• Copyright by Bureau Expo Dubai 2020 (EX20). All rights reserved. This
document may not, in whole or in part, be reproduced, stored, transmitted or
1 2 3 4 5 6 7 8 9 10 distributed in any form or by any means, whether electronic, mechanical, by
work.
• The contractor is responsible for checking that there is no conflict between site
dimensions and drawn dimensions.
• This drawing’s should be read in conjunction with other relevant architectural,
interior design, structural, fire safety, mechanical and electrical drawings and all
relevant sections of the project specifications.
B • The contractor shall submit full shop / setting out drawing for approval (based
on site dimensions) prior to commencement of any site works, placing of
orders, manufacture of fittings, fixtures and components.
• Approved drawings from consultants do not relief the contractors from his
5000
G
LIN
latest edition of Fire and Life Safety Code of practice and the International
PI
Codes & Standards referred to within where applicable.
R
• Safety, Health and Environment Information: brief details on the identified
IE
LD
hazard symbol referencing the unusual residual hazards / risks are listed
SO
above.
C
ITH
DO NOT SCALE THIS DRAWING.
W
NG
N
I
OR
5000
SH
Makk
ah
D
5000
S1
General Notes
5000
F
5000
G
5000
H
5000
- TYPICAL SECTION
I
No Description
Architectural Consultant
S1 SECTION
Project Title
2 SECTION
TYP. DETAIL OF 100 THK. R.C.C. PLANK
(PRECAST) COL-STC1 BEAM-TB1
Approved Seal Date
A.B
Designed Drawn Checked
I.A A.B
Model File Ref: Scale A1(594x841) Revision No
DETAIL-A 6324-USA-ST-M3-001 AS SHOWN 03
PART PLAN OF SOLIDER PILING (SHORING) SECTION A-A Drawing No
6324-USA-ST-DG-ST-1000