials mix-up can happen at any stage of the
mix-ups and getting the best price for scrap identification, and they
process from the alloy fabricator to installation of a part at the
do not require any advanced training to operate. An operator can
be trained to use one within a few hours.
refinery, each petroleum refinery, chemical plant,
petrochemical plant etc. should develop a material
But my material already has a mill stamp on it identifying the
verification program to minimize this risk. It is important to
material?
check every alloy and component multiple times during every
Mixing up material, stamping the wrong grade, losing the
stage; this is known as a 100% PMI protocol. The material
paperwork or having the wrong paperwork are all scenarios
verification program/PMI process should begin at the
that have happened and continue to happen in the metals
incoming materials warehouse, where product may be tested
industry. It´s never done on purpose, but there are
via a PMI spot check method as part of the receiving process.
circumstances that cause these issues making it necessary
As well as PMI testing, a material verification program should
for PMI to be performed at multiple stages of delivery and
provide complete and accurate documentation indicating
use.
which materials have been tested and what the results were.
In process piping, for example, 41% of the largest losses in
the hydrocarbon processing industry are a direct result of
failures in piping systems. One of the first-pass, most
effective ways to prevent such failures is to conduct PMI to
insure that specs are met where corrosion-resistant alloys
are necessary, since corrosion is one of the leading causes
of piping failures.
Material Certifications:
LOAD TEST
JJ Lurgi Engineering Sdn Bhd NDT Testing (PMI and Hardness Testing) 2020
Success
Success forall
for all ofofusus
5
PR Ndt
SAFETY
PIU 18
PIU
PIU
PIU
PR Ndt
Barcode
SURAT KEPUTUSAN MENKUMHAM :
1 a. Pengesahan Akta Pendirian 4019012831104545
b. Lembar Pengesahan Akta AHU-0005884.AH.01.01
SURAT KEPUTUSAN MENKUMHAN: TAHUN 2019
a.Pengesahan Akta Perubahan Terakhir
b.Lembaran Pengesahan Akta Perubahan AHU-00722800.AH.01.02
Terakhir TAHUN 2020
PR Ndt
Barcode
10 EBTKE :
a. Non Destructive Testing (NDT) UPJ2-1/II/2021
b. Industri UPI-2/I/2021
CERTIFICATE
AND DOCUMENT
PR Ndt CERTIFICATE AND DOCUMENT
AND DOCUMENT
CERTIFICATE AND DOCUMENT PR Ndt
AND DOCUMENT
CERTIFICATE AND DOCUMENT PR Ndt
AND DOCUMENT
CERTIFICATE AND DOCUMENT PR Ndt
AND DOCUMENT
CERTIFICATE AND DOCUMENT PR Ndt