Dilg Memocircular 2021412 75f1dc2a7e
Dilg Memocircular 2021412 75f1dc2a7e
2021-04-08-175
ANNEX A.1.1
DOCUMENTARY REQUIREMENTS CHECKLIST
FALGU (Construction, Concreting, Rehabilitation, Repair, or
Improvement of Local Infrastructure)
REGION : ______________________________________________________
PROVINCE : ______________________________________________________
NAME OF LGU : ______________________________________________________
PROGRAM / PROJECT
Construction, concreting, rehabilitation, repair or improvement of any of the following:
(a) Local Roads and / or Bridges �
(b) Public Market �
(c) Slaughterhouse �
(d) Multi – purpose Buildings / Halls �
(e) Multi – purpose Pavements �
(f) Drainage Canals �
(g) Sea Wall / Rivel Wall �
(h) Water System including Level 1 stand alone water points �
(i) Evacuation Center �
(j) Public Park �
(k) Fish Port �
(l) Post-Harvest Facilities composed of Ice Plant and Cold Storage Facility �
� �
Note: DED shall be in accordance with the
design plan, specifications and such other
standards and policies of the National
Government.
(E) Certification on Capability to Implement
the Program / Project issued by DPWH in � �
case to be implemented by
Administration.
� �
Note: Proof that there is no right-of-way issue
shall be attached.
(G) Proof that the LGU has secured all the
necessary clearance or certification from
various National Agencies as prescribed
by law (e.g., ECC, CNC, Water Permit,
� �
NIPAS etc)
PROJECT EXECUTION:
Documentary Completeness and Accuracy (DCA) and Timeliness (T)
PROJECT EXECUTION:
Quality
✔ For this part, the Quality Assurance and Assessment Report (QAAR) Tools shall be used
in ensuring that the quality of the projects has been monitored and compliance to National
Government Standards as stated in the Omnibus Sworn Statement of the LGU.
COMPLIANCE REMARKS
POSTING AND REPORTORIAL REQUIREMENTS
YES NO
MONITORED BY:
_____________________________
MLGOO
_____________________________
PROVINCIAL ENGINEER
ACKNOWLEDGED BY:
_____________________________
LOCAL CHIEF EXECUTIVE / LGU REPRESENTATIVE
ANNEX A.1.2
DOCUMENTARY REQUIREMENTS CHECKLIST
FALGU (Vehicles)
REGION : ______________________________________________________
PROVINCE : ______________________________________________________
NAME OF LGU : ______________________________________________________
PROGRAM / PROJECT
Purchase of the following:
(a) Ambulance �
(b) Truck �
(c) Mini dump truck �
(d) Multi – purpose vehicle �
(e) Multicab �
PROJECT EXECUTION:
Documentary Completeness and Accuracy (DCA) and Timeliness (T)
AVAILABILITY /
DOCUMENTARY
APPLICABILITY REMARKS
REQUIREMENTS
YES NO Actual Date
PRE-PROCUREMENT
(A) Notice of Authority to Debit
Account Issued (NADAI)
� �
Note: Include NADAI No. in the
Remarks.
(B) Confirmation on the Receipt of
Fund. � �
(C) Proof on the transfer of Fund to
LGU Trust Fund � �
Note: Per Section 3.17 of LBC 131
(D) Authority to Purchase
Motorized Vehicle (APMV) /
Confirmation Letter issued by � �
DBM.
PROCUREMENT STAGE
TARG ACTU
ET AL
(A) ITB Posting in PHILGEPS
� �
(B) Opening of Bids
� �
(C) Issuance of Notice of Award
(NOA) � �
(D) Issuance of Notice to Proceed
(NTP) � �
PROJECT IMPLEMENTATION
(A) Certificate of Acceptance
� �
PROJECT EXECUTION:
Quality
AVAILABILITY
DOCUMENTARY REQUIREMENTS REMARKS
YES NO
(I) Profile of Newly Delivered Vehicles
� �
COMPLIANCE REMARKS
POSTING AND REPORTORIAL REQUIREMENTS
YES NO
MONITORED BY:
_____________________________
MLGOO
_____________________________
PROVINCIAL ENGINEER
ACKNOWLEDGED BY:
_____________________________
LOCAL CHIEF EXECUTIVE / LGU REPRESENTATIVE
ANNEX A.1.3
DOCUMENTARY REQUIREMENTS CHECKLIST
FALGU (Street lightning or Barangay Electrification)
REGION : ______________________________________________________
PROVINCE : ______________________________________________________
NAME OF LGU : ______________________________________________________
PROGRAM / PROJECT
(a) Street Lighting or barangay electrification �
� �
Note: Proof that there is no right-of-way
issue shall be attached.
(G) Proof that the LGU has secured all the
necessary clearance or certification
from various National Agencies as
prescribed by law (e.g., ECC, CNC,
� �
etc)
PROJECT EXECUTION:
Documentary Completeness and Accuracy (DCA) and Timeliness (T)
AVAILABILITY /
DOCUMENTARY APPLICABILITY
REMARKS
REQUIREMENTS Target Date
YES NO
Actual Date
PRE-PROCUREMENT
(A) Notice of Authority to Debit
Account Issued (NADAI)
� �
Note: Include NADAI No. in the
Remarks.
(B) Confrmation on the Receipt of
Fund.
� �
Note: Per Section 3.17 of LBC 131
(C) Proof on the transfer of Fund to
LGU Trust Fund � �
PROCUREMENT STAGE
(A) ITB Posting in PHILGEPS
� �
(B) Opening of Bids
� �
(C) Issuance of Notice of Award
(NOA) � �
(D) Issuance of Notice to Proceed
(NTP) � �
PROJECT IMPLEMENTATION
(A) Project Signboard per COA
Circular 2013-004 � �
(B) Request for Work Inspection.
� �
(C) Concrete Pouring Permit
� �
(D) Notice of Defects or
Deficiencies � �
(E) Certificate of Completion
� �
AFTER DEFECTS AND LIABILITY PERIOD (DLP)
(A) Certificate of Final Acceptance
� �
(B) Approved Annual Investment
Program highlighting the
inclusion of maintenance or
repair cost as stated in the � � N/A N/A
Omnibus Sworn Statement of
the LGU.
COMPLIANCE REMARKS
POSTING AND REPORTORIAL REQUIREMENTS
YES NO
MONITORED BY:
_____________________________
MLGOO
_____________________________
PROVINCIAL ENGINEER
ACKNOWLEDGED BY:
_____________________________
LOCAL CHIEF EXECUTIVE / LGU REPRESENTATIVE
ANNEX A.1.4
DOCUMENTARY REQUIREMENTS CHECKLIST
FALGU (Others)
REGION : ______________________________________________________
PROVINCE : ______________________________________________________
NAME OF LGU : ______________________________________________________
PROGRAM / PROJECT
(a) Purchase of Medical Equipment �
(b) Financial Assistance for health and sports program �
(c) Assistance programs and projects for education, health and social protection in light of the
COVID-19 pandemic �
(d) Assistance to indigent individuals in any of the following forms:
d.1. medical �
d.2. burial �
d.3. transportation �
d.4. food assistance �
d.5. cash for work �
d.6. educational assistance �
PROJECT EXECUTION:
Documentary Completeness and Accuracy (DCA) and Timeliness (T)
AVAILABILITY /
DOCUMENTARY APPLICABILITY
REMARKS
REQUIREMENTS Target Date
YES NO
Actual Date
PRE-PROCUREMENT
(A) Notice of Authority to Debit
Account Issued (NADAI)
� �
Note: Include NADAI No. in the
Remarks.
(B) Confirmation on the Receipt of
Fund.
� �
Note: Per Section 3.17 of LBC 131
(C) Proof on the transfer of Fund to
LGU Trust Fund � �
PROCUREMENT STAGE
(A) ITB Posting in PHILGEPS
� �
(B) Opening of Bids
� �
(C) Issuance of Notice of Award
(NOA) � �
(D) Issuance of Notice to Proceed
(NTP) � �
PROJECT IMPLEMENTATION
(A)
(B)
(C)
(D)
COMPLIANCE REMARKS
POSTING AND REPORTORIAL REQUIREMENTS
YES NO
_____________________________
PROVINCIAL ENGINEER
ACKNOWLEDGED BY:
_____________________________
LOCAL CHIEF EXECUTIVES / LGU REPRESENTATIVE
ANNEX A.2.1
DOCUMENTARY REQUIREMENTS CHECKLIST
Support to the Barangay Development Program
REGION : ________________________________________
PROVINCE : ________________________________________
LOCAL GOVERNMENT UNIT : ________________________________________
BARANGAY (ANNEX A DBM LBC 135) : ________________________________________
AVAILABILITY
DOCUMENTARY REQUIREMENTS REMARKS
YES NO
PRE-IMPLEMENTATION
A. Signed request letter by the Punong Barangay containing the
following details:
1. Program / Project Title;
2. Project Location, and
� �
3. Amount
Note: If the request covers two (2) or more programs or projects, list of
programs/ projects in order or priorities shall be attached.
B. Project is included in the Enhanced Barangay Development Plan and
� �
incorporated in the Annual Investment Plan
C. Duly notarized Omnibus Sworn Statement (OSS) – Annex B1
� �
DBM LBC 135
D. Signed LGU Contact Details by the LCE – Annex B2 DBM
� �
LBC 135
AVAILABILITY / APPLICABILITY
DOCUMENTARY
Target Date REMARKS
REQUIREMENTS YES NO
Actual Date
PRE-PROCUREMENT
1. Notice of Authority to Debit
Account Issued (NADAI)
� �
Note: Include NADAI No. in the
Remarks.
2.Confirmation on the Receipt of
Fund. � �
3. Proof on the transfer of Fund to
LGU Trust Fund
� �
Note: Per Section 4.8 of DBM LBC
135
PROCUREMENT STAGE
Mode of Implementation: By Contract By Administration
IF BY CONTRACT
1. ITB Posting in PHILGEPS � �
2. Opening of Bids � �
3. Issuance of Notice of Award
(NOA) � �
4. Issuance of Notice to Proceed
(NTP) � �
AVAILABILITY
IMPLEMENTATION STAGE REMARKS
YES NO
1. Compliance of the project on following (in coordination with the DILG
Provincial Engineer):
1.A National Standards for Specific Project � �
1.B Applicable Provisions of 2021 GAA (RA 11518) � �
1.C Provisions on the DBM LBC 135 � �
AVAILABILITY
REPORTORIAL REQUIREMENTS REMARKS
YES NO
1. Compliance to the posting requirements prescribed under RA No. 9184
� �
and its 2016 Revised IRR and all relevant policies issued by the GPPB
2. Quarterly report/s on fund utilization and status of the program/project
� �
implementation (ANNEX C DBM LBC 135)
3. Compliance to DILG policy on Full Disclosure Policy
MONITORED BY:
_____________________________
MLGOO/CITY/PROVINCIAL DIRECTOR
_____________________________
PROVINCIAL ENGINEER
ACKNOWLEDGED BY:
_____________________________
LOCAL CHIEF EXECUTIVE / LGU REPRESENTATIVE
ANNEX A.2.2
DOCUMENTARY REQUIREMENTS CHECKLIST
Support to the Barangay Development Program
REGION : ________________________________________
PROVINCE : ________________________________________
LOCAL GOVERNMENT UNIT : ________________________________________
BARANGAY (ANNEX A DBM LBC 135) : ________________________________________
AVAILABILITY
DOCUMENTARY REQUIREMENTS REMARKS
YES NO
PRE-IMPLEMENTATION
A. Signed request letter by the Punong Barangay containing the
following details:
1. Program / Project Title;
2. Project Location, and
3. Amount � �
Note: If the request covers two (2) or more programs or projects, list of
programs/ projects in order or priorities shall be attached.
B. Duly notarized Omnibus Sworn Statement (OSS) – Annex B3
� �
DBM LBC 135
C. Signed LGU Contact Details by the LCE – Annex B2 DBM LBC
� �
135
AVAILABILITY / APPLICABILITY
DOCUMENTARY
Target Date REMARKS
REQUIREMENTS YES NO
Actual Date
PRE-PROCUREMENT
1. Notice of Authority to Debit Account
Issued (NADAI)
� �
Note: Include NADAI No. in the
Remarks.
2.Confirmation on the Receipt of Fund. � �
3. Proof on the transfer of Fund to LGU
Trust Fund
� �
Note: Per Section 4.8 of DBM LBC 135
PROCUREMENT STAGE
Mode of Implementation: By Contract By Administration
IF BY CONTRACT
1. ITB Posting in PHILGEPS � �
2. Opening of Bids � �
3. Issuance of Notice of Award (NOA) � �
4. Issuance of Notice to Proceed (NTP) � �
AVAILABILITY
IMPLEMENTATION STAGE REMARKS
YES NO
1. Compliance of the project on following (in coordination with
the DILG Provincial Engineer):
1.A National Standards for Specific Project � �
1.B Applicable Provisions of 2021 GAA (RA 11518) � �
1.C Provisions on the DBM LBC 135 � �
AVAILABILITY
REPORTORIAL REQUIREMENTS REMARKS
YES NO
1. Compliance to the posting requirements prescribed under RA No. 9184
� �
and its 2016 Revised IRR and all relevant policies issued by the GPPB
2. Quarterly report/s on fund utilization and status of the program/project
� �
implementation (ANNEX C DBM LBC 135)
3. Compliance to DILG policy on Full Disclosure Policy
3.1 Posting of report/s in at least three (3) conspicuous public spaces in
� �
the province (one of which shall be in the beneficiary barangay)
3.2 Posting of report/s in the LGU’s Website within 20 calendar days
� �
from end of each quarter
4. Receiving copy of the Notice of posting of report in LGU’s website for
the following:
MONITORED BY:
_____________________________
CITY/PROVINCIAL DIRECTOR
_____________________________
PROVINCIAL ENGINEER
ACKNOWLEDGED BY:
_____________________________
LOCAL CHIEF EXECUTIVE / LGU REPRESENTATIVE
ANNEX A.2.3
TECHNICAL COMPLIANCE REQUIREMENTS CHECKLIST
Support to the Barangay Development Program
INFRASTRUCTURE PROJECT
REGION : _____________________________________
PROVINCE : _____________________________________
LOCAL GOVERNMENT UNIT : _____________________________________
BARANGAY (ANNEX A DBM LBC 135) : _____________________________________
AVAILABLE
SPECIFIC REQUIREMENTS REMARKS
YES NO
BUILDING
A. Program of Work
Note: If the request covers two (2) or more programs or projects, list of � �
programs/ projects in order or priorities shall be attached.
B. Detailed Unit Price
C. Analysis Technical Specification
D. Complete Technical Drawing Plans (Architectural, Civil/Structural,
Sanitary/Plumbing, Electrical, Mechanical)
E. Geotagged Photos of the site
F. Vicinity Map/ Digitized Map
ROAD
A. Program of Works
B. Detailed Unit Price Analysis
C. Complete Technical Drawing Plans (Plans and Profiles; Typical
Roadway Sections and Details; Other component structures such as
Slope Protection/ Canals/ Box Culverts whichever is applicable)
D. Technical Specifications
E. Geotagged Photos of Site (at least 3 sections of the road)
F. Vicinity Map/Digitized Map
WATER AND SANITATION SYSTEMS
G. Program of Work
H. Detailed Unit Price Analysis
I. Simplified Feasibility Study
J. Complete Technical Drawing Plans (Plans and Profiles; Plan,
Elevation and Details of Intake Structure/ Reservoir/Elevated Water
Tank; Details of Wells and Pump House; Details of Trench, Thrust
Blocks, Pipe Bridge, Tap stands if Level II or Stub-outs if Level III)
K. Technical Specifications
L. Water Source Validation Report (with Potability Test Result and
Quantity of Discharge)
M. Hydraulic Analysis
N. Geotagged Photos of Water Source and Site
O. Application of Water Rights from National Water Resources Board
MONITORED BY:
_____________________________
CITY/PROVINCIAL DIRECTOR
_____________________________
PROVINCIAL ENGINEER
ACKNOWLEDGED BY:
_____________________________
LOCAL CHIEF EXECUTIVE / LGU REPRESENTATIVE
ANNEX A.3
DOCUMENTARY REQUIREMENTS CHECKLIST
DISASTER REHABILITATION AND RECONSTRUCTION
ASSISTANCE PROGRAM
REGION : ______________________________________________________
PROVINCE : ______________________________________________________
NAME OF LGU : ______________________________________________________
PROGRAM / PROJECT
Construction, concreting, rehabilitation, repair or improvement of any of the following:
(a) Shelter and Resettlements �
(b) Public Infrastructure (i.e., Roads, Bridges, Flood Control and Public Buildings, and Multi
Purpose Buildings/ Evacuation/ Quarantine Facilities) �
(c) Education and Health Facilities �
(d) Agriculture (i.e., Crops, Livestocks, Fisheries) �
(e) Social Protection �
AVAILABILITY
REMARKS
YES NO
PRE-IMPLEMENTATION (Based on LBC 134)
A. Approved Local Disaster Risk Reduction and Management
Plan (LDRRMP)
� �
Note: LDRRMP should include the projects to be implemented
B. Approved Local Development Investment Program (LDIP)
highlighting the inclusion of the proposed programs / projects. � �
C. Approved Annual Investment Program (AIP) highlighting the
inclusion of the proposed programs / projects. � �
D. Approved Detailed Engineering Design (DED) with POW and
Detailed Estimates.
� �
Note: DED shall be in accordance with the design plan, specifications
and such other standards and policies of the National Government.
E. Report on Fund Utilization and Status of Program / Project
Implementation – Annex C
Note: Proof that the project is not located in the above-mentioned shall
be provided by the LGU.
H. Certification indicating that the project is not fully covered by other
sources of funds � �
PROJECT EXECUTION:
Documentary Completeness and Accuracy (DCA) and Timeliness (T)
AVAILABILITY /
DOCUMENTARY
APPLICABILITY REMARKS
REQUIREMENTS
YES NO Actual Date
PRE-PROCUREMENT
(A) Notice of Authority to Debit
Account Issued (NADAI)
� �
Note: Include NADAI No. in the
Remarks.
(B) Confirmation on the Receipt of
Fund. � �
(C) Proof on the transfer of Fund to
LGU Trust Fund
� �
Note: Per Section 3.17 of LBC 131
PROCUREMENT STAGE
Target Actual
(A) ITB Posting in PHILGEPS
� �
(B) Opening of Bids
� �
(C) Issuance of Notice of Award
(NOA) � �
(D) Issuance of Notice to Proceed
(NTP) � �
PROJECT IMPLEMENTATION
(A) Project Signboard per COA
Circular 2013-004 � �
(B) Request for Work Inspection.
� �
(C) Concrete Pouring Permit
� �
(D) Site Instruction
� �
(E) Certificate of Completion
� �
AFTER DEFECTS AND LIABILITY PERIOD (DLP)
(A) Certificate of Final Acceptance
� �
(B) Approved Annual Investment
Program highlighting the � � N/A N/A
inclusion of maintenance or
repair cost as stated in the
Omnibus Sworn Statement of
the LGU.
PROJECT EXECUTION:
Quality
✔ For this part, the Quality Assurance and Assessment Report (QAAR) Tools shall
be used in ensuring that the quality of the projects has been monitored and
compliance to National Government Standards as stated in the Omnibus Sworn
Statement of the LGU.
COMPLIANCE REMARKS
POSTING AND REPORTORIAL REQUIREMENTS
YES NO
_____________________________
MLGOO
_____________________________
PROVINCIAL ENGINEER
ACKNOWLEDGED BY:
_____________________________
LOCAL CHIEF EXECUTIVE / LGU REPRESENTATIVE
ANNEX A.4
DOCUMENTARY REQUIREMENTS CHECKLIST
LGSF - ASSISTANCE TO CITIES (AC)
(Green Open Spaces or Active Mobility Infrastructure)
REGION : _____________________________________
PROVINCE : _____________________________________
NAME OF LGU (ANNEX B, DBM LBC 133) : _____________________________________
PROJECT TYPE
c. Others ________________________
b. Bicycle Rack/s �
c. Pedestrian Footpath / Walkway �
d. Shared Walkway and Bike Path �
e. Others ________________________
YES NO
· Program of Works
� �
· Detailed Estimates
� �
· By Contract
� �
· By Administration
� �
(Note: If By Administration should be in accordance w/ Appendix 1 of
the 2016 IRR RA 9184)
Note: Consistent with the SP No.4, FY 2021 GAA, the DILG shall be responsible for the monitoring
and evaluation of the actual project implementation, including the documentary requirements to
be submitted by the LGUs to be used for said monitoring and evaluation covered by LGSF.
COMPLIANCE REMARKS
DESIGN CONSIDERATIONS
YES NO
1. Ecosystem Type
(Lowland, Upland, Wetland, Coastal, Riverine, [please input]
Lacustrine/ Lakeshore or Palustrine/
Swampland/ Marshland)
1. Green Infrastructure
� �
2. Blue Infrastructure
� �
PROJECT IMPLEMENTATION
YES NO
PRE-PROCUREMENT
A. Notice of Authority to Debit Account Issued
(NADAI) � �
PROCUREMENT STAGE
A. Procurement Timelines �
�
C. Contract Agreement � �
IMPLEMENTATION STAGE
1. Pre-Construction Conference
� �
2. As-Stake Survey
� �
4. Detailed Drawings
� �
5. Program of Works and Detailed Estimates
� �
6. Construction Schedule
� �
1. Punch List � �
3. Certificate of Completion
� �
4. Certificate of Acceptance
� �
5. Warranty Security
� �
· For the Quality Assurance Inspection, the Quality Assurance and Assessment
Report (QAAR) Tools shall be used in ensuring that the quality of the projects has
been monitored and compliance to National Government Standards.
·
YES NO
MONITORED BY:
_____________________________
CLGOO
_____________________________
ACKNOWLEDGED BY:
_____________________________
PROGRAM / PROJECT
Construction, concreting, rehabilitation, repair or improvement of any of the following:
(a) Local Roads and / or Bridges �
(b) Stand Alone Bridge Component �
PROJECT IMPLEMENTATION:
AVAILABILITY /
DOCUMENTARY REQUIREMENTS APPLICABILITY REMARKS
YES NO
(A) Sanggunian Resolution endorsing the
following projects:
1. ______________________
2. ______________________ � �
3. ______________________
(B) Approved Local Development
Investment Program highlighting the
inclusion of the proposed programs / � �
projects.
� �
Note: DED shall be in accordance with the
design plan, specifications and such other
standards and policies of the National
Government.
(E) No Road Right-of-Way issue
Certification
� �
Note: Proof that there is no right-of-way
issue shall be attached.
(F) Proof that the LGU has secured all the
necessary clearance or certification
from various National Agencies as
prescribed by law (e.g., ECC, CNC, � �
Water Permit, Permit to Cut Trees,
PCA, NIPAS etc)
AVAILABILITY /
DOCUMENTARY
APPLICABILITY REMARKS
REQUIREMENTS
YES NO Actual Date
PRE-PROCUREMENT
(A) Notice of Authority to Debit
Account Issued (NADAI)
� �
Note: Include NADAI No. in the
Remarks.
(B) Confirmation on the Receipt of
Fund. � �
(C) Proof on the transfer of Fund to
LGU Trust Fund
� �
Note: Per Section 3.17 of LBC 131
PROCUREMENT STAGE
Target Actual
(A) ITB Posting in PHILGEPS
� �
(B) Opening of Bids
� �
(C) Issuance of Notice of Award
(NOA) � �
(D) Issuance of Notice to Proceed
(NTP) � �
PROJECT IMPLEMENTATION
(A) Project Signboard per COA
Circular 2013-004 � �
(B) Request for Work Inspection.
� �
(C) Concrete Pouring Permit
� �
(D) Site Instruction
� �
(E) Certificate of Completion
� �
AFTER DEFECTS AND LIABILITY PERIOD (DLP)
(A) Certificate of Final Acceptance
� �
(B) Approved Annual Investment
Program highlighting the
inclusion of maintenance or
repair cost as stated in the � � N/A N/A
Omnibus Sworn Statement of
the LGU.
PROJECT EXECUTION:
Quality
✔ For this part, the Quality Assurance and Assessment Report (QAAR) Tools shall
be used in ensuring that the quality of the projects has been monitored and
compliance to National Government Standards as stated in the Omnibus Sworn
Statement of the LGU.
MONITORED BY:
_____________________________
MLGOO
_____________________________
PROVINCIAL ENGINEER
ACKNOWLEDGED BY:
_____________________________
LOCAL CHIEF EXECUTIVE / LGU REPRESENTATIVE